ReraGenieLog inGet a buyer report

Home / Browse projects / Daman, Daman & Diu / Fortune DP Nano-2 Phase - 2

Registered No litigation declared Mixed project

Fortune DP Nano-2 Phase - 2

By G B AND ASSOCIATES

RG-MH-00458 · RERA P49500000041 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Daman registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
21 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 50%
156 of 328Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 150 documents Report an error

Fortune DP Nano-2 Phase - 2 is a Mixed project by G B AND ASSOCIATES in Daman, Daman & Diu, registered with MahaRERA as P49500000041 on 3 Feb 2023. Possession is promised by 31 Mar 2027. 172 of the 328 units on this registration are recorded sold or booked, and 21 of 33 construction stages are filed complete.

At a glance

Project

  • NameFortune DP Nano-2 Phase - 2
  • TypeMixed
  • Location
    • Somnath Road
    • Kachigam
    • Others
    • Daman
    • 396210
  • Pincode396210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49500000041
  • ReraGenie IDRG-MH-00458

Builder

  • NameG B AND ASSOCIATES
  • Entity typePartnership
  • GSTIN26AAJFG0484B1ZP
  • PartnersBHAVESH BHUPATRAI SHAH, DIPLAI DARSHAK SHAH, BHARTIBEN GULABBHAI PATEL
  • Other registrations2 more →
  • Completed1 of 3
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Feb 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed150 files

Current status

52%172 of 328 units booked
75.4%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA11066
A2NA8813323156
B1NA881615166

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

21 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

A191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A273%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B132%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed387

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots387
Closed/Covered230
Open Space157
BuildingClosed/CoveredOpen SpaceTotal
A101616
A210587192
B112554179

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,353 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Aug 2025

Approvals and building plan

Sanctioning authorityPlanning and Development Authority Daman
Permissible FSI12337.24
Proposed, not sanctioned12,337 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHALA VAPI
Estimated costRs 22.08 cr
Cost incurredRs 16.64 cr
Work done75.37%
BuildingWingEstimatedIncurred
A2NARs 12.82 crRs 6.59 cr
B1NARs 6.04 crRs 5.58 cr
-NARs 2.85 crRs 4.10 cr
A1NARs 37.04 lakhRs 37.04 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR MANISH DOSHI Doshi
EngineerSHAH PRIYANK RAJESHKUMAR
EngineerDINESHKUMAR Balubhai Patel
Chartered AccountantJIGNESH VASANI j VASANI
Chartered AccountantMANISH GOYAL
Chartered AccountantP.R. Desai &co
Chartered AccountantD.D. PAGARIA & ASSOCIATES
Chartered AccountantDeepika A GUTGUTIYa
PartnerRole in project
G B AND ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed150

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 150 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Layout Plan.pdf22 Apr 2026
Building plan approvalFile: A1 plan.pdf22 Apr 2026
Building plan approvalFile: A2 Plan.pdf22 Apr 2026
Building plan approvalFile: B1 Plan.pdf22 Apr 2026
Building plan approvalFile: Plan Septik Tank - Rain Water Harvesting.pdf22 Apr 2026
Declaration and undertaking (Annexure A)File: Annexure A.pdf22 Apr 2026
Withdrawal Update Form 1File: Form-1 Fortune DP Nano-2 Phase-2 31-03-2026.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf21 Apr 2026
Withdrawal Update Form 3File: Nano 2 Phase 2 Form 3.pdf21 Apr 2026
Withdrawal Update Form 1File: Form-1 Fortune DP Nano-2 Phase-2 31-03-2026.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Form-3 Nano2 Phase2 30-9-23-compressed_compressed (1).pdf20 Apr 2026
Form 1File: Form-1 Fortune DP Nano-2 Phase-2 31-12-2025.pdf21 Jan 2026
Form 2File: Form 2 Nano 2 Phase 2.pdf21 Jan 2026
Form 3File: Form 3 n2 p2.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure n2 P2.pdf21 Jan 2026
Form 1File: Form-1 31-12-2023.pdf13 Jan 2026
Form 2File: 31_12_23_Form 2.pdf13 Jan 2026
Form 3File: Form 3.pdf13 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31_12_23 N2P2 Disclouser.PDF13 Jan 2026
Form 1File: Form-1 31-12-2024.pdf13 Jan 2026
Form 2File: FORM-2 31-12-2024.PDF13 Jan 2026
Form 3File: Form 3.pdf13 Jan 2026
Disclosure of Sold and Booked InventoryFile: GB 31-12-24 (11) Disclosure.pdf13 Jan 2026
Form 1File: Form-1 31-03-2025.pdf13 Jan 2026
Form 2File: FORM-2 31-03-2025.PDF13 Jan 2026
Form 3File: Form 3.pdf13 Jan 2026
Disclosure of Sold and Booked InventoryFile: GB 31-3-25 (9) Disclosure.pdf13 Jan 2026
Form 1File: Form-1 31-03- 2024.pdf13 Jan 2026
Form 2File: FORM-2 31-03-2024.PDF13 Jan 2026
Form 3File: Form 3.pdf13 Jan 2026
Disclosure of Sold and Booked InventoryFile: GB 31-3-24 (8) Disclosure (1).pdf13 Jan 2026
Form 1File: FORM-1 30-06-2024.pdf13 Jan 2026
Form 2File: FORM-2 30-06-2024.PDF13 Jan 2026
Form 3File: Form 3.pdf13 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30-6-24 (3).pdf13 Jan 2026
Form 1File: Form-1 31-09-2024.pdf13 Jan 2026
Form 2File: FORM-2 30-09-2024.PDF13 Jan 2026
Form 3File: Form 3.pdf13 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30-09-24.pdf13 Jan 2026
Form 1File: Fortune DP nano - 2 Phase - 2.pdf13 Jan 2026
Form 2File: Form 2 30-06-25.pdf13 Jan 2026
Form 3File: Form 3.pdf13 Jan 2026
Disclosure of Sold and Booked InventoryFile: GB 30_6_25_ (3) Disclosure.pdf13 Jan 2026
Form 1File: Form 1 30-09-25.pdf13 Jan 2026
Form 2File: Form 2 30-09-25.pdf13 Jan 2026
Form 3File: Form 3.pdf13 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30-09-25 (1).pdf13 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 Nano 2 Phase 2 31-03-24.pdf20 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 Nano 2 Phase 2 31-03-25.pdf20 Nov 2025
Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf8 Nov 2025
Form 2A (FY 2022-2023)File: N2 ph2 31_3_23_05112025093324.pdf5 Nov 2025
Form 2A (FY 2023-2024)File: N2 ph2 31_3_24_05112025093413.pdf5 Nov 2025
Form 2A (FY 2024-2025)File: N2 ph2 31_3_25_05112025093458.pdf5 Nov 2025
Form 1File: Form-1 31-03-2023.pdf29 Sep 2025
Form 2File: FORM-2 31-03-2023.pdf29 Sep 2025
Form 3File: FORM-3 31-03-2023.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: 31_3_23 N2P2 Disclouser.PDF29 Sep 2025
Form 1File: Form-1 30-06-2023.pdf29 Sep 2025
Form 2File: FORM-2 30-06-2023.pdf29 Sep 2025
Form 3File: FORM-3 30-06-2023.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: 31_6_23 N2P2 Disclouser.PDF29 Sep 2025
Form 1File: Form-1 04-10-2023.pdf29 Sep 2025
Form 2File: FORM-2 30-09-2023.pdf29 Sep 2025
Form 3File: FORM-3 30-09-2023.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: 30_9_23 N2P2 Disclouser.PDF29 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: FORM-1 Fortune DP Nano-2 Phase-2.PDF15 Jan 2025
Building plan approval or NA orderFile: Drg 1 Revised 28-11-2024 Nano 2 Phase 2_compressed.pdf8 Jan 2025
Building plan approval or NA orderFile: Drg 2 Revised 28-11-2024 Nano 2 Phase 2_compressed.pdf8 Jan 2025
Building plan approval or NA orderFile: Drg 3 Revised 28-11-2024 Nano 2 Phase 2_compressed.pdf8 Jan 2025
Building plan approval or NA orderFile: Drg 4 Revised 28-11-2024 Nano 2 Phase 2_compressed.pdf8 Jan 2025
Commencement CertificatesFile: CP Nano 2 Phase 2 A2 B1.PDF8 Jan 2025
Building Plan Approval (IOD)File: Drg 1 Revised 28-11-2024 Nano 2 Phase 2_compressed.pdf8 Jan 2025
Building Plan Approval (IOD)File: Drg 2 Revised 28-11-2024 Nano 2 Phase 2_compressed.pdf8 Jan 2025
Building Plan Approval (IOD)File: Drg 3 Revised 28-11-2024 Nano 2 Phase 2_compressed.pdf8 Jan 2025
Building Plan Approval (IOD)File: Drg 4 Revised 28-11-2024 Nano 2 Phase 2_compressed.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Fortune Dp Nano -2 Phase-2.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Fortune DP Nano-2 Phase-2.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Nano 2 Phase 2 QTR-4.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1 Qtr 3 FDPNANO2P2.PDF12 Jan 2024

How this compares with Daman

52%of this project is bookeddistrict median 32%
18%of Daman projects moved their completion datethis one has not
35%of Daman registrations have lapsed or been cancelledthis one is on the register

Computed across the 59 Daman projects on ReraGenie, from their own filings.

Keep Fortune DP Nano-2 Phase - 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kachigam59 in Daman

2 kmFortune DP Nano-2 Phase Completed 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: G B AND ASSOCIATES

G B AND ASSOCIATES has 3 registrations on MahaRERA, including Fortune DP Nano-2 Phase-1 and FORTUNE DP NANO EXTENSION. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Daman district page.

Frequently asked questions

What are my rights if Fortune DP Nano-2 Phase - 2 is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Fortune DP Nano-2 Phase - 2?

The registered promoter entity is G B AND ASSOCIATES, a partnership as per the filing. Its GSTIN 26AAJFG0484B1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Fortune DP Nano-2 Phase - 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Fortune DP Nano-2 Phase - 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Fortune DP Nano-2 Phase - 2?

The professionals named in the filing: Architect: MR MANISH DOSHI Doshi; Engineer: SHAH PRIYANK RAJESHKUMAR; Engineer: DINESHKUMAR Balubhai Patel; Chartered Accountant: JIGNESH VASANI j VASANI; Chartered Accountant: MANISH GOYAL; Chartered Accountant: P.R. Desai &co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Fortune DP Nano-2 Phase - 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Fortune DP Nano-2 Phase - 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Fortune DP Nano-2 Phase - 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.