ReraGenieLog inGet a buyer report

Home / Browse projects / Latur, Maharashtra / Vardhan Estate

Registered No litigation declared Residential / Group Housing project

Vardhan Estate

By Vardhan Infra Proprietor Sagar Garad

RG-MH-23787 · RERA P52400079099 · Last updated on MahaRERA portal: 27 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Latur registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
23 of 66Construction stages doneacross 6 buildings; furthest along: Internal walls, 80%
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

Vardhan Estate is a Residential / Group Housing project by Vardhan Infra Proprietor Sagar Garad in Latur, Maharashtra, registered with MahaRERA as P52400079099 on 5 Feb 2025. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameVardhan Estate
  • TypeResidential / Group Housing
  • Location
    • Nideban
    • Nideban (CT)
    • Udgir
    • Latur
    • 413517
  • Pincode413517
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52400079099
  • ReraGenie IDRG-MH-23787

Builder

  • NameVardhan Infra Proprietor Sagar Garad
  • Entity typeIndividual

Key dates

this monthRegisteredFeb 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Feb 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings6 building records
  • Documents filed55 files

Current status

71.7%Work done, per cost certificate

Figures as on 27 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing FNA20000
Wing ENA20000
Wing DNA20000
Wing CNA20000
Wing BNA20000
Wing ANA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 80%.

Wing F82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing E60%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Wing D60%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Wing C52%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B51%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Wing A51%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes0%

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered10
Open Space30
BuildingClosed/CoveredOpen SpaceTotal
Wing F055
Wing E257
Wing D257
Wing C257
Wing B257
Wing A257

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,698 sq m
Land owned byThe promoter, with other names on the file
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jul 2025

Approvals and building plan

Sanctioning authorityTehsildar Udgir
Permissible FSI1128.42
Proposed, not sanctioned1,128 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchARYAN CENTRE, OPP : VAIBHAV THEATRE PUNE SOLAPUR ROAD, HADAPSAR
Estimated costRs 2.40 cr
Cost incurredRs 1.72 cr
Work done71.74%
BuildingWingEstimatedIncurred
Wing FNARs 38.33 lakhRs 20.00 lakh
Wing ENARs 38.33 lakhRs 31.00 lakh
Wing DNARs 38.33 lakhRs 28.00 lakh
Wing CNARs 38.33 lakhRs 31.00 lakh
Wing BNARs 38.33 lakhRs 31.00 lakh
Wing ANARs 38.33 lakhRs 31.00 lakh
-NARs 9.75 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrashant S Borse
ArchitectZeeshan Mundewadi
EngineerPrasad M Jhadav
EngineerSaqlain Shaikh
Chartered AccountantA M KALE & ASSOCIATED
Chartered AccountantHuzaifa Sanawadwala
PartnerRole in project
Vardhan Infra Proprietor Sagar Garad-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Vardhan Form 1 Q42526.pdf27 Jun 2026
Withdrawal Update Form 1File: Vardhan Form 1 Q42526.pdf27 Jun 2026
Withdrawal Update Form 1File: Vardhan Form 1 Q42526.pdf27 Jun 2026
Withdrawal Update Form 2File: Form 2 - Engineer Vardhan Estate Q42526.pdf27 Jun 2026
Withdrawal Update Form 2File: Form 2 - Engineer Vardhan Estate Q42526.pdf27 Jun 2026
Withdrawal Update Form 2File: Form 2 - Engineer Vardhan Estate Q42526.pdf27 Jun 2026
Withdrawal Update Form 3File: Form 3 - CA Vardhan Estate Q42526.pdf27 Jun 2026
Withdrawal Update Form 3File: Form 3 - CA Vardhan Estate Q42526.pdf27 Jun 2026
Withdrawal Update Form 3File: Form 3 - CA Vardhan Estate Q42526.pdf27 Jun 2026
Withdrawal Update Form 1File: Vardhan Form 1 Q325.pdf29 Oct 2025
Withdrawal Update Form 2File: Form 2 - Engineer Vardhan Estate Q325.pdf29 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf29 Oct 2025
Form 1File: Vardhan Form 1 Q225.pdf26 Jul 2025
Form 2File: Form 2 - Engineer Vardhan Estate Q225.pdf26 Jul 2025
Form 3File: Form 3 Q225.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure - Promoter Letterhead Vardhan June 25.pdf26 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vardhan Form 1 Q125.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (37).pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 (17).pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory Disclosure Q125.pdf20 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Email of letter.pdf28 Jan 2025
Other - TechnicalFile: Email of letter.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Vardhan Estate.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Vardhan Estate.pdf24 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Email verify vardhan.pdf24 Jan 2025
Other - TechnicalFile: Email verify vardhan.pdf24 Jan 2025
Details of encumbrances concerned to FinanceFile: Finanace and legal updated.pdf6 Jan 2025
Details of encumbrances concerned to LegalFile: Finanace and legal updated.pdf6 Jan 2025
CERSAI detailsFile: Declaration for CERSAI.pdf3 Jan 2025
Other - FinanceFile: Declaration regarding PAN card.pdf3 Jan 2025
Other - FinanceFile: Nil land cost clarification.pdf3 Jan 2025
Other - FinanceFile: Self declaration regarding 3 bank accounts.pdf3 Jan 2025
Other - FinanceFile: Self declaration regarding 3 bank accounts.pdf3 Jan 2025
Proforma of Agreement for saleFile: AFS as per O60 O63 updated.pdf3 Jan 2025
Copy of the legal title reportFile: Search and Title report Dec 24_compressed.pdf11 Dec 2024
Details of encumbrances concerned to FinanceFile: Finance and laegal'.pdf11 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Revalidated and old Building permission.pdf11 Dec 2024
Declaration about Commencement CertificateFile: Cc declaration dec.pdf11 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about RERA designated bank account.pdf11 Dec 2024
Details of encumbrances concerned to LegalFile: Finance and laegal'.pdf11 Dec 2024
Other - TechnicalFile: Gmail - Verification of Commencement Certificate.pdf11 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B from bank.pdf9 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of finance availed.pdf9 Dec 2024
Building plan approvalFile: Bungalow Sanction_compressed.pdf6 Dec 2024
Layout approvalFile: Bungalow Sanction_compressed.pdf6 Dec 2024
PAN CardFile: Sagar Garad PAN card.pdf6 Dec 2024
Copy of Layout Approval (in case of layout)File: Bungalow Sanction_compressed.pdf6 Dec 2024
Proforma of Allotment letterFile: Allotment Letter final.pdf6 Dec 2024
Declaration in FORM BFile: Form B.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf6 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Bungalow Sanction_compressed.pdf6 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation report of allotment letter.pdf6 Dec 2024
Other - TechnicalFile: Declaration of one plot one registration.pdf6 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report of agreement.pdf6 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organizations.pdf6 Dec 2024

How this compares with Latur

10%of Latur projects moved their completion datethis one has not
31%of Latur registrations have lapsed or been cancelledthis one is on the register

Computed across the 150+ Latur projects on ReraGenie, from their own filings.

Keep Vardhan Estate on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nideban150+ in Latur

Builder: Vardhan Infra Proprietor Sagar Garad

Vardhan Infra Proprietor Sagar Garad has 1 registration on MahaRERA, including Vardhan Estate. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Latur district page.

Frequently asked questions

What are my rights if Vardhan Estate is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vardhan Estate?

The registered promoter entity is Vardhan Infra Proprietor Sagar Garad, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vardhan Estate?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vardhan Estate?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vardhan Estate?

The professionals named in the filing: Architect: Prashant S Borse; Architect: Zeeshan Mundewadi; Engineer: Prasad M Jhadav; Engineer: Saqlain Shaikh; Chartered Accountant: A M KALE & ASSOCIATED; Chartered Accountant: Huzaifa Sanawadwala. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vardhan Estate?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vardhan Estate. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vardhan Estate to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.