Home / Browse projects / Pune, Maharashtra / VAISHNAVI HOMES A WING

Registered No litigation declared Others project

VAISHNAVI HOMES A WING

By VAISHNAVI PROMOTERS AND DEVELOPERS

RG-MH-42114 · RERA P52100054677 · Last updated on MahaRERA portal: 9 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Basement (if any), 98%
40 of 78Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

VAISHNAVI HOMES A WING is a Others project by VAISHNAVI PROMOTERS AND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100054677 on 2 Feb 2024. Possession is promised by 31 Dec 2028. 38 of the 78 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameVAISHNAVI HOMES A WING
  • TypeOthers
  • Location
    • MARUNJI
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100054677
  • ReraGenie IDRG-MH-42114

Builder

  • NameVAISHNAVI PROMOTERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersSANTOSH VITTHAL KATE, SANDEEP VITTHAL KATE, NILESH VITTHAL KATE
  • Other registrations9 more →
  • Completed3 of 10
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Feb 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed90 files

Current status

49%38 of 78 units booked
88.4%Work done, per cost certificate

Figures as on 9 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VAISHNAVI HOMES A WINGNA88473178

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 98%.

VAISHNAVI HOMES A WING: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)98%
Podiums (if any)0%
Plinth98%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,581 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2025
LandownerVillageDistrict
DATTATRAYA TUKARAM SUTARMarunjiPune
LAXMIBAI DATTATRAYA SUTARMarunjiPune
POONAM BALU SUTARMarunjiPune
MANSI BHAGVATMarunjiPune
PRIYA SUTARMarunjiPune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI3715.5
Proposed, not sanctioned3,716 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPIMPLE SAUDAGAR
Estimated costRs 13.01 cr
Cost incurredRs 11.51 cr
Work done88.44%
BuildingWingEstimatedIncurred
VAISHNAVI HOMES A WINGNARs 11.77 crRs 10.40 cr
-NARs 1.24 crRs 1.10 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPOT CONSULTANTS
EngineerAARADHYA ENGINEERS
Chartered AccountantPGMJ AND ASSOCIATES
Chartered AccountantMahavir Parakh and Co
Chartered AccountantVaibhav Bhise and Associates
PartnerRole in project
VAISHNAVI PROMOTERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf9 May 2026
Withdrawal Update Form 2File: FORM 2 Aaradhya engineer certificate form 2 VPD homes Aw.pdf9 May 2026
Withdrawal Update Form 3File: FORM 3- VAISHNAVI HOMES A WING.pdf9 May 2026
Withdrawal Update Form 1File: FM1_Dec_2025.pdf30 Jan 2026
Withdrawal Update Form 2File: FORM 2-Aaradhya engineer certificate VPD homes A Wing Annexure B.pdf30 Jan 2026
Withdrawal Update Form 3File: FORM 3-CA certificate of VPD homes A Wing form 3.pdf30 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 Vaishnavi A Wing.pdf11 Dec 2025
Withdrawal Update Form 1File: form 1 Spot Consultants.pdf20 Nov 2025
Withdrawal Update Form 2File: form 2- homes a wing.pdf20 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf20 Nov 2025
Withdrawal Update Form 1File: Form 1.pdf27 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf27 Sep 2025
Withdrawal Update Form 3File: Form 3.pdf27 Sep 2025
Building plan approvalFile: 01.pdf4 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: 01.pdf4 Jul 2025
Declaration about Commencement CertificateFile: Form D.pdf4 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure 30-06-24.pdf7 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclosure 30-09-24.pdf7 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclosure 31-12-24.pdf7 Jun 2025
Disclosure of sold/ booked inventoryFile: GetUserDocumentFileContent.pdf7 Jun 2025
Declaration about Commencement CertificateFile: Form D.pdf7 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - March 24.pdf7 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 23-24.pdf7 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclosure.pdf1 May 2025
Building plan approvalFile: scan0284.pdf28 Apr 2025
Building plan approvalFile: scan0285.pdf28 Apr 2025
Building plan approvalFile: scan0286.pdf28 Apr 2025
Building plan approvalFile: scan0287.pdf28 Apr 2025
Building plan approvalFile: scan0288.pdf28 Apr 2025
Building plan approvalFile: scan0289.pdf28 Apr 2025
Building plan approvalFile: scan0290.pdf28 Apr 2025
Building plan approvalFile: scan0291.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc certificate mar-25.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Certificate - Mar-25.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Ca cert with sold mar-25.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Mar-25_compressed.pdf28 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: 20250415025322.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: scan0284.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: scan0285.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: scan0286.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: scan0287.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: scan0288.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: scan0289.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: scan0290.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: scan0291.pdf28 Apr 2025
Other - TechnicalFile: Vaishnavi Homes A wing 2A.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 24_Vaishnavi Homes.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Dec 24.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Dec 24.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Sep 24.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Sep 24.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Sep 24.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE.pdf10 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA mahavir parkh 2.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Mar 24.pdf10 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Mar 24.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf10 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_March 2024.pdf10 May 2024
Copy of the legal title reportFile: organized-rotated_11zon.pdf22 Jan 2024
Other - LegalFile: Form B Promoter_compressed.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final.pdf23 Dec 2023
Declaration in FORM BFile: Form B 211123.pdf21 Nov 2023
Other - TechnicalFile: compressed_Highlighted layout plan FINAL16112023.pdf16 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: edited_FINAL DECLARATION 1810.pdf19 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: promoter declaration.pdf8 Oct 2023
Layout approvalFile: compressed_Highlighted layout plan FINAL.pdf12 Sep 2023
Copy of Layout Approval (in case of layout)File: compressed_Highlighted layout plan FINAL.pdf12 Sep 2023
Declaration about Commencement CertificateFile: Circular 32 final.pdf12 Sep 2023
Building plan approvalFile: compressed_2-7.pdf6 Sep 2023
Building plan approvalFile: 3-7_rotated.pdf6 Sep 2023
Building plan approvalFile: compressed_4-7.pdf6 Sep 2023
Building plan approvalFile: 5-7_rotated.pdf6 Sep 2023
Building plan approvalFile: compressed_6-7.pdf6 Sep 2023
Building plan approvalFile: compressed_7-7_rotated.pdf6 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: compressed_2-7.pdf6 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 3-7_rotated.pdf6 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: compressed_4-7.pdf6 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 5-7_rotated.pdf6 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: compressed_6-7.pdf6 Sep 2023

How this compares with Pune

49%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VAISHNAVI HOMES A WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MARUNJI13,700+ in Pune

Builder: VAISHNAVI PROMOTERS AND DEVELOPERS

VAISHNAVI PROMOTERS AND DEVELOPERS has 10 registrations on MahaRERA, including SAHIL VIGHNESH RESIDENCY and SAHIL HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VAISHNAVI HOMES A WING is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VAISHNAVI HOMES A WING?

The registered promoter entity is VAISHNAVI PROMOTERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VAISHNAVI HOMES A WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VAISHNAVI HOMES A WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VAISHNAVI HOMES A WING?

The professionals named in the filing: Architect: SPOT CONSULTANTS; Engineer: AARADHYA ENGINEERS; Chartered Accountant: PGMJ AND ASSOCIATES; Chartered Accountant: Mahavir Parakh and Co; Chartered Accountant: Vaibhav Bhise and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VAISHNAVI HOMES A WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VAISHNAVI HOMES A WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VAISHNAVI HOMES A WING to a free account