Shree Hari Commercial Building Phase 1

By ASHOKKUMAR HARIBHAI TANDEL

RG-MH-00463 · RERA P49500000043 · Last updated on MahaRERA portal: 9 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Daman registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Podiums (if any), 0%
82 of 89Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

Shree Hari Commercial Building Phase 1 is a Commercial project by ASHOKKUMAR HARIBHAI TANDEL in Daman, Daman & Diu, registered with MahaRERA as P49500000043 on 24 Feb 2023. Possession is promised by 31 Mar 2027. 7 of the 89 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameShree Hari Commercial Building Phase 1
  • TypeCommercial
  • Location
    • Opposite OIDC Industrial Estate
    • Ringanwada
    • Daman
    • 396210
  • Pincode396210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49500000043
  • ReraGenie IDRG-MH-00463

Builder

  • NameASHOKKUMAR HARIBHAI TANDEL
  • Entity typeIndividual

Key dates

this monthRegisteredFeb 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Feb 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Current status

8%7 of 89 units booked
31.9%Work done, per cost certificate

Figures as on 9 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shree Hari Commercial Building Unit 1NA3208989

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Shree Hari Commercial Building Unit 1: 27% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes91%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed80

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots80
Open Space80

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,204 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Jul 2025

Approvals and building plan

Sanctioning authorityAdministration of Dadra & Nagar Haveli and Daman & Diu
Permissible FSI8827.0
Proposed, not sanctioned8,827 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot 135 Ground Floor VIA House
Estimated costRs 22.01 cr
Cost incurredRs 7.01 cr
Work done31.86%
BuildingWingEstimatedIncurred
Shree Hari Commercial Building Unit 1NARs 16.18 crRs 7.01 cr
-NARs 5.83 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAkansha Nayan Panchal
EngineerRajesh J Tandel
Chartered AccountantRajesh Katariya
Chartered AccountantKakaria and Associates LLP
PartnerRole in project
ASHOKKUMAR HARIBHAI TANDEL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf9 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf9 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf9 Jul 2026
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf15 Apr 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf15 Apr 2026
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf20 Jan 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf20 Jan 2026
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf20 Jan 2026
Withdrawal Update Form 1File: Form1.pdf24 Oct 2025
Withdrawal Update Form 2File: Form2.pdf24 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf24 Oct 2025
Form 5 (FY 2023-2024)File: Form 5 signed.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 signed.pdf30 Sep 2025
Form 2A (FY 2022-2023)File: Form 2A.pdf8 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A 31-03-2024.pdf8 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A 31-03-2025.pdf8 Jul 2025
Form 5 (FY 2022-2023)File: Form 5 Scanned.pdf8 Jul 2025
Form 1File: Form1.pdf7 Jul 2025
Form 2File: Form 2.pdf7 Jul 2025
Form 3File: Form 3_compressed.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf7 Jul 2025
Form 1File: Form 1.pdf7 Jul 2025
Form 2File: Form 2.pdf7 Jul 2025
Form 3File: Form 3.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf7 Jul 2025
Form 1File: Form 1.pdf7 Jul 2025
Form 2File: Form 2.pdf7 Jul 2025
Form 3File: Form 3.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf7 Jul 2025
Form 1File: ARCHITECT CERTIFICATE(FORM 1)20240131_15120936.pdf7 Jul 2025
Form 2File: ARCHITECT CERTIFICATE(FORM 2)20240131_15083032.pdf7 Jul 2025
Form 3File: Form 3.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf7 Jul 2025
Form 1File: SHC Frorm-1 Architect Final.pdf7 Jul 2025
Form 2File: SHC Frorm-2 Engineer Final.pdf7 Jul 2025
Form 3File: Form 3.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf7 Jul 2025
Form 1File: Form 1_compressed.pdf7 Jul 2025
Form 2File: Form 2 edited_compressed.pdf7 Jul 2025
Form 3File: Form 3.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf7 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: SHC Frorm-1 Architect Final.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: SHC Frorm-2 Engineer Final.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf20 Apr 2024
Other - FinanceFile: Sold-Unsold.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: ARCHITECT CERTIFICATE(FORM 1)20240131_15120936.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: ARCHITECT CERTIFICATE(FORM 2)20240131_15083032.pdf1 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf1 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Scanned.pdf30 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: fORM 3.pdf23 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf17 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf17 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf17 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form1.pdf25 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf25 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3_compressed.pdf25 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf8 Apr 2023
Copy of the legal title reportFile: Legal Title.pdf21 Feb 2023
Layout approvalFile: 1st Phase Plot Area.pdf17 Feb 2023
Copy of Layout Approval (in case of layout)File: 1st Phase Plot Area.pdf17 Feb 2023
Commencement CertificatesFile: Construction permission_compressed.pdf17 Feb 2023
Layout approvalFile: Layout plan_compressed.pdf8 Feb 2023
Building plan approvalFile: Building plan (1).pdf8 Feb 2023
PAN CardFile: Pan Card_Ashok.pdf8 Feb 2023
Details of encumbrances concerned to FinanceFile: No encumbrance Finance and legal.pdf8 Feb 2023
Details of encumbrances concerned to LegalFile: No encumbrance Finance and legal.pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: Layout plan_compressed.pdf8 Feb 2023
Building Plan Approval (IOD)File: Building plan (1).pdf8 Feb 2023
Declaration in FORM BFile: Form B.pdf8 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1 Architect for Rera 31-12-2022.pdf8 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2 Engineer For Rera 31-12-2022.pdf8 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form3_compressed.pdf8 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_200259892012_For_Asset_Based_Search_08_02_2023_18_31_36_912.pdf8 Feb 2023
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: ITR_AY 2020-21.pdf8 Feb 2023
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: ITR_AY 2021-22.pdf8 Feb 2023
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: ITR 22-23.pdf8 Feb 2023
Proforma of Allotment letterFile: Allotment Letter_compressed.pdf8 Feb 2023

How this compares with Daman

8%of this project is bookeddistrict median 32%
18%of Daman projects moved their completion datethis one has not
35%of Daman registrations have lapsed or been cancelledthis one is on the register

Computed across the 59 Daman projects on ReraGenie, from their own filings.

Keep Shree Hari Commercial Building Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ringanwada59 in Daman

Builder: ASHOKKUMAR HARIBHAI TANDEL

ASHOKKUMAR HARIBHAI TANDEL has 1 registration on MahaRERA, including Shree Hari Commercial Building Phase 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Daman district page.

Frequently asked questions

What are my rights if Shree Hari Commercial Building Phase 1 is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shree Hari Commercial Building Phase 1?

The registered promoter entity is ASHOKKUMAR HARIBHAI TANDEL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shree Hari Commercial Building Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shree Hari Commercial Building Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shree Hari Commercial Building Phase 1?

The professionals named in the filing: Architect: Akansha Nayan Panchal; Engineer: Rajesh J Tandel; Chartered Accountant: Rajesh Katariya; Chartered Accountant: Kakaria and Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shree Hari Commercial Building Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shree Hari Commercial Building Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shree Hari Commercial Building Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.