Registered No litigation declared Residential / Group Housing project

VAISHNAVI PRIDE

By VAISHNAVI DEVELOPERS

RG-MH-99322 · RERA P51700046405 · Last updated on MahaRERA portal: 5 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 60%
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

VAISHNAVI PRIDE is a Residential / Group Housing project by VAISHNAVI DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700046405 on 22 Jun 2022. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameVAISHNAVI PRIDE
  • TypeResidential / Group Housing
  • Location
    • S. No. 36
    • H. No.6
    • CHINCHPADA
    • Ambarnath
    • Thane
    • 421306
  • Pincode421306
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700046405
  • ReraGenie IDRG-MH-99322

Builder

  • NameVAISHNAVI DEVELOPERS
  • Entity typePartnership
  • PartnerNAVIN MHATRE
  • Other registrations8 more →
  • Completed1 of 9
  • No longer live3 lapsed, de-registered or revoked

Key dates

this monthRegisteredJun 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Jun 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VAISHNAVI PRIDENA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.

VAISHNAVI PRIDE: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises22%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,610 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Sep 2024
LandownerVillageDistrict
NAVIN MHATREChinchpadaThane
VAISHNAVI DEVELOPERSChinchpadaThane
GAJANAN MHATREDawraliThane

Approvals and building plan

Sanctioning authorityKalyan Dombivli Municipal Corporation
Permissible FSI14323.0
Proposed, not sanctioned4,323 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 3 to 6 and 1st Floor Office No 4 and 5 Parel Estate Near Gandhi Chowk Bazar Peth Road Kalyan West 421301

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeCon Consultant
ArchitectDE-CON CONSULTANTS
EngineerANA CONSULTING
Chartered AccountantJ K Sonee and Associates
Chartered AccountantNEHALI & CO
Chartered AccountantJ K SONEE & ASSOCIATES
PartnerRole in project
VAISHNAVI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4th quater architect certificate.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ee.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30-06-2024 form 3 ca certificate.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30-06-2024 form 3 ca certificate.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: oct to dec 23.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: jan to march 24.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: april to june 24.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 july to sep 23.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 march 2024 oct to dec.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: de con 4th quater vp.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 01 20.pdf26 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 04 22.pdf26 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 01 23.pdf26 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 04 23.pdf26 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 06 23.pdf26 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 12 19.pdf26 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3.pdf26 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 12 22.pdf22 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 03 23.pdf22 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 06 23.pdf22 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 09 23.pdf22 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 12 22.pdf22 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 vaishnavi pride 2024.pdf7 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Engineer Certificate on Quality Assurance 1920.pdf16 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Engineer Certificate on Quality Assurance 2021.pdf16 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Engineer Certificate on Quality Assurance 2122.pdf16 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 23 Q4.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate june 23.pdf19 Jan 2024
Layout approvalFile: BLUE PRINT 1 YP 22 FLOOR (2).pdf6 Nov 2023
Copy of Layout Approval (in case of layout)File: BLUE PRINT 1 YP 22 FLOOR (2).pdf6 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf6 Nov 2023
Disclosure of sold/ booked inventoryFile: INVENTORY DISCOLSURE.pdf16 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf11 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 june 2023.pdf8 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form5 22-23.pdf8 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 december 2022.pdf4 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 septemeber2022.pdf4 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 december 2022.pdf4 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 march 2023.pdf4 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 june 2023.pdf4 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A 22-23 final.pdf4 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 final.pdf4 Aug 2023
Details of encumbrances concerned to FinanceFile: Details of Encumbrances.pdf14 Jun 2023
Details of encumbrances concerned to LegalFile: Details of Encumbrances.pdf14 Jun 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf24 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vaishnavi Pride Architect Form 1.pdf15 Apr 2023
Copy of the legal title reportFile: Title Certificate Navin.pdf17 Jun 2022
Copy of the legal title reportFile: Title Certificate Partnership.pdf17 Jun 2022
Copy of the legal title reportFile: Title Certificate Proprietorship.pdf17 Jun 2022
CERSAI detailsFile: Details of encumbrances.pdf17 Jun 2022
Proforma of Allotment letterFile: VAISHNAVI DEVELOPERS - Allotment Letter.pdf17 Jun 2022
Proforma of Allotment letterFile: AGREEMENT FOR SALE - PARTNERSHIP VAISHNAVI DEVELOPER - VAISHNAVI PRIDE.pdf17 Jun 2022
Details of encumbrancesFile: Details of encumbrances.pdf15 Jun 2022
Declaration about Commencement CertificateFile: CC Declaration_compressed.pdf15 Jun 2022
Declaration in FORM BFile: FORM B_compressed.pdf15 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed.pdf15 Jun 2022
Building plan approvalFile: Vaishnavi Pride Blue Print kdmc_Final.pdf12 Jun 2022
Layout approvalFile: Vaishnavi Pride Blue Print kdmc_Final.pdf12 Jun 2022
PAN CardFile: Vaishnavi Developers PAN Card.pdf12 Jun 2022
Copy of Layout Approval (in case of layout)File: Vaishnavi Pride Blue Print kdmc_Final.pdf12 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: Vaishnavi Pride Blue Print kdmc_Final.pdf12 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Vaishnavi Pride KDMC CC.pdf12 Jun 2022

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VAISHNAVI PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHINCHPADA7,600+ in Thane

2 kmVAISHNAVI PRIDECompleted 40Lapsed / revoked 32Other 91Dot size: filed unitsN

Filed coordinates, straight-line distance. 163 registered projects within 2 km.

Builder: VAISHNAVI DEVELOPERS

Vaishnavi Developers has 9 registrations on MahaRERA, including Vaishnavi and BAJIRAO PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VAISHNAVI PRIDE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VAISHNAVI PRIDE?

The registered promoter entity is VAISHNAVI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VAISHNAVI PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VAISHNAVI PRIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VAISHNAVI PRIDE?

The professionals named in the filing: Architect: DeCon Consultant; Architect: DE-CON CONSULTANTS; Engineer: ANA CONSULTING; Chartered Accountant: J K Sonee and Associates; Chartered Accountant: NEHALI & CO; Chartered Accountant: J K SONEE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VAISHNAVI PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VAISHNAVI PRIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VAISHNAVI PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.