Home / Browse projects / Pune, Maharashtra / AMENITY SPACE 1 - NAVYANGAN PHASE - II

Registration lapsed No litigation declared Commercial project

AMENITY SPACE 1 - NAVYANGAN PHASE - II

By AVIOR MERLIN VENTURE LLP

RG-MH-15208 · RERA P52100023131 · Last updated on MahaRERA portal: 22 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 26 months past the filed date
  • 46 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2024Possession promised26 months past this date
5 of 11Construction stages donefurthest along: Internal walls, 93%
46Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

AMENITY SPACE 1 - NAVYANGAN PHASE - II is a Commercial project by AVIOR MERLIN VENTURE LLP in Pune, Maharashtra, registered with MahaRERA as P52100023131 on 2 Dec 2019. Possession was promised by 27 Aug 2024 and is now 26 months past that date. The completion date has moved by 12 months from the original filing. 46 complaints are on record with the regulator.

At a glance

Project

  • NameAMENITY SPACE 1 - NAVYANGAN PHASE - II
  • TypeCommercial
  • Location
    • PAUD ROAD
    • KASAR AMBOLI
    • Mulshi
    • Pune
    • 412108
  • Pincode412108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100023131
  • ReraGenie IDRG-MH-15208

Builder

  • NameAVIOR MERLIN VENTURE LLP
  • Entity typePartnership
  • PartnersAVIOR ENTERPRISES LLP THROUGH PARTNER SUNIL SOMANI, SUNIL CHAMPALAL SOMANI, SHAM BHAGWANDAS LADDHA, RADHA KISAN LADDHA, SAKET SUSHIL MOHTA, KAMLESH BALDEV JHAWAR
  • Other registrations4 more →
  • No longer live5 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

26 months past promisethis monthRegisteredDec 2019First promiseAug 2023Revised toAug 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on2 Dec 2019
  • Promised completion27 Aug 2024
  • Revised completionRevised to 27 Aug 2024 (originally 28 Aug 2023)
  • Buildings1 building record
  • Documents filed121 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AMENITY SPACE 1NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 93%.

AMENITY SPACE 1: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises93%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership10

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,305 sq m
Land owned byThe promoter, with other names on the file
Named landowners10
LandownerVillageDistrict
SAHDEV DHUMALKasar AmboliPune
NAMDEV SUTARKasar AmboliPune
DATTATRAY SUTARKasar AmboliPune
ARUN BHILAREKasar AmboliPune
RAMAKANT DHIDEKasar AmboliPune
BABAN BHILAREKasar AmboliPune
HIRAMAN BHILAREKasar AmboliPune
CHANDRAKANT DHUMALKasar AmboliPune
GULAB SHINDEKasar AmboliPune
NATHU BHILAREKasar AmboliPune

Approvals and building plan

Permissible FSI6058.17
Proposed, not sanctioned6,058 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIVAJI NAGAR, PUNE

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPECTRUM CONSULTANT
ArchitectARCH. SANDEEP HARDIKAR & ASSOCIATES
EngineerParimal Dongre
Chartered AccountantRMS AND ASSOCIATES
PartnerRole in project
AVIOR MERLIN VENTURE LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100017426Aug 2023 → Aug 2024

Reason as filed by the promoter• Brushing aside the fact that substantial nature of development work existed and rights being created by the Applicant, the Applicant were shocked to discover that the State of Maharashtra had issued a Notification dated September 21, 2019 bearing No.PSP.2011/CR. 262/Road-8 under sections 3, 4 and 5 of the Highways Act (“1st NOTIFICATION”), whereby it declared a 110 m wide road cutting across the Building constructed upon the Property to be a highway. • Under the 1st Notification, the State of Maharashtra inter alia declared the lands described in the schedule thereto to be a State Highway (S

Complaints filed with MahaRERA46

Case no.ComplainantRespondentFiled
CC005000000269514GULAB THANWARDAS BHAGTANIAVIOR MERLIN VENTURES LLP29/09/2023
CC005000000310579AKIL ABBAS ALIM/S AVIOR MERLIN VENTURES LLP08/03/2024
CC005000000320599Lijeesh Majeed Subaida BeeviAvior Merlin Ventures LLP15/03/2024
CC005000000320619RAMAN SURESH BABUAVIOR MERLIN VENTURES LLP15/03/2024
CC005000000320620KENET TERENCE COELHOAVIOR MERLIN VENTURES LLP15/03/2024
CC005000000320622PRANJAL JAISWALAVIOR MERLIN VENTURES LLP15/03/2024
CC005000000320650UDAYA KUMAR KRISHNAMOORTHYAVIOR MERLIN VENTURES LLP20/03/2024
CC005000000320651UDAYA KUMAR KRISHNAMOORTHYAVIOR MERIN Ventures LLP20/03/2024
CC005000000340832Mustafa Tayab AliMs AVIOR MERLIN VENTURES LLP25/04/2024
CC005000000340837Mr Burhanuddin Tayab AliMs AVIOR MERLIN VENTURES LLP25/04/2024
CC005000000340867RAJI THOMASM/S AVIOR MERLIN VENTURES LLP01/05/2024
CC005000000340874SAMEENA ANJUM SHERIFFM/S AVIOR MERLIN VENTURES LLP02/05/2024
CC005000000340879HEMANT MADHUKARRAO CHAUDHARIM/S AVIOR MERLIN VENTURES LLP03/05/2024
CC005000000441127VAIBHAV GUPTAM/S AVIOR MERLIN VENTURES LLP18/06/2024
CC005000000461143PRIYANKA RAJENDRA SHINDEMS AVIOR MERLIN VENTURES LLP.18/06/2024
CC005000000471280ALIFIYA ALI ASGAR RAJMs AVIOR MERLIN VENTURES LLP12/07/2024
CC005000000471281ALIFIYA ALI ASGAR RAJMs AVIOR MERLIN VENTURES LLP12/07/2024
CC005000000471374AFSAR HUSSAINMS AVIOR MERLIN VENTURES LLP.23/07/2024
CC005000000471417NAZEEMA MOHAMMED SAHABMS AVIOR MERLIN VENTURES LLP.31/07/2024
CC005000000471421ALVI ZAHID ABDUL REHMANMS AVIOR MERLIN VENTURES LLP.31/07/2024
CC005000000471422AZHAR AHMED SHERIFFMS AVIOR MERLIN VENTURES LLP.31/07/2024
CC12400180Sandesh Ananta BhisekarAVIOR MERLIN VENTURE LLP22/09/2024
CC12400201SAYED HARIS KAZMIAVIOR MERLIN VENTURE LLP23/09/2024
CC12400801BASIT SADIQUE PARKARAVIOR MERLIN VENTURE LLP16/11/2024
CC12401037PRANAV AVINASH AHERAVIOR MERLIN VENTURE LLP05/12/2024
CC12500050DEEPAK GUPTAAVIOR MERLIN VENTURE LLP06/01/2025
CC12500051DEEPAK GUPTAAVIOR MERLIN VENTURE LLP06/01/2025
CC12500725PRAMOD JANARDHAN SHETTYAVIOR MERLIN VENTURE LLP03/03/2025
CC12500850ANIL ATMARAM VALANIAVIOR MERLIN VENTURE LLP12/03/2025
CC12501664RAJNESSH SINHAAVIOR MERLIN VENTURE LLP23/05/2025
CC12501950IMTIYAZ FAZLUDDIN PARKARAVIOR MERLIN VENTURE LLP14/06/2025
CC12502345Vijay Tukaram ShirsatAVIOR MERLIN VENTURE LLP10/07/2025
CC12502513SHINJIN SALIMAVIOR MERLIN VENTURE LLP21/07/2025
CC12502521MEHMOOD MOHAMED HAKIMAVIOR MERLIN VENTURE LLP22/07/2025
CC12503021Manoj Ashok GhadkeAVIOR MERLIN VENTURE LLP27/08/2025
CC12503316LASHMI PRIYAA GOBINATHAVIOR MERLIN VENTURE LLP16/09/2025
CC12503584AMAR RAMESH KOLTEAVIOR MERLIN VENTURE LLP08/10/2025
CC12503607AFRAAH ZAINUL ABEDIN SHAIKHAVIOR MERLIN VENTURE LLP10/10/2025
CC12503610Nisar SangeAVIOR MERLIN VENTURE LLP10/10/2025
CC12503613SACHIDANANDA KRISHNAPPA KANCHANAVIOR MERLIN VENTURE LLP10/10/2025
CC12503614JOSEPH ADDISON BONTHUAVIOR MERLIN VENTURE LLP10/10/2025
CC12503616PRANALINGAM SAGINALAAVIOR MERLIN VENTURE LLP10/10/2025
CC12504189Mohammed Ajaz Mohamed ChandAVIOR MERLIN VENTURE LLP26/11/2025
CC12504179SUNITHA ANOOP NAIRAVIOR MERLIN VENTURE LLP26/11/2025
CC12504185SOWBHAGYA SHANKARAVIOR MERLIN VENTURE LLP26/11/2025
CC12600354santosh Jayawant WaghAVIOR MERLIN VENTURE LLP19/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Amt2 - Mar 25.pdf22 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Amt2 - Mar 25_compressed.pdf22 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Amt2 - Mar 25.pdf22 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure Amt2 - Mar 25_compressed.pdf22 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Amt1 - Dec 24.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Amt1 - Dec 24.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Amt1 - Dec 24.pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure Amt1 - Dec 24.pdf1 Feb 2025
Other - LegalFile: CC005000000340867 -RAji Thomas.pdf24 Jan 2025
Other - LegalFile: CC005000000320651U - daya kumar Krushnamoorthi 1.pdf24 Jan 2025
Other - LegalFile: CC005000000340874 -Sameena Anjum Sheriff.pdf24 Jan 2025
Other - LegalFile: CC005000000340879 -Hemant Chaudhari.pdf24 Jan 2025
Other - LegalFile: CC005000000441127 - Vaibhav Gupta.pdf24 Jan 2025
Other - LegalFile: CC005000000461143 - Priyanka Shinde.pdf24 Jan 2025
Other - LegalFile: CC005000000471374 -Afsar Hussin.pdf24 Jan 2025
Other - LegalFile: CC005000000471417 - Nazeema Saheb.pdf24 Jan 2025
Other - LegalFile: CC005000000471421 -Alvi Rehaman.pdf24 Jan 2025
Other - LegalFile: CC005000000471422 - Azhar Shariff.pdf24 Jan 2025
Other - LegalFile: CC005000000340837 - Burhanuddin Ali.pdf24 Jan 2025
Other - LegalFile: CC005000000340832 - Mustafa Ali.pdf24 Jan 2025
Other - LegalFile: CC005000000320650 Udaya kumar Krushnamoorthi.pdf24 Jan 2025
Other - LegalFile: CC005000000320622 -Pranjal Jaiswal.pdf24 Jan 2025
Other - LegalFile: CC005000000320620 - Kenet Coelho.pdf24 Jan 2025
Other - LegalFile: CC005000000320619 - Raman Babu.pdf24 Jan 2025
Other - LegalFile: CC005000000320599 - Lijeesh Beevi.pdf24 Jan 2025
Other - LegalFile: CC005000000310579 - Akil Ali.pdf24 Jan 2025
Other - LegalFile: CC005000000269514 - Bhagtani.pdf24 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - AMV AMT1 - 2023-2024.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AMT -1 - Sept 24.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AMT - 1 - Sept 24.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AMT -1 - Sept 24.pdf21 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure AMT -1 - Spet 24.pdf21 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AMT -2 - Jun 24.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AMT -2 - Jun 24.pdf8 Oct 2024
Disclosure of sold/ booked inventoryFile: AMT SP 2.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AMT -2 - Jun 24.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AMT -2 - Jun 24.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AMT -2 - Jun 24.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AMT -2 - Jun 24.pdf8 Oct 2024
Disclosure of sold/ booked inventoryFile: AMT SP 2.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nav Amt-1- Mar 24.pdf15 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nav Amt 1 - Mar 24_compressed.pdf15 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Navyangan-Ph-2 -Amt 1 - Mar 24.pdf15 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM-1-Mar-24.pdf15 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-AMV-AM -1-Mar-24_compressed.pdf15 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav -Amt 1- Dec- 23.pdf15 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nav Amt-1 - Dec 23.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nav Amt 1 - Dec 23_compressed.pdf1 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM-1-Dec-23_compressed.pdf1 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-AMV-AM -1-Dec-23_compressed.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nav Amt-1 - Sept 23.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nav Amt 1 - Sept 23.pdf22 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt1- Sept- 23.pdf22 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM-1-Sept-23_compressed.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-AMV-AM -1-Sept-23_compressed.pdf22 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Nav Amt 1- 2022-2023_compressed.pdf28 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nav Amt-1 - Mar 23.pdf24 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nav Amt-1 - Mar 23.pdf24 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nav Amt 1 - Mar 23.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nav Amt 1 - Jun 23.pdf22 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt1- Mar- 23.pdf22 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM-1-Mar-23.pdf22 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM-1-JUN-23.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-AMV-AM -1 - Mar-23_compressed.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-AMV-AM -1-JUN-23.pdf22 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt1- Jun- 22.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt1- Sept- 22.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt1- Dec- 22.pdf25 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-AMT - 1 - JUN-22.pdf11 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-AMT - 1 - SEP-22.pdf11 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-AMT - 1 - DEC-22.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer Certificate AMV-AM1-JUNE 22.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer Certificate AMV-AM1 -Sept 22.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer Certificate AMV-AM1-DEC 22.pdf11 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM1-JUN-22.PDF11 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM1-SEPT-22.PDF11 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM1-DEC-22.PDF11 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-AMV-AM1-JUN-22_compressed.pdf11 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-AMV-AM1-SEPT-22_compressed.pdf11 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-AMV-AM1-DEC-22_compressed.pdf11 Jul 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Prakriti -C- NavyanganKasar Amboli Mulshi Pune95CompletedDec 2017Nov 2017
Nikunj NavyanganKasar Amoli Mulshi Pune244CompletedOct 2017Late, Nov 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AMENITY SPACE 1 - NAVYANGAN PHASE - II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KASAR AMBOLI13,700+ in Pune

2 kmAMENITY SPACE 1 - NAVYANCompleted 20Lapsed / revoked 17Other 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 52 registered projects within 2 km.

Builder: AVIOR MERLIN VENTURE LLP

AVIOR MERLIN VENTURE LLP has 5 registrations on MahaRERA, including AMENITY SPACE 1 - NAVYANGAN PHASE - II and BUILDING - D- WING -D-1- NAVYANGAN PHASE - II. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that AMENITY SPACE 1 - NAVYANGAN PHASE - II shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if AMENITY SPACE 1 - NAVYANGAN PHASE - II is delayed beyond 27 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AMENITY SPACE 1 - NAVYANGAN PHASE - II?

The registered promoter entity is AVIOR MERLIN VENTURE LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AMENITY SPACE 1 - NAVYANGAN PHASE - II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AMENITY SPACE 1 - NAVYANGAN PHASE - II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AMENITY SPACE 1 - NAVYANGAN PHASE - II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AMENITY SPACE 1 - NAVYANGAN PHASE - II?

The professionals named in the filing: Architect: SPECTRUM CONSULTANT; Architect: ARCH. SANDEEP HARDIKAR & ASSOCIATES; Engineer: Parimal Dongre; Chartered Accountant: RMS AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMENITY SPACE 1 - NAVYANGAN PHASE - II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMENITY SPACE 1 - NAVYANGAN PHASE - II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMENITY SPACE 1 - NAVYANGAN PHASE - II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.