Completed No litigation declared Others project

VARDHAMAN MARUTI

By GANDHI AND SAMANI ENTERPRISES

RG-MH-21638 · RERA P51700023432 · Last updated on MahaRERA portal: 19 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Nov 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

VARDHAMAN MARUTI is a Others project by GANDHI AND SAMANI ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700023432 on 12 Dec 2019. The registration is recorded completed; possession was promised by 7 Nov 2024.

At a glance

Project

  • NameVARDHAMAN MARUTI
  • TypeOthers
  • Location
    • NARPOLI ANJURPHATA ROAD
    • 421302
    • Bhiwandi (M Corp.)
    • Bhiwandi
    • Thane
  • Pincode421302
  • RERA no.P51700023432
  • ReraGenie IDRG-MH-21638

Builder

  • NameGANDHI AND SAMANI ENTERPRISES
  • Entity typePartnership
  • PartnersMAHENDRA DELICHAND GANDHI, BHAVESH MAHENDRA GANDHI, LALIT HARIDAS SAMANI, UMASHANKER BENIPRASAD LAHOTI

Key dates

this monthRegisteredDec 2019PromisedNov 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Dec 2019
  • Promised completion7 Nov 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VARDHAMAN MARUTINA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

VARDHAMAN MARUTI: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area997 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
MANGILAL RAJARAM CHOUDHARYBhiwandi (M Corp.)Thane
SHARMILA MAHENDRA JAINBhiwandi (M Corp.)Thane
SHIVAJI RAMCHANDRA MANDOLEBhiwandi (M Corp.)Thane

Approvals and building plan

Permissible FSI2115.62
Proposed, not sanctioned2,116 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchANJURPHATA

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKK AND ASSOCIATES
EngineerKK AND ASSOCIATES
Chartered AccountantNITIN BALAJI DHAVAN
PartnerRole in project
GANDHI AND SAMANI ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Dec 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Feb 2025

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GSE FORM-1 ARCH CERTIFICATE OCT-24.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GSE FORM-1 ARCH CERTIFICATE NOV-24.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GSE FORM-1 ARCH CERTIFICATE NOV-24.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GSE SEPT 24.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GSE SEPT 24.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GSE FORM-2 ENG CERTIFICATE OCT-24.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GSE FORM-2 ENG CERTIFICATE NOV-24.pdf19 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM-4 (GSE).pdf19 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GANDHI AND SAMI ENTERPRISES OC.pdf21 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUNE 24.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GANDHI SAMANI AND ENTERPRISES JUNE 24_11zon.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GSE JUNE.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE 24.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 GSE MARCH 24.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GSE MARCH 24.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A GSE MARCH 24.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 2024 GSE.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 GANDHI SAMANI ENTERPRISES DEC 2023.pdf16 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GANDHI SAMANI ENTERPRISES DEC 2023.pdf16 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GANDHI SAMANI ENTERPRISES DEC 2023.pdf16 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GGE FORM 1 MARCH 23.pdf23 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GGE FORM 1 JUNE 23.pdf23 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GGE FORM 1 SEPT 23.pdf23 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GGE FORM 2 MARCH 23.pdf23 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GGE FORM 2 JUNE 23.pdf23 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GGE FORM 2 SEPT 23.pdf23 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GGE FORM 2A MARCH 23.pdf23 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GGE FORM 3 MARCH 23_11zon.pdf23 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GGE FORM 3 JUNE 23_11zon.pdf23 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GGE FORM 3 SEPT 23_11zon.pdf23 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GGE FORM 5 MARCH 23.pdf23 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 GSE MARCH 20_3_11zon.pdf3 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 GSE MARCH 22_4_11zon.pdf3 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 GSE SEPT 22_5_11zon.pdf3 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 GSE DEC 22_2_11zon.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GSE DEC 19_1_11zon.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 GSE MARCH 20_6_11zon.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 GSE JUNE 20_4_11zon.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 GSE SEPT 20_9_11zon.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GSE DEC 20_2_11zon.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 GSE MARCH 21_7_11zon.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 GSE JUNE 21_5_11zon.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 GSE SEPT 21_10_11zon.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 GSE DEC 21_3_11zon.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 GSE SEPT 21_10_11zon.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 GSE DEC 21_3_11zon.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 GSE MARCH 22_8_11zon.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 GSE JUNE 22.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 GSE SEPT 22.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 GSE DEC 22.pdf3 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GSE DEC19.pdf3 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GSE MARCH 20.pdf3 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GSE JUNE 20.pdf3 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GSE SEPT 20.pdf3 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GSE DECEMBER 20.pdf3 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GSE MARCH 21.pdf3 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GSE JUNE21.pdf3 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GSE SEPT 21.pdf3 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GSE DEC 21.pdf3 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GSE MARCH 2022.pdf3 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GSE JUNE 2022.pdf3 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GSE SEPT 2022.pdf3 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GSE DEC 2022.pdf3 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FROM 5 GSE 19-20_11zon.pdf3 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FROM 5 GSE 20-21.pdf3 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FROM 5 GSE 21-22.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GSE DEC 19_1_11zon.pdf2 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A GSE MARCH 20_1_11zon.pdf2 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A GSE MARCH 21_2_11zon.pdf2 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A GSE MARCH 22_3_11zon.pdf2 May 2023
Layout approvalFile: approved plan.pdf6 Dec 2019
Building plan approvalFile: development.pdf6 Dec 2019
PAN CardFile: PAN.pdf6 Dec 2019
Copy of the legal title reportFile: title search-min.pdf6 Dec 2019
Details of encumbrancesFile: no encumbrances.pdf6 Dec 2019
Copy of Layout Approval (in case of layout)File: approved plan.pdf6 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: development.pdf6 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: permission copy-min.pdf6 Dec 2019
Declaration in FORM BFile: part b ankit-min.pdf6 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1-min.pdf6 Dec 2019

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VARDHAMAN MARUTI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near 4213027,600+ in Thane

Builder: GANDHI AND SAMANI ENTERPRISES

GANDHI AND SAMANI ENTERPRISES has 1 registration on MahaRERA, including VARDHAMAN MARUTI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VARDHAMAN MARUTI is delayed beyond 7 Nov 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VARDHAMAN MARUTI?

The registered promoter entity is GANDHI AND SAMANI ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VARDHAMAN MARUTI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VARDHAMAN MARUTI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VARDHAMAN MARUTI?

The professionals named in the filing: Architect: KK AND ASSOCIATES; Engineer: KK AND ASSOCIATES; Chartered Accountant: NITIN BALAJI DHAVAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VARDHAMAN MARUTI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VARDHAMAN MARUTI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VARDHAMAN MARUTI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.