Home / Browse projects / Pune, Maharashtra / VANALIKA - PARADISE - PHASE - III-3A

Registered No litigation declared Residential / Group Housing project

VANALIKA - PARADISE - PHASE - III-3A

By M/S. AVIOR MAJESTIQUE PROPERTIES

RG-MH-34296 · RERA P52100019038 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 36 months from the original
10 of 11Construction stages donefurthest along: Stilt Floor, 0%
4 of 166Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 135 documents Report an error

VANALIKA - PARADISE - PHASE - III-3A is a Residential / Group Housing project by M/S. AVIOR MAJESTIQUE PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100019038 on 28 Dec 2018. Possession is promised by 31 Dec 2027. The completion date has moved by 36 months from the original filing. 162 of the 166 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameVANALIKA - PARADISE - PHASE - III-3A
  • TypeResidential / Group Housing
  • Location
    • PIRANGUT
    • PAUD ROAD
    • Mulshi
    • Pune
    • 412108
  • Pincode412108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100019038
  • ReraGenie IDRG-MH-34296

Builder

  • NameM/S. AVIOR MAJESTIQUE PROPERTIES
  • Entity typePartnership
  • PartnersSUNIL SOMANI, MANISH DWARKADAS MAHESHWARI, RAHUL PRADIP RATHI, SAURABH SUNIL MUTHA, MAJESTIQUE LANDMARK PVT LTD THROUGH DIRECTOR MANISH MAHESWARI NA
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2018First promiseDec 2024Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Dec 2018
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed135 files

Current status

98%162 of 166 units booked
100.0%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING - 3ANA16151660166

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.

BUILDING - 3A: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered15

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,436 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on10 Jun 2025
LandownerVillageDistrict
K DEVELOPERSPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGION DEVELOPMENT AUTHORITY PUNE
Permissible FSI6735.54
Proposed, not sanctioned6,736 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 9 TO 14, CHAPHEKAR CENTRE, PUNE SATARA ROAD, PUNE
Estimated costRs 14.70 cr
Cost incurredRs 14.70 cr
Work done100.0%
BuildingWingEstimatedIncurred
BUILDING - 3ANARs 12.40 crRs 12.40 cr
-NARs 2.30 crRs 2.30 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAY AREAM ARCHITECTURAL AND INTERIOR CONSULTANT
EngineerM/s. G. A. Bhilare Consultants Pvt. Ltd.
EngineerNILESH SHETE
EngineerVinod Kathare
EngineerKashinath Dhanave
EngineerPrakash Pawar
Chartered AccountantUMESH JHAWAR AND ASSOCIATES
Chartered AccountantRMS And Associates
Chartered AccountantS S Yelwande Associates
PartnerRole in project
M/S. AVIOR MAJESTIQUE PROPERTIES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025233Dec 2024 → Dec 2025

Reason as filed by the promoterAs we are completed the said Project construction up to 93%. Thus due to the lebour's problems and material shortage, this has been causing delay in completing the remaining construction of the said Project and taking completion certificate.

EA14052620955Dec 2024 → Dec 2027

Reason as filed by the promoterDue to acute shortage of construction materials in the market and persistent labour issues including non-availability of skilled and unskilled workers during the course of the project, the construction of Vanalika Project has been delayed. These factors are beyond the control of the promoter, because of this reason it has become necessary for us to seek for extension of the project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed135

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Vanalika_Form-01_ June 26.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 - Vanalika 3A - Jun 26.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 - Vanalika 3A - Jun 26.pdf20 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A - Vanalika 3A - Mar 26 (1).pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 - Vanalika 3A - Mar 26 (1).pdf3 Jul 2026
Withdrawal Update Form 2File: AMP - FORM 2 - Mar 26 (1).pdf3 Jul 2026
Withdrawal Update Form 3File: AMP - Form 3 - Mar 26...pdf3 Jul 2026
Withdrawal Update Form 1File: Form-01-31-12-25.pdf12 May 2026
Withdrawal Update Form 1File: Form-01-31-12-25.pdf12 May 2026
Withdrawal Update Form 2File: AMP - FORM 2 - Dec 25.pdf12 May 2026
Withdrawal Update Form 2File: AMP - FORM 2 - Dec 25.pdf12 May 2026
Withdrawal Update Form 3File: AMP - FORM 2 - Dec 25...pdf12 May 2026
Withdrawal Update Form 3File: AMP - FORM 3 - Dec 25 (1)_compressed.pdf12 May 2026
Form 5 (FY 2024-2025)File: Form 5 - 2024-25 - Vanalika 3A_compressed.pdf26 Dec 2025
Withdrawal Update Form 1File: Form 1 - Vanalika 3A - Sept 25.pdf28 Nov 2025
Withdrawal Update Form 2File: Form 2 - Vanalika 3A - Sept 25.pdf28 Nov 2025
Withdrawal Update Form 3File: Form 3 - Vanalika 3A - Jun 25.pdf28 Nov 2025
Withdrawal Update Form 1File: Form 1 - Vanalika 3A - Jun 25.pdf26 Jul 2025
Withdrawal Update Form 1File: Form 1 - Vanalika 3A - Jun 25.pdf26 Jul 2025
Withdrawal Update Form 2File: Form 2 - Vanalika 3A - Jun 25.pdf26 Jul 2025
Withdrawal Update Form 2File: Form 2 - Vanalika 3A - Jun 25.pdf26 Jul 2025
Withdrawal Update Form 3File: Form 3 - Vanalika 3A - Jun 25.pdf26 Jul 2025
Withdrawal Update Form 3File: Form 3 - Vanalika 3A - Jun 25.pdf26 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A - Vanalika 3A - Mar 25 New.pdf9 Jun 2025
Form 1File: Form 1 - Vanalika 3A-Mar 25.pdf4 Jun 2025
Form 2File: Form -2- Engineer Certificate - Vanalika 3A-MAR-2025.pdf4 Jun 2025
Form 3File: Form -3- CA Certificate- Vanalika 3A - Mar-25.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Vanalika 3A - Disclosure - Mar - 25.pdf4 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE JAY AERAM.pdf1 Feb 2025
Certificates of CA (Form 3)File: FORM 3_CA umesh_compressed.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER'S CERTIFICATE - COLOUR.pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE_compressed.pdf1 Feb 2025
Declaration in FORM BFile: Form - B_rotated_compressed.pdf20 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form - 5 - 23-24 - Vanalika 3A_rotated.pdf20 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Vanalika 3A-Sept 24.pdf9 Dec 2024
Certificates of CA (Form 3)File: Form -3- CA Certificate- Vanalika 3A - Sept-24.pdf9 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- Engineer Certificate - Vanalika 3A-SEPT-2024.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: Vanalika 3A - Disclosure - Sept - 24.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Vanalika 3A-Jun 24.pdf10 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- Engineer Certificate - Vanalika 3A-JUN-2024.pdf10 Aug 2024
Disclosure of sold/ booked inventoryFile: Vanalika 3A - Disclosure - Jun - 24.pdf10 Aug 2024
Certificates of CA (Form 3)File: Form -3- CA Certificate- Vanalika 3A - Jun-24.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Vanalika 3A-Mar 24.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- Engineer Certificate - Vanalika 3A-Mar-2024.pdf15 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Vanalika 3A - Mar 24.pdf15 Jun 2024
Disclosure of sold/ booked inventoryFile: Vanalika 3A - Disclosure - Mar - 24.pdf15 Jun 2024
Certificates of CA (Form 3)File: Form -3- CA Certificate- Vanalika 3A - Mar-24.pdf15 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Vanalika 3A-Dec 23.pdf6 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- Engineer Certificate - Vanalika 3A-Dec-2023.pdf6 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Vanalika 3A - Dec 23.pdf6 Mar 2024
Disclosure of sold/ booked inventoryFile: Vanalika 3A - Disclosure - Dec - 23.pdf6 Mar 2024
Certificates of CA (Form 3)File: Form -3- CA Certificate- Vanalika 3A - Dec-23.pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Vanalika 3A-Dec 23.pdf15 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- Engineer Certificate - Vanalika 3A-Sept-2023.pdf15 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Vanalika 3A - Sept 23.pdf15 Feb 2024
Disclosure of sold/ booked inventoryFile: Vanalika 3A - Disclosure - Sept - 23.pdf15 Feb 2024
Certificates of CA (Form 3)File: Form -3- CA Certificate- Vanalika 3A - Sept-23.pdf15 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - 2022-23 - Vanalika 3A.pdf28 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Vanalika 3A-Mar 23.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Vanalika 3A-Jun 23.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- Engineer Certificate - Vanalika 3A-MAR-2023.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- Engineer Certificate - Vanalika 3A-JUN-2023.pdf18 Oct 2023
Form 2AFile: Form 2A - Vanalika 3A - Mar 23.pdf18 Oct 2023
Form 2AFile: Form 2A - Vanalika 3A - Jun 23.pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Vanalika 3A - Mar 23.pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Vanalika 3A - Jun 23.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: Vanalika 3A - Disclosure - Mar - 23.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: Vanalika 3A - Disclosure - Jun - 23.pdf18 Oct 2023
Certificates of CA (Form 3)File: Form -3- CA Certificate- Vanalika 3A - Mar-23.pdf18 Oct 2023
Certificates of CA (Form 3)File: Form -3- CA Certificate- Vanalika 3A - Jun-23.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate - Vanalika Build 3 A -30 Jun 2022.pdf8 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate - Vanalika Build 3 A - 30 Sep 2022.pdf8 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate - Vanalika Build 3 A -31 Dec 2022.pdf8 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- Engineer Certificate - Vanalika 3A-JUN-2022.pdf8 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- Engineer Certificate - Vanalika 3A- SEPT-2022.pdf8 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- Engineer Certificate - Vanalika 3A- DEC-2022.pdf8 Aug 2023
Form 2AFile: Form 2A Vanalika Phase 3 A - Jun-2022.pdf8 Aug 2023
Form 2AFile: Form 2A Vanalika Phase 3 A - Sep-2022.pdf8 Aug 2023
Form 2AFile: Form 2A Vanalika Phase 3 A - Dec-2022.pdf8 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Vanalika Phase 3 A - Jun-2022.pdf8 Aug 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
VANALIKA-PARADISE- III -3BP52100016963Pirangut, Pune166Jun 2018CompletedDec 2023Jan 1970

How this compares with Pune

98%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 36 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VANALIKA - PARADISE - PHASE - III-3A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PAUD ROAD13,700+ in Pune

2 kmVANALIKA - PARADISE - PHCompleted 9Lapsed / revoked 7Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: M/S. AVIOR MAJESTIQUE PROPERTIES

M/S. AVIOR MAJESTIQUE PROPERTIES has 3 registrations on MahaRERA, including VANALIKA and VANALIKA-PARADISE- III -3B. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VANALIKA - PARADISE - PHASE - III-3A is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VANALIKA - PARADISE - PHASE - III-3A?

The registered promoter entity is M/S. AVIOR MAJESTIQUE PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VANALIKA - PARADISE - PHASE - III-3A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VANALIKA - PARADISE - PHASE - III-3A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VANALIKA - PARADISE - PHASE - III-3A?

The professionals named in the filing: Architect: JAY AREAM ARCHITECTURAL AND INTERIOR CONSULTANT; Engineer: M/s. G. A. Bhilare Consultants Pvt. Ltd.; Engineer: NILESH SHETE; Engineer: Vinod Kathare; Engineer: Kashinath Dhanave; Engineer: Prakash Pawar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VANALIKA - PARADISE - PHASE - III-3A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VANALIKA - PARADISE - PHASE - III-3A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VANALIKA - PARADISE - PHASE - III-3A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.