Home / Browse projects / Thane, Maharashtra / Vastu Rachana

Registered No litigation declared Residential / Group Housing project

Vastu Rachana

By GAGANGIRI INFRA

RG-MH-74178 · RERA P51700050034 · Last updated on MahaRERA portal: 10 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 90%
63 of 84Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

Vastu Rachana is a Residential / Group Housing project by GAGANGIRI INFRA in Thane, Maharashtra, registered with MahaRERA as P51700050034 on 6 Mar 2023. Possession is promised by 20 Dec 2026. 21 of the 84 units on this registration are recorded sold or booked, and 5 of 22 construction stages are filed complete.

At a glance

Project

  • NameVastu Rachana
  • TypeResidential / Group Housing
  • Location
    • Bhosale Nagar
    • Shirgaon
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700050034
  • ReraGenie IDRG-MH-74178

Builder

  • NameGAGANGIRI INFRA
  • Entity typePartnership
  • PartnersCHETAN NARAYAN GAJRA, RAJU LAXMAN KOKARE

Key dates

this monthRegisteredMar 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Mar 2023
  • Promised completion20 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed54 files

Current status

25%21 of 84 units booked

Figures as on 10 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vastu Rachana A WingNA8842042
Vastu Rachana B WingNA8842042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 10 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.

Vastu Rachana A Wing19%
ActivityProgress
Excavation100%
Basement (if any)1%
Podiums (if any)0%
Plinth1%
Stilt Floor100%
Slabs of Super Structure2%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Vastu Rachana B Wing49%
ActivityProgress
Excavation100%
Basement (if any)1%
Podiums (if any)0%
Plinth1%
Stilt Floor100%
Slabs of Super Structure7%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 10 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed83

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots83
Open Space83
BuildingOpen SpaceTotal
Vastu Rachana A Wing4242
Vastu Rachana B Wing4141

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Jul 2026
LandownerVillageDistrict
Shreeji EnterprisesBadlapur (M Cl)Thane
Aruna Ganesh JadhavPune (CB)Pune
Suhas Sakharam LadBadlapur (M Cl)Thane
Anil Sakharam LadBadlapur (M Cl)Thane
Vilas Sakharam LadBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKulgaon Badlapur Municipal Council
Permissible FSI5122.56
Proposed, not sanctioned5,123 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAPMC MARKET SECTOR 19C VASHI NAVI MUMBAI 400703

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMangesh M Agivale MANGESH AGIVALE
EngineerDarshan A Kasture
Chartered AccountantGupta Lodha & Co Ashish Lodha
Chartered AccountantDattatray and Associates
Chartered AccountantHaresh Bhanushali
PartnerRole in project
GAGANGIRI INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 20 Dec 2026

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2022-2023)File: Form No 5 Scan.pdf10 Mar 2026
Form 5 (FY 2023-2024)File: Form 5 2023-24.pdf10 Mar 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2024.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 2024.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf16 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf16 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2024.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf7 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: March 2024 Form 3.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate 31-03-2024.pdf8 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf8 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March.pdf8 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form No 5 Scan.pdf20 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gagangiri Architect Certificate.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gagangiri _Engineer certificate.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2023.pdf1 Mar 2024
Details of encumbrances concerned to FinanceFile: Mortgage deed.pdf15 Dec 2023
Details of encumbrances concerned to LegalFile: Mortgage deed.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-09-2023.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 30-09-2023.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092023.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_Certificate_30062023.pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From_3_30062023.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_Certificate_30062023.pdf27 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 30062023.pdf27 Nov 2023
Copy of the legal title reportFile: Title Report and Power of Attorney.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Feb 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf21 Feb 2023
Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf21 Feb 2023
Declaration about Commencement CertificateFile: Format D Commencement.pdf21 Feb 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE-DRAFT-GAGANGIRI INFRA.pdf21 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A RERA Bank.pdf21 Feb 2023
CERSAI detailsFile: CERSAI.pdf6 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Other Interest Raju K.pdf6 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Other Interest Chetan G.pdf6 Feb 2023
Layout approvalFile: GAGANGIRI INFRA PLAN SHEET 1 , 1MB.PDF31 Jan 2023
Layout approvalFile: GAGANGIRI INFRA PLAN SHEET 2 1MB.PDF31 Jan 2023
Building plan approvalFile: GAGANGIRI INFRA PLAN SHEET 1 , 1MB.PDF31 Jan 2023
PAN CardFile: GAGANGIRI INFRA PAN CARD.pdf31 Jan 2023
Copy of Layout Approval (in case of layout)File: GAGANGIRI INFRA PLAN SHEET 1 , 1MB.PDF31 Jan 2023
Copy of Layout Approval (in case of layout)File: GAGANGIRI INFRA PLAN SHEET 2 1MB.PDF31 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: GAGANGIRI INFRA PLAN SHEET 1 , 1MB.PDF31 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Certificate.pdf31 Jan 2023
Declaration in FORM BFile: FORM B.pdf31 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate wing A.pdf31 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate wing B.pdf31 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf31 Jan 2023
Proforma of Allotment letterFile: Sample Allotment Letter.pdf31 Jan 2023
Deviation Report with respect to Allotment letterFile: Deviation Report Agreement.pdf31 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement.pdf31 Jan 2023

How this compares with Thane

25%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vastu Rachana on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shirgaon7,600+ in Thane

2 kmVastu RachanaCompleted 149Lapsed / revoked 55Other 94Dot size: filed unitsN

Filed coordinates, straight-line distance. 298 registered projects within 2 km.

Builder: GAGANGIRI INFRA

GAGANGIRI INFRA has 1 registration on MahaRERA, including Vastu Rachana. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Vastu Rachana is delayed beyond 20 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vastu Rachana?

The registered promoter entity is GAGANGIRI INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vastu Rachana?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vastu Rachana?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vastu Rachana?

The professionals named in the filing: Architect: Mangesh M Agivale MANGESH AGIVALE; Engineer: Darshan A Kasture; Chartered Accountant: Gupta Lodha & Co Ashish Lodha; Chartered Accountant: Dattatray and Associates; Chartered Accountant: Haresh Bhanushali. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vastu Rachana?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vastu Rachana. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vastu Rachana to a free account