Registered No litigation declared Residential / Group Housing project

Vama Park

By Vama Realty

RG-MH-00471 · RERA P49500000044 · Last updated on MahaRERA portal: 6 May 2026

Source: official MahaRERA filing

Red flags

  • Possession 2 months past the filed date
  • Completion date moved by 5 months
  • 1 extension taken
  • Rs 3.50 crore secured on the land, in favour of State Bank of India

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Daman registration emailed to you, free during the pilot beta.
Aug 2026Possession promised2 months past this date
37 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
1 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 110 documents Report an error

Vama Park is a Residential / Group Housing project by Vama Realty in Daman, Daman & Diu, registered with MahaRERA as P49500000044 on 6 Mar 2023. Possession was promised by 31 Aug 2026 and is now 2 months past that date. The completion date has moved by 5 months from the original filing. 34 of the 35 units on this registration are recorded sold or booked, and 37 of 44 construction stages are filed complete.

At a glance

Project

  • NameVama Park
  • TypeResidential / Group Housing
  • Location
    • Vama Parks Survey No. 324/1 and 324/3
    • Opposite Dunetha Gram Panchayat
    • Nani Daman
    • Daman
    • 396210
  • Pincode396210
  • RERA no.P49500000044
  • ReraGenie IDRG-MH-00471

Builder

  • NameVama Realty
  • Entity typePartnership
  • PartnersHimadri Priyank Patel, Mikhil Natvarbhai Tandel, Shiwani Rathi

Key dates

2 months past promisethis monthRegisteredMar 2023First promiseMar 2026Revised toAug 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Mar 2023
  • Promised completion31 Aug 2026
  • Revised completionRevised to 31 Aug 2026 (originally 31 Mar 2026)
  • Buildings4 building records
  • Documents filed110 files

Current status

97%34 of 35 units booked
100.0%Work done, per cost certificate

Figures as on 6 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vama Park Unit 2NA2215015
Vama Park Unit 1NA22303
Vama Park Unit 3NA2210010
Vama Park Unit 4NA22707

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

37 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

Vama Park Unit 291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Vama Park Unit 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Vama Park Unit 391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Vama Park Unit 464%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered35
BuildingClosed/CoveredTotal
Vama Park Unit 21515
Vama Park Unit 133
Vama Park Unit 31010
Vama Park Unit 477

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,710 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofState Bank of India
Secured amountRs 3.50 crore
Declared on24 Jun 2025
LandownerVillageDistrict
Priyank Jayesh-Daman

Approvals and building plan

Sanctioning authorityPlanning & Development Authority Daman
Permissible FSI5716.26
Proposed, not sanctioned5,716 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDeep Complex, Ground Floor, Teen Batti, Nani Daman 396210
Estimated costRs 9.02 cr
Cost incurredRs 9.02 cr
Work done100.0%
BuildingWingEstimatedIncurred
Vama Park Unit 2NARs 3.39 crRs 3.39 cr
Vama Park Unit 3NARs 2.26 crRs 2.26 cr
Vama Park Unit 4NARs 1.55 crRs 1.55 cr
-NARs 1.15 crRs 1.15 cr
Vama Park Unit 1NARs 67.39 lakhRs 67.39 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManish Doshi
EngineerRajesh Tandel
Chartered AccountantRajesh Katariya
Chartered AccountantKakaria and Associates LLP
PartnerRole in project
Vama Realty-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30032620438Mar 2026 → Aug 2026

Reason as filed by the promoterAll the work for our said project are complete and we have applied for the OC. However, due to procedural delay at the end of competent authority, OC for the same is not received, hence we have applied for the extension.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed110

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect certificate 311225.pdf6 May 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf6 May 2026
Withdrawal Update Form 3File: Form 3.pdf6 May 2026
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf16 Jan 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf16 Jan 2026
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf1 Nov 2025
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf1 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf1 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 signed.pdf30 Sep 2025
Form 2A (FY 2022-2023)File: Form 2A-23.pdf22 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A-24.pdf22 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A-25.pdf22 Jul 2025
Form 5 (FY 2022-2023)File: Form 5 Scanned.pdf22 Jul 2025
Form 5 (FY 2023-2024)File: Form 5 signed.pdf22 Jul 2025
Form 1File: form 1 Compressed.pdf9 Jul 2025
Form 2File: form 2 final.pdf9 Jul 2025
Form 3File: Form 3.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf9 Jul 2025
Form 1File: Form 1.pdf9 Jul 2025
Form 2File: Form 2_compressed.pdf9 Jul 2025
Form 3File: Form 3.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf9 Jul 2025
Form 1File: architect 300923compressed.pdf9 Jul 2025
Form 2File: engineer 300923_compressed.pdf9 Jul 2025
Form 3File: Form 3_compressed.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf9 Jul 2025
Form 1File: Form 1.pdf9 Jul 2025
Form 2File: Form 2.pdf9 Jul 2025
Form 3File: Form 3.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf9 Jul 2025
Form 1File: _Architect certificate .pdf9 Jul 2025
Form 2File: Engineers certificate .pdf9 Jul 2025
Form 3File: Form 3.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf9 Jul 2025
Form 1File: architect certificate_compressed.pdf9 Jul 2025
Form 2File: ENGINEER CERTIFICATE_compressed.pdf9 Jul 2025
Form 3File: Form 3_compressed.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf9 Jul 2025
Form 1File: architect certificate.pdf9 Jul 2025
Form 2File: engineer certificate.pdf9 Jul 2025
Form 3File: Form 3_compressed.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf9 Jul 2025
Form 1File: Form 1.pdf9 Jul 2025
Form 2File: Form 2.pdf9 Jul 2025
Form 3File: Form 3.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf9 Jul 2025
Form 1File: Architect certificate.pdf9 Jul 2025
Form 2File: engineers certificate 2025.pdf9 Jul 2025
Form 3File: form 3 vama 31325.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf9 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: architect certificate.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3_compressed.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: engineer certificate.pdf28 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 signed.pdf16 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: architect certificate_compressed.pdf31 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: ENGINEER CERTIFICATE_compressed.pdf31 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3_compressed.pdf31 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: _Architect certificate .pdf1 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Engineers certificate .pdf1 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf1 May 2024
Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A .pdf1 May 2024
Other - FinanceFile: Sold-Unsold.pdf1 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf20 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf20 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf20 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: architect 300923compressed.pdf31 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: engineer 300923_compressed.pdf31 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3_compressed.pdf31 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Scanned.pdf30 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf5 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2_compressed.pdf5 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf5 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: form 1 Compressed.pdf13 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: form 2 final.pdf13 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf13 Jun 2023
Declaration in FORM BFile: FORM B Mikhil.pdf24 Feb 2023

How this compares with Daman

97%of this project is bookeddistrict median 32%
18%of Daman projects moved their completion datethis one moved by 5 months
35%of Daman registrations have lapsed or been cancelledthis one is on the register

Computed across the 59 Daman projects on ReraGenie, from their own filings.

Keep Vama Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opposite Dunetha Gram Panchayat, Nani Daman59 in Daman

Builder: Vama Realty

Vama Realty has 1 registration on MahaRERA, including Vama Park. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Daman district page.

Frequently asked questions

What are my rights if Vama Park is delayed beyond 31 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vama Park?

The registered promoter entity is Vama Realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vama Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vama Park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vama Park?

The professionals named in the filing: Architect: Manish Doshi; Engineer: Rajesh Tandel; Chartered Accountant: Rajesh Katariya; Chartered Accountant: Kakaria and Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vama Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vama Park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vama Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.