Home / Browse projects / Pune, Maharashtra / VANTAGIO. PH2

Completed No litigation declared Commercial project

VANTAGIO. PH2

By Harmony Shubham Associates

RG-MH-27613 · RERA P52100034311 · Last updated on MahaRERA portal: 10 Nov 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 17 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Internal walls, 80%
17 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 154 documents Report an error

VANTAGIO. PH2 is a Commercial project by Harmony Shubham Associates in Pune, Maharashtra, registered with MahaRERA as P52100034311 on 30 Mar 2022. The registration is recorded completed; possession was promised by 8 Sep 2025. The completion date has moved by 17 months from the original filing. 1 of the 18 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameVANTAGIO. PH2
  • TypeCommercial
  • Location
    • Hingewadi Road
    • Pune
    • Wakad
    • Mulshi
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100034311
  • ReraGenie IDRG-MH-27613

Builder

  • NameHarmony Shubham Associates
  • Entity typePartnership
  • PartnerSheela Sohanlal Vishnoi
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredMar 2022First promiseApr 2024Revised toSep 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Mar 2022
  • Promised completion8 Sep 2025
  • Revised completionRevised to 8 Sep 2025 (originally 30 Apr 2024)
  • Buildings1 building record
  • Documents filed154 files

Current status

6%1 of 18 units booked
100.0%Work done, per cost certificate

Figures as on 10 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VANTAGIONA9001818

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

VANTAGIO: 95% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,791 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Jun 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI16715.17
Proposed, not sanctioned14,945 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchYES BANK Ltd Ground Floor Shop No 0813 D Building Empire Sector
Estimated costRs 24.07 cr
Cost incurredRs 24.07 cr
Work done100.0%
BuildingWingEstimatedIncurred
VANTAGIONARs 21.43 crRs 21.43 cr
-NARs 2.65 crRs 2.65 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnil Pawar
EngineerUpendra Purandare
EngineerGensys Technologies Pvt Ltd
Chartered AccountantAnuj Agrawal
Chartered AccountantAgarwal Sarawgi & Associates
Chartered AccountantPatel and Sharma
PartnerRole in project
Harmony Shubham Associates-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019564Apr 2024 → Apr 2025

Reason as filed by the promoterProject progress is delayed due to shortage of labour and material. Will require another 12 months to complete the same and obtain occupancy certificate from local authorities.

EA28062501843Apr 2024 → Sep 2025

Reason as filed by the promoterAs of the current date, the project is completed and occupancy certificate is also uploaded on the portal. We have received the Part Occupancy Certificate no. 445/2025 dated 13/06/2025 and following the same we have received the Full Occupancy Certificate No. 696/2025 dated 08/09/2025. Hence, we are applying for the Post Facto extension, i.e. Extension up to the date of OC i.e. 08/09/2025. Hence, I kindly request your consideration to grant us an extension up to 08/09/2024 specified in the attached Form B accompanying this extension application.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed154

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 154 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC verification mail.pdf10 Nov 2025
Withdrawal Update Form 1File: Form 1.pdf3 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf3 Nov 2025
Withdrawal Update Form 3File: Form 3 - Q2 HSA.pdf3 Nov 2025
Form 2A (FY 2021-2022)File: FY 2021-22.pdf3 Nov 2025
Form 2A (FY 2022-2023)File: FY 2022-23.pdf3 Nov 2025
Form 2A (FY 2023-2024)File: FY 2023-24.pdf3 Nov 2025
Form 2A (FY 2024-2025)File: FY 2024-25.pdf3 Nov 2025
Form 5 (FY 2021-2022)File: FY 2021-22.pdf3 Nov 2025
Form 5 (FY 2022-2023)File: FY 2022-23.pdf3 Nov 2025
Form 5 (FY 2023-2024)File: FY 2023-24.pdf3 Nov 2025
Occupational CertificateFile: Full OC _merged.pdf3 Nov 2025
Form 1File: Form 1 Vantagio.pdf1 Nov 2025
Form 2File: Form 2 Vantagio.pdf1 Nov 2025
Form 3File: Form 3 Final.pdf1 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf1 Nov 2025
Form 1File: Form 1 HSA.pdf1 Nov 2025
Form 2File: Form 2 HSA.pdf1 Nov 2025
Form 3File: Form 3 Final compressed.pdf1 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Vantagio.pdf1 Nov 2025
Form 1File: Form 1 Vantagio.pdf1 Nov 2025
Form 2File: Form 2 Vantagio.pdf1 Nov 2025
Form 3File: Form 3 Vantagio Final.pdf1 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Vantagio.pdf1 Nov 2025
Form 1File: Form 1 Q4 Vantagio.pdf1 Nov 2025
Form 2File: Form 2 Q4 Vantagio.pdf1 Nov 2025
Form 3File: Form 3 Q4 Vantagio.pdf1 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q4 Vantagio.pdf1 Nov 2025
Form 1File: Form 1.pdf1 Nov 2025
Form 2File: Form 2.pdf1 Nov 2025
Form 3File: Form 3.pdf1 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf1 Nov 2025
Form 1File: Form 1.pdf1 Nov 2025
Form 2File: Form 2.pdf1 Nov 2025
Form 3File: Form 3.pdf1 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf1 Nov 2025
Form 1File: Form 1.pdf1 Nov 2025
Form 2File: Form 2.pdf1 Nov 2025
Form 3File: Form 3.pdf1 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf1 Nov 2025
Form 1File: Form 1.pdf1 Nov 2025
Form 2File: Form 2.pdf1 Nov 2025
Form 3File: Form 3.pdf1 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf1 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 FY24-25 Vantagio.pdf30 Sep 2025
Form 1File: Form 1.pdf20 Jun 2025
Form 2File: Form 2.pdf20 Jun 2025
Form 3File: Form 3.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf20 Jun 2025
Form 1File: Form 1.pdf20 Jun 2025
Form 2File: Form 2.pdf20 Jun 2025
Form 3File: Form 3.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf20 Jun 2025
Form 1File: Form 1.pdf20 Jun 2025
Form 2File: Form 2.pdf20 Jun 2025
Form 3File: Form 3.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf20 Jun 2025
Form 1File: Form 1.pdf20 Jun 2025
Form 2File: Form 2.pdf20 Jun 2025
Form 3File: Form 3.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf20 Jun 2025
Form 1File: Form 1.pdf20 Jun 2025
Form 2File: Form 2.pdf20 Jun 2025
Form 3File: Form 3.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf20 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 Vantagio.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 Vantagio.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 Vantagio.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Q4 Vantagio.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Vantagio Final.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vantagio.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Vantagio.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Vantagio.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 HSA.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 HSA compressed.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final compressed.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Harmony Shubham Associates.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 HSA.pdf26 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Vantagio.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vantagio.pdf19 Jul 2024

How this compares with Pune

6%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 17 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VANTAGIO. PH2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

2 kmVANTAGIO. PH2Completed 7Lapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: Harmony Shubham Associates

Harmony Shubham Associates has 2 registrations on MahaRERA, including Vantagio and VANTAGIO. PH2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VANTAGIO. PH2 is delayed beyond 8 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VANTAGIO. PH2?

The registered promoter entity is Harmony Shubham Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VANTAGIO. PH2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VANTAGIO. PH2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VANTAGIO. PH2?

The professionals named in the filing: Architect: Anil Pawar; Engineer: Upendra Purandare; Engineer: Gensys Technologies Pvt Ltd; Chartered Accountant: Anuj Agrawal; Chartered Accountant: Agarwal Sarawgi & Associates; Chartered Accountant: Patel and Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VANTAGIO. PH2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VANTAGIO. PH2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VANTAGIO. PH2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.