Home / Browse projects / Pune, Maharashtra / VANTAGIO. PH2
VANTAGIO. PH2
RG-MH-27613 · RERA P52100034311 · Last updated on MahaRERA portal: 10 Nov 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 17 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VANTAGIO. PH2 is a Commercial project by Harmony Shubham Associates in Pune, Maharashtra, registered with MahaRERA as P52100034311 on 30 Mar 2022. The registration is recorded completed; possession was promised by 8 Sep 2025. The completion date has moved by 17 months from the original filing. 1 of the 18 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameVANTAGIO. PH2
- TypeCommercial
- Location
- Hingewadi Road
- Pune
- Wakad
- Mulshi
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100034311
- ReraGenie IDRG-MH-27613
Builder
- NameHarmony Shubham Associates
- Entity typePartnership
- PartnerSheela Sohanlal Vishnoi
- Other registrations1 more →
- Completed2 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on30 Mar 2022
- Promised completion8 Sep 2025
- Revised completionRevised to 8 Sep 2025 (originally 30 Apr 2024)
- Buildings1 building record
- Documents filed154 files
Current status
Figures as on 10 Nov 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VANTAGIO | NA | 9 | 0 | 0 | 18 | 18 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.
VANTAGIO: 95% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 10 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| VANTAGIO | NA | Rs 21.43 cr | Rs 21.43 cr |
| - | NA | Rs 2.65 cr | Rs 2.65 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anil Pawar |
| Engineer | Upendra Purandare |
| Engineer | Gensys Technologies Pvt Ltd |
| Chartered Accountant | Anuj Agrawal |
| Chartered Accountant | Agarwal Sarawgi & Associates |
| Chartered Accountant | Patel and Sharma |
| Partner | Role in project |
|---|---|
| Harmony Shubham Associates | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterProject progress is delayed due to shortage of labour and material. Will require another 12 months to complete the same and obtain occupancy certificate from local authorities.
Reason as filed by the promoterAs of the current date, the project is completed and occupancy certificate is also uploaded on the portal. We have received the Part Occupancy Certificate no. 445/2025 dated 13/06/2025 and following the same we have received the Full Occupancy Certificate No. 696/2025 dated 08/09/2025. Hence, we are applying for the Post Facto extension, i.e. Extension up to the date of OC i.e. 08/09/2025. Hence, I kindly request your consideration to grant us an extension up to 08/09/2024 specified in the attached Form B accompanying this extension application.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed154
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 154 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: OC verification mail.pdf | 10 Nov 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 3 Nov 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 3 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 - Q2 HSA.pdf | 3 Nov 2025 |
| Form 2A (FY 2021-2022)File: FY 2021-22.pdf | 3 Nov 2025 |
| Form 2A (FY 2022-2023)File: FY 2022-23.pdf | 3 Nov 2025 |
| Form 2A (FY 2023-2024)File: FY 2023-24.pdf | 3 Nov 2025 |
| Form 2A (FY 2024-2025)File: FY 2024-25.pdf | 3 Nov 2025 |
| Form 5 (FY 2021-2022)File: FY 2021-22.pdf | 3 Nov 2025 |
| Form 5 (FY 2022-2023)File: FY 2022-23.pdf | 3 Nov 2025 |
| Form 5 (FY 2023-2024)File: FY 2023-24.pdf | 3 Nov 2025 |
| Occupational CertificateFile: Full OC _merged.pdf | 3 Nov 2025 |
| Form 1File: Form 1 Vantagio.pdf | 1 Nov 2025 |
| Form 2File: Form 2 Vantagio.pdf | 1 Nov 2025 |
| Form 3File: Form 3 Final.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf | 1 Nov 2025 |
| Form 1File: Form 1 HSA.pdf | 1 Nov 2025 |
| Form 2File: Form 2 HSA.pdf | 1 Nov 2025 |
| Form 3File: Form 3 Final compressed.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Vantagio.pdf | 1 Nov 2025 |
| Form 1File: Form 1 Vantagio.pdf | 1 Nov 2025 |
| Form 2File: Form 2 Vantagio.pdf | 1 Nov 2025 |
| Form 3File: Form 3 Vantagio Final.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Vantagio.pdf | 1 Nov 2025 |
| Form 1File: Form 1 Q4 Vantagio.pdf | 1 Nov 2025 |
| Form 2File: Form 2 Q4 Vantagio.pdf | 1 Nov 2025 |
| Form 3File: Form 3 Q4 Vantagio.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Q4 Vantagio.pdf | 1 Nov 2025 |
| Form 1File: Form 1.pdf | 1 Nov 2025 |
| Form 2File: Form 2.pdf | 1 Nov 2025 |
| Form 3File: Form 3.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf | 1 Nov 2025 |
| Form 1File: Form 1.pdf | 1 Nov 2025 |
| Form 2File: Form 2.pdf | 1 Nov 2025 |
| Form 3File: Form 3.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf | 1 Nov 2025 |
| Form 1File: Form 1.pdf | 1 Nov 2025 |
| Form 2File: Form 2.pdf | 1 Nov 2025 |
| Form 3File: Form 3.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf | 1 Nov 2025 |
| Form 1File: Form 1.pdf | 1 Nov 2025 |
| Form 2File: Form 2.pdf | 1 Nov 2025 |
| Form 3File: Form 3.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf | 1 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5 FY24-25 Vantagio.pdf | 30 Sep 2025 |
| Form 1File: Form 1.pdf | 20 Jun 2025 |
| Form 2File: Form 2.pdf | 20 Jun 2025 |
| Form 3File: Form 3.pdf | 20 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf | 20 Jun 2025 |
| Form 1File: Form 1.pdf | 20 Jun 2025 |
| Form 2File: Form 2.pdf | 20 Jun 2025 |
| Form 3File: Form 3.pdf | 20 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf | 20 Jun 2025 |
| Form 1File: Form 1.pdf | 20 Jun 2025 |
| Form 2File: Form 2.pdf | 20 Jun 2025 |
| Form 3File: Form 3.pdf | 20 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf | 20 Jun 2025 |
| Form 1File: Form 1.pdf | 20 Jun 2025 |
| Form 2File: Form 2.pdf | 20 Jun 2025 |
| Form 3File: Form 3.pdf | 20 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf | 20 Jun 2025 |
| Form 1File: Form 1.pdf | 20 Jun 2025 |
| Form 2File: Form 2.pdf | 20 Jun 2025 |
| Form 3File: Form 3.pdf | 20 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf | 20 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 Vantagio.pdf | 3 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 Vantagio.pdf | 3 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 Vantagio.pdf | 3 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Q4 Vantagio.pdf | 3 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Vantagio Final.pdf | 24 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vantagio.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Vantagio.pdf | 23 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Vantagio.pdf | 14 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 HSA.pdf | 26 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 HSA compressed.pdf | 26 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final compressed.pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Harmony Shubham Associates.pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 HSA.pdf | 26 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Vantagio.pdf | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vantagio.pdf | 19 Jul 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 154 filed documents as one ZIP, foldered, with a manifest
Keep VANTAGIO. PH2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pune13,700+ in Pune
Filed coordinates, straight-line distance. 10 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: Harmony Shubham Associates
Harmony Shubham Associates has 2 registrations on MahaRERA, including Vantagio and VANTAGIO. PH2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VANTAGIO. PH2 is delayed beyond 8 Sep 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VANTAGIO. PH2?
The registered promoter entity is Harmony Shubham Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VANTAGIO. PH2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VANTAGIO. PH2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VANTAGIO. PH2?
The professionals named in the filing: Architect: Anil Pawar; Engineer: Upendra Purandare; Engineer: Gensys Technologies Pvt Ltd; Chartered Accountant: Anuj Agrawal; Chartered Accountant: Agarwal Sarawgi & Associates; Chartered Accountant: Patel and Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VANTAGIO. PH2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback