NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING
By M/S. AVIOR MERLIN VENTURE LLP
RG-MH-67373 · RERA P52100016507 · Last updated on MahaRERA portal: 12 Nov 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 20 complaints at MahaRERA
- Completion date moved by 57 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING is a Commercial project by M/S. AVIOR MERLIN VENTURE LLP in Pune, Maharashtra, registered with MahaRERA as P52100016507 on 18 May 2018. Possession is promised by 30 Sep 2027. The completion date has moved by 57 months from the original filing. 148 of the 262 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 20 complaints are on record with the regulator.
At a glance
Project
- NameNAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING
- TypeCommercial
- Location
- PAUD ROAD
- -
- Kasar Amboli
- Mulshi
- Pune
- 412108
- Pincode412108
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100016507
- ReraGenie IDRG-MH-67373
Builder
- NameM/S. AVIOR MERLIN VENTURE LLP
- Entity typePartnership
- PartnersSUNIL SOMANI, SHAM BHAGWANDAS LADDHA, RADHA KISAN LADDHA, SAKET SUSHIL MOHTA, KAMLESH BALDEV JHAWAR, CALYX CONSTRUCTIONS LLP THROUGH SUNIL SOMANI
- Other registrations2 more →
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on18 May 2018
- Promised completion30 Sep 2027
- Revised completionRevised to 30 Sep 2027 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed129 files
Current status
Figures as on 12 Nov 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AMENITY SPACE 2 BUILDING | NA | 4 | 4 | 0 | 262 | 262 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.
AMENITY SPACE 2 BUILDING: 58% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 12 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Land and ownership16
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SAHDEV DHUMAL | Kasar Amboli | Pune |
| ARJUN DHUMAL | Kasar Amboli | Pune |
| NAKUL DHUMAL | Kasar Amboli | Pune |
| NAMDEV SUTAR | Kasar Amboli | Pune |
| ANANT SUTAR | Kasar Amboli | Pune |
| RAJIV SUTAR | Kasar Amboli | Pune |
| DATTATRAY SUTAR | Kasar Amboli | Pune |
| GANPAT SUTAR | Kasar Amboli | Pune |
| ARUN BHILARE | Kasar Amboli | Pune |
| DEEPALI BHILARE | Kasar Amboli | Pune |
| NATHU BHILARE | Kasar Amboli | Pune |
| RAMAKANT DHIDE | Kasar Amboli | Pune |
| BABAN BHILARE | Kasar Amboli | Pune |
| HIRAMAN BHILARE | Kasar Amboli | Pune |
| CHANDRAKANT DHUMAL | Kasar Amboli | Pune |
| GULAB SHINDE | Kasar Amboli | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARCH. SANDEEP HARDIKAR & ASSOCIATES |
| Engineer | SPECTRUM CONSULTANT |
| Engineer | Kedari Kakatkar |
| Chartered Accountant | Bogati and Company |
| Chartered Accountant | Chetan Anpat & Company |
| Chartered Accountant | R M S & Associates |
| Partner | Role in project |
|---|---|
| M/S. AVIOR MERLIN VENTURE LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter(i) Writ Petition bearing No.8490 2021 inter alia challenging the constitutional validity of the Maharashtra Highways Act, 1955, (ii) Writ Petition (St.) No.17509/2021 against the order dated 04.08.2021 thereby specifically directing the Applicant to stop the construction on the affected area till the exact and final boundaries being identified by MSRDC not to proceed with the construction unless the plans are revised in view of proposed ring road and if done, the same would be sole responsibility of the Applicant and (iii) Writ Petition No.10323/2022 challenging the order passed by the Sub-Di
Reason as filed by the promoter1. The Applicant respectfully submits that the delay in completion of the Project was substantially attributable to the proposed alignment of the Pune Western Ring Road, the consequential acquisition-related proceedings and the restrictions imposed by the Pune Metropolitan Region Development Authority (PMRDA) pending finalisation of the said alignment. These circumstances were beyond the reasonable control of the Applicant and materially affected its ability to carry out construction in accordance with the original schedule. The Applicant states that it continuously pursued administrative and
Complaints filed with MahaRERA20
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000258878 | Fatema Husain Kundawala | M/S. Avior Merlin Venture LLP | 04/07/2024 |
| CC005000000279808 | ALEX VARGHESE | Avior Merlin Ventures LLP | 04/12/2023 |
| CC005000000279809 | ALEX VARGHESE | Avior Merlin Ventures LLP | 04/12/2023 |
| CC005000000320621 | KRISHNARAJ G BONAGIRI | Avior Merlin Ventures LLP | 15/03/2024 |
| CC005000000461144 | RIYAZ MOHAMMED SIDDIQUI | MS AVIOR MERLIN VENTURES LLP. | 18/06/2024 |
| CC005000000471215 | HABEEB AGHA | M/S AVIOR MERLIN VENTURES LL.P | 11/07/2024 |
| CC12401153 | ARUN SINGH | M/S. AVIOR MERLIN VENTURE LLP | 17/12/2024 |
| CC12401221 | Mohd Iqbal Ansari | M/S. AVIOR MERLIN VENTURE LLP | 24/12/2024 |
| CC12500756 | SRINIVASA RAO POTTA | M/S. AVIOR MERLIN VENTURE LLP | 06/03/2025 |
| CC12500813 | Haresh Poliyath | M/S. AVIOR MERLIN VENTURE LLP | 10/03/2025 |
| CC12500815 | Haresh Poliyath | M/S. AVIOR MERLIN VENTURE LLP | 10/03/2025 |
| CC12500851 | ABBAS ALI | M/S. AVIOR MERLIN VENTURE LLP | 12/03/2025 |
| CC12500852 | ABBAS ALI | M/S. AVIOR MERLIN VENTURE LLP | 12/03/2025 |
| CC12500856 | ABBAS ALI | M/S. AVIOR MERLIN VENTURE LLP | 12/03/2025 |
| CC12500858 | ABBAS SHOEB ALI | M/S. AVIOR MERLIN VENTURE LLP | 12/03/2025 |
| CC12500861 | ABBAS SHOEB ALI | M/S. AVIOR MERLIN VENTURE LLP | 12/03/2025 |
| CC12500862 | ABBAS SHOEB ALI | M/S. AVIOR MERLIN VENTURE LLP | 12/03/2025 |
| CC12503058 | Rajeshkumar Ramanlal Modi | M/S. AVIOR MERLIN VENTURE LLP | 31/08/2025 |
| CC12503605 | Rashmi Sachin Jahagirdar | M/S. AVIOR MERLIN VENTURE LLP | 10/10/2025 |
| CC12607099 | mohammed jalalludin ahmad | M/S. AVIOR MERLIN VENTURE LLP | 30/10/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 May 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 May 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jan 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 May 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Sep 2027
Documents filed129
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 - Dec 23.pdf | 12 Nov 2026 |
| Form 2File: Form 2 - December 23.pdf | 12 Nov 2026 |
| Form 3File: Form 3 - Dec 23.pdf | 12 Nov 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 23.pdf | 12 Nov 2026 |
| Form 2A (FY 2023-2024)File: Navyangan - Form 2A - AM2 2024.pdf | 3 Nov 2026 |
| Form 5 (FY 2022-2023)File: Form 5 - March 23.pdf | 3 Nov 2026 |
| Form 2A (FY 2018-2019)File: Form 2A - AS2 - FY18-19.pdf | 2 Nov 2026 |
| Form 2A (FY 2019-2020)File: Form 2A - AS2 - FY19-20.pdf | 2 Nov 2026 |
| Form 2A (FY 2020-2021)File: Form 2A - AS2 - FY20-21.pdf | 2 Nov 2026 |
| Form 2A (FY 2021-2022)File: Form 2A - AS2 - FY21-22.pdf | 2 Nov 2026 |
| Form 2A (FY 2022-2023)File: Form 2A - AS2 - FY22-23.pdf | 2 Nov 2026 |
| Form 2A (FY 2023-2024)File: Navyangan - Form 2A - AM2 2024.pdf | 2 Nov 2026 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt2- Mar 25.pdf | 30 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Amt2 - Mar 25.pdf | 22 May 2025 |
| Certificates of CA (Form 3)File: FORM 3 Amt2 - Mar 25_compressed.pdf | 22 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Amt2 - Mar 25.pdf | 22 May 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Amt2 - Mar 25_compressed.pdf | 22 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Amt2 - Dec 24.pdf | 1 Feb 2025 |
| Certificates of CA (Form 3)File: FORM 3 Amt2 - Dec 24.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Amt2 - Dec 24.pdf | 1 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Amt2 - Dec 24.pdf | 1 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - AMV AMT2 - 2023-2024.pdf | 30 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AMT -2 - Sept 24.pdf | 21 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3 AMT -2 - Sept 24.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AMT -2 - Sept 24.pdf | 21 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure AMT -2 - Sept 24.pdf | 21 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AMT -2 - Jun 24.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AMT -2 - Jun 24.pdf | 8 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: AMT SP 2.pdf | 8 Oct 2024 |
| Certificates of CA (Form 3)File: FORM 3 AMT -2 - Jun 24.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AMT -2 - Jun 24.pdf | 8 Oct 2024 |
| Certificates of CA (Form 3)File: FORM 3 AMT -2 - Jun 24.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AMT -2 - Jun 24.pdf | 8 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: AMT SP 2.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nav Amt-2- Mar 24.pdf | 15 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nav Amt 2 - Mar 24_compressed.pdf | 15 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Navyangan-Ph-2 -Amt 2 - Mar 24.pdf | 15 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM-2-Mar 24.pdf | 15 Jun 2024 |
| Certificates of CA (Form 3)File: Form-3-AMV-AM-2-Mar 24_compressed.pdf | 15 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt 2- Dec- 23.pdf | 15 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nav Amt-2 - Dec 23.pdf | 1 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nav Amt 2 - Dec 23_compressed.pdf | 1 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM-2-Dec-23_compressed.pdf | 1 Feb 2024 |
| Certificates of CA (Form 3)File: Form-3-AMV-AM-2-Dec-23_compressed.pdf | 1 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nav Amt-2 - Sept 23.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nav Amt 2 - Sept 23.pdf | 22 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt2- Sept- 23.pdf | 22 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM-2-Sept-23_compressed.pdf | 22 Jan 2024 |
| Certificates of CA (Form 3)File: Form-3-AMV-AM-2-Sept-23_compressed.pdf | 22 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - AMV AM-2 - 2022-2023.pdf | 28 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nav Amt-2 - Jun 23.pdf | 24 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nav Amt-2 - Jun 23.pdf | 24 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nav Amt 2 - Mar 23.pdf | 22 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nav Amt 2 - Jun 23.pdf | 22 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt2- Mar- 23.pdf | 22 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM-2-Mar-23.pdf | 22 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure -AMV-AM-2-JUN-23.pdf | 22 Aug 2023 |
| Certificates of CA (Form 3)File: Form-3-AMV-AM-2-Mar-23.pdf | 22 Aug 2023 |
| Certificates of CA (Form 3)File: Form-3-AMV-AM-2-JUN-23.pdf | 22 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form - 2A - Am2 - Mar -22.pdf | 25 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form - 2A - Am2 - Mar -22.pdf | 25 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form - 2A - Am2 - Mar -22.pdf | 25 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt2- Jun- 22.pdf | 25 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt2- Sept- 22.pdf | 25 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Nav-Amt2- Dec- 22.pdf | 25 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-AMT - 2 - JUN-22.pdf | 11 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-AMT - 2 - SEP-22.pdf | 11 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-AMT - 2 - DEC-22.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer Certificate AMV-AM2-JUNE 22.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer Certificate AMV-AM2 -Sept 22.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer Certificate AMV-AM2 -Sept 22.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer Certificate AMV-AM2-DEC 22.pdf | 11 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure-AM2-JUN-22.PDF | 11 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure-AM2-SEPT-22.PDF | 11 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure-AM2-DEC-22.PDF | 11 Jul 2023 |
| Certificates of CA (Form 3)File: Form-3-AMV-AM2-JUN-22_compressed.pdf | 11 Jul 2023 |
| Certificates of CA (Form 3)File: Form-3-AMV-AM2-SEPT-22_compressed.pdf | 11 Jul 2023 |
| Certificates of CA (Form 3)File: Form-3-AMV-AM2-DEC-22_compressed.pdf | 11 Jul 2023 |
| Declaration about Commencement CertificateFile: Amenity Space - II - Declaration about CC.pdf | 16 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer - Navyangan Amenity 2 - MAR 2022.pdf | 15 Mar 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PRAKRITI - C- NAVYANGAN | KASAR AMBOLI TALUKA MULSHI DIST PUNE | 95 | Completed | Oct 2017 | Late, Dec 2017 |
| NIKUNJ NAVYANGAN | KASAR AMBOLI TALUKA MULSHI DIST PUNE | 244 | Completed | Oct 2017 | Late, Dec 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 14,000+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 129 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near -14,000+ in Pune
Filed coordinates, straight-line distance. 54 registered projects within 2 km.
Navyangan 2- Building C1
M/S. AVIOR MERLIN VENTURE LLP
AMENITY SPACE 1 - NAVYANGAN PHASE - II
AVIOR MERLIN VENTURE LLP
BUILDING - D- WING -D-1- NAVYANGAN PHASE - II
AVIOR MERLIN VENTURE LLP
BUILDING D - WING D-2 - NAVYANGAN PHASE - II
M/S. AVIOR MERLIN VENTURE LLP
HILLS N MILLS
ICONSTRUCT PRIVATE LIMITED
Sparsh Aster
Shree Enterprises
Builder: M/S. AVIOR MERLIN VENTURE LLP
M/S. AVIOR MERLIN VENTURE LLP has 3 registrations on MahaRERA, including Navyangan 2- Building C1 and BUILDING D - WING D-2 - NAVYANGAN PHASE - II. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING is delayed beyond 30 Sep 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING?
The registered promoter entity is M/S. AVIOR MERLIN VENTURE LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING?
The professionals named in the filing: Architect: ARCH. SANDEEP HARDIKAR & ASSOCIATES; Engineer: SPECTRUM CONSULTANT; Engineer: Kedari Kakatkar; Chartered Accountant: Bogati and Company; Chartered Accountant: Chetan Anpat & Company; Chartered Accountant: R M S & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NAVYANGAN PHASE-II- AMENITY SPACE 2 BUILDING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback