Home / Browse projects / Pune, Maharashtra / NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING

Registered No litigation declared Commercial project

NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING

By M/S. AVIOR MERLIN VENTURE LLP

RG-MH-67373 · RERA P52100016507 · Last updated on MahaRERA portal: 12 Nov 2026

Source: official MahaRERA filing

Red flags

  • 20 complaints at MahaRERA
  • Completion date moved by 57 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedmoved 57 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 60%
114 of 262Units unsoldnot recorded sold or booked
20Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING is a Commercial project by M/S. AVIOR MERLIN VENTURE LLP in Pune, Maharashtra, registered with MahaRERA as P52100016507 on 18 May 2018. Possession is promised by 30 Sep 2027. The completion date has moved by 57 months from the original filing. 148 of the 262 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 20 complaints are on record with the regulator.

At a glance

Project

  • NameNAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING
  • TypeCommercial
  • Location
    • PAUD ROAD
    • -
    • Kasar Amboli
    • Mulshi
    • Pune
    • 412108
  • Pincode412108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100016507
  • ReraGenie IDRG-MH-67373

Builder

  • NameM/S. AVIOR MERLIN VENTURE LLP
  • Entity typePartnership
  • PartnersSUNIL SOMANI, SHAM BHAGWANDAS LADDHA, RADHA KISAN LADDHA, SAKET SUSHIL MOHTA, KAMLESH BALDEV JHAWAR, CALYX CONSTRUCTIONS LLP THROUGH SUNIL SOMANI
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredMay 2018First promiseDec 2022Revised toSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 May 2018
  • Promised completion30 Sep 2027
  • Revised completionRevised to 30 Sep 2027 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed129 files

Current status

56%148 of 262 units booked

Figures as on 12 Nov 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AMENITY SPACE 2 BUILDINGNA440262262

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.

AMENITY SPACE 2 BUILDING: 58% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership16

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,870 sq m
Land owned byThe promoter, with other names on the file
Named landowners16
LandownerVillageDistrict
SAHDEV DHUMALKasar AmboliPune
ARJUN DHUMALKasar AmboliPune
NAKUL DHUMALKasar AmboliPune
NAMDEV SUTARKasar AmboliPune
ANANT SUTARKasar AmboliPune
RAJIV SUTARKasar AmboliPune
DATTATRAY SUTARKasar AmboliPune
GANPAT SUTARKasar AmboliPune
ARUN BHILAREKasar AmboliPune
DEEPALI BHILAREKasar AmboliPune
NATHU BHILAREKasar AmboliPune
RAMAKANT DHIDEKasar AmboliPune
BABAN BHILAREKasar AmboliPune
HIRAMAN BHILAREKasar AmboliPune
CHANDRAKANT DHUMALKasar AmboliPune
GULAB SHINDEKasar AmboliPune

Approvals and building plan

Sanctioning authorityPune metropolitan Regional Development Authority, Pune
Permissible FSI5869.61
Proposed, not sanctioned5,678 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIVAJINAGAR PUNE

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCH. SANDEEP HARDIKAR & ASSOCIATES
EngineerSPECTRUM CONSULTANT
EngineerKedari Kakatkar
Chartered AccountantBogati and Company
Chartered AccountantChetan Anpat & Company
Chartered AccountantR M S & Associates
PartnerRole in project
M/S. AVIOR MERLIN VENTURE LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100013327Dec 2022 → Dec 2023

Reason as filed by the promoter(i) Writ Petition bearing No.8490 2021 inter alia challenging the constitutional validity of the Maharashtra Highways Act, 1955, (ii) Writ Petition (St.) No.17509/2021 against the order dated 04.08.2021 thereby specifically directing the Applicant to stop the construction on the affected area till the exact and final boundaries being identified by MSRDC not to proceed with the construction unless the plans are revised in view of proposed ring road and if done, the same would be sole responsibility of the Applicant and (iii) Writ Petition No.10323/2022 challenging the order passed by the Sub-Di

EA29102640718Dec 2022 → Sep 2027

Reason as filed by the promoter1. The Applicant respectfully submits that the delay in completion of the Project was substantially attributable to the proposed alignment of the Pune Western Ring Road, the consequential acquisition-related proceedings and the restrictions imposed by the Pune Metropolitan Region Development Authority (PMRDA) pending finalisation of the said alignment. These circumstances were beyond the reasonable control of the Applicant and materially affected its ability to carry out construction in accordance with the original schedule. The Applicant states that it continuously pursued administrative and

Complaints filed with MahaRERA20

Case no.ComplainantRespondentFiled
CC005000000258878Fatema Husain KundawalaM/S. Avior Merlin Venture LLP04/07/2024
CC005000000279808ALEX VARGHESEAvior Merlin Ventures LLP04/12/2023
CC005000000279809ALEX VARGHESEAvior Merlin Ventures LLP04/12/2023
CC005000000320621KRISHNARAJ G BONAGIRIAvior Merlin Ventures LLP15/03/2024
CC005000000461144RIYAZ MOHAMMED SIDDIQUIMS AVIOR MERLIN VENTURES LLP.18/06/2024
CC005000000471215HABEEB AGHAM/S AVIOR MERLIN VENTURES LL.P11/07/2024
CC12401153ARUN SINGHM/S. AVIOR MERLIN VENTURE LLP17/12/2024
CC12401221Mohd Iqbal AnsariM/S. AVIOR MERLIN VENTURE LLP24/12/2024
CC12500756SRINIVASA RAO POTTAM/S. AVIOR MERLIN VENTURE LLP06/03/2025
CC12500813Haresh PoliyathM/S. AVIOR MERLIN VENTURE LLP10/03/2025
CC12500815Haresh PoliyathM/S. AVIOR MERLIN VENTURE LLP10/03/2025
CC12500851ABBAS ALIM/S. AVIOR MERLIN VENTURE LLP12/03/2025
CC12500852ABBAS ALIM/S. AVIOR MERLIN VENTURE LLP12/03/2025
CC12500856ABBAS ALIM/S. AVIOR MERLIN VENTURE LLP12/03/2025
CC12500858ABBAS SHOEB ALIM/S. AVIOR MERLIN VENTURE LLP12/03/2025
CC12500861ABBAS SHOEB ALIM/S. AVIOR MERLIN VENTURE LLP12/03/2025
CC12500862ABBAS SHOEB ALIM/S. AVIOR MERLIN VENTURE LLP12/03/2025
CC12503058Rajeshkumar Ramanlal ModiM/S. AVIOR MERLIN VENTURE LLP31/08/2025
CC12503605Rashmi Sachin JahagirdarM/S. AVIOR MERLIN VENTURE LLP10/10/2025
CC12607099mohammed jalalludin ahmadM/S. AVIOR MERLIN VENTURE LLP30/10/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 May 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Dec 23.pdf12 Nov 2026
Form 2File: Form 2 - December 23.pdf12 Nov 2026
Form 3File: Form 3 - Dec 23.pdf12 Nov 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 23.pdf12 Nov 2026
Form 2A (FY 2023-2024)File: Navyangan - Form 2A - AM2 2024.pdf3 Nov 2026
Form 5 (FY 2022-2023)File: Form 5 - March 23.pdf3 Nov 2026
Form 2A (FY 2018-2019)File: Form 2A - AS2 - FY18-19.pdf2 Nov 2026
Form 2A (FY 2019-2020)File: Form 2A - AS2 - FY19-20.pdf2 Nov 2026
Form 2A (FY 2020-2021)File: Form 2A - AS2 - FY20-21.pdf2 Nov 2026
Form 2A (FY 2021-2022)File: Form 2A - AS2 - FY21-22.pdf2 Nov 2026
Form 2A (FY 2022-2023)File: Form 2A - AS2 - FY22-23.pdf2 Nov 2026
Form 2A (FY 2023-2024)File: Navyangan - Form 2A - AM2 2024.pdf2 Nov 2026
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt2- Mar 25.pdf30 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Amt2 - Mar 25.pdf22 May 2025
Certificates of CA (Form 3)File: FORM 3 Amt2 - Mar 25_compressed.pdf22 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Amt2 - Mar 25.pdf22 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure Amt2 - Mar 25_compressed.pdf22 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Amt2 - Dec 24.pdf1 Feb 2025
Certificates of CA (Form 3)File: FORM 3 Amt2 - Dec 24.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Amt2 - Dec 24.pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure Amt2 - Dec 24.pdf1 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - AMV AMT2 - 2023-2024.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AMT -2 - Sept 24.pdf21 Dec 2024
Certificates of CA (Form 3)File: FORM 3 AMT -2 - Sept 24.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AMT -2 - Sept 24.pdf21 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure AMT -2 - Sept 24.pdf21 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AMT -2 - Jun 24.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AMT -2 - Jun 24.pdf8 Oct 2024
Disclosure of sold/ booked inventoryFile: AMT SP 2.pdf8 Oct 2024
Certificates of CA (Form 3)File: FORM 3 AMT -2 - Jun 24.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AMT -2 - Jun 24.pdf8 Oct 2024
Certificates of CA (Form 3)File: FORM 3 AMT -2 - Jun 24.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AMT -2 - Jun 24.pdf8 Oct 2024
Disclosure of sold/ booked inventoryFile: AMT SP 2.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nav Amt-2- Mar 24.pdf15 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nav Amt 2 - Mar 24_compressed.pdf15 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Navyangan-Ph-2 -Amt 2 - Mar 24.pdf15 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM-2-Mar 24.pdf15 Jun 2024
Certificates of CA (Form 3)File: Form-3-AMV-AM-2-Mar 24_compressed.pdf15 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt 2- Dec- 23.pdf15 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nav Amt-2 - Dec 23.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nav Amt 2 - Dec 23_compressed.pdf1 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM-2-Dec-23_compressed.pdf1 Feb 2024
Certificates of CA (Form 3)File: Form-3-AMV-AM-2-Dec-23_compressed.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nav Amt-2 - Sept 23.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nav Amt 2 - Sept 23.pdf22 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt2- Sept- 23.pdf22 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM-2-Sept-23_compressed.pdf22 Jan 2024
Certificates of CA (Form 3)File: Form-3-AMV-AM-2-Sept-23_compressed.pdf22 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - AMV AM-2 - 2022-2023.pdf28 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nav Amt-2 - Jun 23.pdf24 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nav Amt-2 - Jun 23.pdf24 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nav Amt 2 - Mar 23.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nav Amt 2 - Jun 23.pdf22 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt2- Mar- 23.pdf22 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM-2-Mar-23.pdf22 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM-2-JUN-23.pdf22 Aug 2023
Certificates of CA (Form 3)File: Form-3-AMV-AM-2-Mar-23.pdf22 Aug 2023
Certificates of CA (Form 3)File: Form-3-AMV-AM-2-JUN-23.pdf22 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form - 2A - Am2 - Mar -22.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form - 2A - Am2 - Mar -22.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form - 2A - Am2 - Mar -22.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt2- Jun- 22.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt2- Sept- 22.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt2- Dec- 22.pdf25 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-AMT - 2 - JUN-22.pdf11 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-AMT - 2 - SEP-22.pdf11 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-AMT - 2 - DEC-22.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer Certificate AMV-AM2-JUNE 22.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer Certificate AMV-AM2 -Sept 22.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer Certificate AMV-AM2 -Sept 22.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer Certificate AMV-AM2-DEC 22.pdf11 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure-AM2-JUN-22.PDF11 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure-AM2-SEPT-22.PDF11 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure-AM2-DEC-22.PDF11 Jul 2023
Certificates of CA (Form 3)File: Form-3-AMV-AM2-JUN-22_compressed.pdf11 Jul 2023
Certificates of CA (Form 3)File: Form-3-AMV-AM2-SEPT-22_compressed.pdf11 Jul 2023
Certificates of CA (Form 3)File: Form-3-AMV-AM2-DEC-22_compressed.pdf11 Jul 2023
Declaration about Commencement CertificateFile: Amenity Space - II - Declaration about CC.pdf16 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer - Navyangan Amenity 2 - MAR 2022.pdf15 Mar 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
PRAKRITI - C- NAVYANGANKASAR AMBOLI TALUKA MULSHI DIST PUNE95CompletedOct 2017Late, Dec 2017
NIKUNJ NAVYANGANKASAR AMBOLI TALUKA MULSHI DIST PUNE244CompletedOct 2017Late, Dec 2017

How this compares with Pune

56%of this project is bookeddistrict median 29%
28%of Pune projects moved their completion datethis one moved by 57 months
25%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 14,000+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -14,000+ in Pune

2 kmNAVYANGAN PHASE-II- AMENCompleted 21Lapsed / revoked 14Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 54 registered projects within 2 km.

Builder: M/S. AVIOR MERLIN VENTURE LLP

M/S. AVIOR MERLIN VENTURE LLP has 3 registrations on MahaRERA, including Navyangan 2- Building C1 and BUILDING D - WING D-2 - NAVYANGAN PHASE - II. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING?

The registered promoter entity is M/S. AVIOR MERLIN VENTURE LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING?

The professionals named in the filing: Architect: ARCH. SANDEEP HARDIKAR & ASSOCIATES; Engineer: SPECTRUM CONSULTANT; Engineer: Kedari Kakatkar; Chartered Accountant: Bogati and Company; Chartered Accountant: Chetan Anpat & Company; Chartered Accountant: R M S & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.