Home / Browse projects / Pune, Maharashtra / VARAD COMPLEX

Registered No litigation declared Others project

VARAD COMPLEX

By Suprabhat Constructions

RG-MH-17525 · RERA P52100029105 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Feb 2028Possession promisedno revision filed
2 of 44Construction stages doneacross 4 buildings; furthest along: Stilt Floor, 80%
87 of 92Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

VARAD COMPLEX is a Others project by Suprabhat Constructions in Pune, Maharashtra, registered with MahaRERA as P52100029105 on 26 Apr 2021. Possession is promised by 28 Feb 2028. 5 of the 92 units on this registration are recorded sold or booked, and 2 of 44 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameVARAD COMPLEX
  • TypeOthers
  • Location
    • DHAYARI
    • PUNE
    • Dhayari (Part)
    • Haveli
    • 411041
  • Pincode411041
  • RERA no.P52100029105
  • ReraGenie IDRG-MH-17525

Builder

  • NameSuprabhat Constructions
  • Entity typePartnership
  • PartnersDattatray Maruti More, Jaydeep Anandrav Thakare, Pawankumar Bajrangal Chamdia, Pratik Rajendra Pawar, Shashikala Vijay Tapadia, Shrikant Shrirang Kambale
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredApr 2021PromisedFeb 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Apr 2021
  • Promised completion28 Feb 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed91 files

Current status

5%5 of 92 units booked
56.4%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING A WING A AND BNA5432032
AMENITY BUILDINGNA54044
BUILDING BNA5432032
BUILDING CNA5424024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Stilt Floor, at 80%.

BUILDING A WING A AND B48%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
AMENITY BUILDING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed254

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots254
Closed/Covered254
BuildingClosed/CoveredTotal
BUILDING A WING A AND B6060
AMENITY BUILDING3434
BUILDING B100100
BUILDING C6060

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,485 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
Declared on29 May 2026
LandownerVillageDistrict
VIJAY MOHANLAL TAPADIAPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI3667.28
Proposed, not sanctioned3,667 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchV B CAPITAL OPP HOTEL SYMPHONY RANGE HILL ROAD BHOSALE NAGAR SHIVAJINAGAR PUNE MAHARASHTRA 411007
Estimated costRs 11.00 cr
Cost incurredRs 6.21 cr
Work done56.41%
BuildingWingEstimatedIncurred
BUILDING A WING A AND BNARs 2.75 crRs 1.55 cr
AMENITY BUILDINGNARs 2.75 crRs 1.55 cr
BUILDING BNARs 2.75 crRs 1.55 cr
BUILDING CNARs 2.75 crRs 1.55 cr

Certifying professionals and partners10

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTODKARI ASSOCIATES
ArchitectOmkar Deorukhakar
Architectinpact Studio
EngineerRAHUL BODKE Kartik Parekh
EngineerAadi Associates
EngineerNathsinha Yuvraj Chavan
Chartered AccountantCA VAIBHAV MODI
Chartered AccountantNehali & Co
Chartered AccountantPravin Pise
Chartered AccountantVaibhav Bhise
PartnerRole in project
Suprabhat Constructions-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12502599Subhash Bansilal LateUGAM REALITY LLP28/07/2025
CC12502600Subhash Bansilal LateUGAM REALITY LLP28/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Feb 2028

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Plan 01.pdf9 Jun 2026
Building plan approvalFile: Plan 01.pdf9 Jun 2026
Building plan approvalFile: Plan 02.pdf9 Jun 2026
Building plan approvalFile: Plan 03.pdf9 Jun 2026
Building plan approvalFile: Plan 04.pdf9 Jun 2026
Building plan approvalFile: Plan 05.pdf9 Jun 2026
Building plan approvalFile: Plan 06.pdf9 Jun 2026
Building plan approvalFile: Plan 07.pdf9 Jun 2026
Building plan approvalFile: Plan 08.pdf9 Jun 2026
Building plan approvalFile: Plan 09.pdf9 Jun 2026
Building plan approvalFile: Plan 10.pdf9 Jun 2026
Withdrawal Update Form 1File: March 26_05062026143017.PDF9 Jun 2026
Withdrawal Update Form 2File: FM_2_25_26_March_26.pdf9 Jun 2026
Withdrawal Update Form 3File: Form 3.PDF9 Jun 2026
Withdrawal Update Form 1File: FM_2_25_26.pdf6 Jun 2026
Withdrawal Update Form 1File: FM_1_25_26.PDF6 Jun 2026
Withdrawal Update Form 1File: March 26_05062026143017.PDF6 Jun 2026
Withdrawal Update Form 2File: FM_2_25_26_Sep_25.pdf6 Jun 2026
Withdrawal Update Form 2File: FM_2_25_26_Dec_25.pdf6 Jun 2026
Withdrawal Update Form 2File: FM_2_25_26_March_26.pdf6 Jun 2026
Withdrawal Update Form 3File: FM_3_25_26.PDF6 Jun 2026
Withdrawal Update Form 3File: FM_3_25_26.PDF6 Jun 2026
Withdrawal Update Form 3File: FM_3_25_26.PDF6 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A FY-2025-2026 (1).PDF6 Jun 2026
Form 5 (FY 2024-2025)File: Audit 24_25_05062026145814.PDF6 Jun 2026
Form 5 (FY 2023-2024)File: Audit 23_24_05062026145836.PDF6 Jun 2026
Withdrawal Update Form 1File: FM_1_25_26.PDF5 Jun 2026
Withdrawal Update Form 2File: FM_2_25_26June_25.pdf5 Jun 2026
Withdrawal Update Form 3File: FORM 3.pdf5 Jun 2026
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14 Sep 2024.pdf6 Nov 2024
Building plan approvalFile: N A Order.pdf22 Oct 2024
PAN CardFile: PAN CARD - SUPRABHAT CUNSTRUCTIONS.pdf22 Oct 2024
Declaration in FORM BFile: Form B (1).pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: suprabhat constructions ca certificate sept 24_compressed.pdf22 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: N A Order.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Ugam -Sold Booking Inventory.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Ugam -Sold Booking Inventory.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Form1 sep 23.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14 Form1 sep 24.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13 Form1 jun 24.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 Form1 mar 24.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 Form1 dec 23.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 09 Form1 jun 23.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 08 Form1 mar 23.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 07 Form1 dec 22.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 06 Form1 sep 22.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 05 Form1 jun 22.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 Form1 mar 22.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03 Form1 dec 21.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 Form1 sep 21.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 Form1 Jun 21.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 dec 23.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 13 jun 24.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 mar 24.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 sep 23.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 jun 23.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 dec 22.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 sep 22.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 mar 22.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 dec 21.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 sep 21.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 jun 21.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 mar 23.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 march 23.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 June 2024.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 June 2024.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 march 24.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Dec 23.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 sept 23.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 june23.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Dec 22.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 sept 22.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 june22.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 march 22.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Dec 21.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 sept 21.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 june21.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Signed Form-5 Ugam Reality LLP 21-22 (1).pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Form-5 Ugam Reality LLP 22-23 (1).pdf10 Oct 2024

How this compares with Pune

5%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VARAD COMPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

Builder: Suprabhat Constructions

SUPRABHAT CONSTRUCTIONS has 3 registrations on MahaRERA, including AMRUT SHILP and AMRUT PUSHP A. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VARAD COMPLEX is delayed beyond 28 Feb 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VARAD COMPLEX?

The registered promoter entity is Suprabhat Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VARAD COMPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VARAD COMPLEX?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VARAD COMPLEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VARAD COMPLEX?

The professionals named in the filing: Architect: TODKARI ASSOCIATES; Architect: Omkar Deorukhakar; Architect: inpact Studio; Engineer: RAHUL BODKE Kartik Parekh; Engineer: Aadi Associates; Engineer: Nathsinha Yuvraj Chavan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VARAD COMPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VARAD COMPLEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VARAD COMPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.