Vaishali Govind
By Vaishali-Govind Developers LLP
RG-MH-52186 · RERA P51700033782 · Last updated on MahaRERA portal: 9 Jun 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Vaishali Govind is a Residential / Group Housing project by Vaishali-Govind Developers LLP in Thane, Maharashtra, registered with MahaRERA as P51700033782 on 8 Mar 2022. The registration is recorded completed; possession was promised by 30 Nov 2024.
At a glance
Project
- NameVaishali Govind
- TypeResidential / Group Housing
- Location
- Hari Krishna Pendse Lane
- Naupada Brahman Society
- Thane (M Corp.)
- Thane
- 400602
- Pincode400602
- RERA no.P51700033782
- ReraGenie IDRG-MH-52186
Builder
- NameVaishali-Govind Developers LLP
- Entity typePartnership
- PartnersVRUSHALI VINAY GAWLI, JAYA HARSHAD UPALEKAR, APURVA TAPAN JOSHI, SWAPNAL RAJENDRA SHINDE
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 Mar 2022
- Promised completion30 Nov 2024
- Revised completionNone
- Buildings1 building record
- Documents filed64 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Vaishali Govind | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
Vaishali Govind: 9% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 9 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed14
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership5
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sonali Milind Nate | Kurla | Mumbai Suburban |
| Vrushali Gavali | - | Hyderabad |
| Jaya Upalekar | Pune (M Corp.) | Pune |
| Apurva Joshi | Nashik | Nashik |
| Swapnal Shinde | Titwala | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AmbiaanceDesignPvtLtd |
| Engineer | Pentacon Structural consultants private limited |
| Chartered Accountant | Kapure & Kapure Chatered Accountant |
| Partner | Role in project |
|---|---|
| Vaishali-Govind Developers LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Feb 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Feb 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 29 May 2024
Documents filed64
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8-VAISHALI GOVIND_Form 1 - Architect Certificate MARCH 24-2-4.pdf | 9 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1_Vaishali Govind - March 22_organized_compressed (1).pdf | 9 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2_Vaishali Govind - June 22_organized_compressed.pdf | 9 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Vaishali Govind - Sept 22_organized_compressed (1).pdf | 9 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4_Vaishali Govind - December 22_organized_compressed.pdf | 9 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5_Vaishali Govind - March 23_organized_compressed.pdf | 9 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6_Vaishali Govind - June 23_organized_compressed.pdf | 9 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7_Vaishali Govind - Sept 23_organized_compressed.pdf | 9 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8_Vaishali Govind - December 23_organized_compressed.pdf | 9 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9_Vaishali Govind - March 24_organized_compressed.pdf | 9 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6_Form 2 - June 23.pdf | 9 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9_Form 2 - March 24.pdf | 9 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8_Form 2 - Dec 23.pdf | 9 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7_Form 2 - Sept 23.pdf | 9 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4_Form 2 - Dec 22.pdf | 9 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3_Form 2 - Sept 22.pdf | 9 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2 - June 22.pdf | 9 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1_Form 2 - March 22.pdf | 9 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5_Form 2 - March 23.pdf | 9 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: 4_Disclosure of Sold_Booked Inventory - Dec 22.pdf | 9 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: 9_Disclosure of Sold_Booked Inventory - March 24.pdf | 9 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: 8_Disclosure of Sold_Booked Inventory - Dec 23.pdf | 9 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: 7_Disclosure of Sold_Booked Inventory - Sept 23.pdf | 9 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold_Booked Inventory - June 23.pdf | 9 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: 5_Disclosure of Sold_Booked Inventory - March 23.pdf | 9 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: 3_Disclosure of Sold_Booked Inventory - Sept 22.pdf | 9 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: 2_Disclosure of Sold_Booked Inventory - June 22.pdf | 9 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: 1_Disclosure of Sold_Booked Inventory - March 22.pdf | 9 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - March 22.pdf | 9 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - March 23.pdf | 9 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - March 24.pdf | 9 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1-VAISHALI GOVIND_Form 1 - Architect Certificate Jun 22.pdf | 7 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2-VAISHALI GOVIND_Form 1 - Architect Certificate Sep 22.pdf | 7 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3-VAISHALI GOVIND_Form 1 - Architect Certificate Dec 22.pdf | 7 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4-VAISHALI GOVIND_Form 1 - Architect Certificate March 23.pdf | 7 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5-VAISHALI GOVIND_Form 1 - Architect Certificate June 23.pdf | 7 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vaishali Govind - Form 1 Sept 23.pdf | 7 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vaishali Govind -Form 1 - Dec 23.pdf | 7 Mar 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: FOrm 4.pdf | 22 Jan 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: FOrm 4.pdf | 6 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: VAISHALI GOVIND_OC_12042024.pdf | 29 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1-ASHIRWAD_Form 1 - Architect Certificate MARCH 24-3-5.pdf | 20 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8-VAISHALI GOVIND_Form 1 - Architect Certificate MARCH 24-2-4.pdf | 20 May 2024 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 21 Feb 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Vaishali Govind.pdf | 21 Feb 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Vaishali Govind 2.pdf | 21 Feb 2022 |
| Layout approvalFile: Plan 1.pdf | 16 Feb 2022 |
| Layout approvalFile: Plan 2.pdf | 16 Feb 2022 |
| Building plan approvalFile: Plan 1.pdf | 16 Feb 2022 |
| Building plan approvalFile: Plan 2.pdf | 16 Feb 2022 |
| PAN CardFile: Pan card.pdf | 16 Feb 2022 |
| Copy of the legal title reportFile: Title report.pdf | 16 Feb 2022 |
| Details of encumbrancesFile: NON ENCUMBRANCES CERTIFICATE.pdf | 16 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: Plan 1.pdf | 16 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: Plan 2.pdf | 16 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf | 16 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 16 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 16 Feb 2022 |
| Declaration about Commencement CertificateFile: Declaration for Commencement Certificate.pdf | 16 Feb 2022 |
| Declaration in FORM BFile: Declaretation_Form B Promoter.pdf | 16 Feb 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 16 Feb 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 16 Feb 2022 |
| Proforma of Allotment letterFile: AGREEMENT FORMAT.pdf | 16 Feb 2022 |
| Proforma of Allotment letterFile: LETTER OF ALLOTMENT.pdf | 16 Feb 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 64 filed documents as one ZIP, foldered, with a manifest
Keep Vaishali Govind on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Naupada Brahman Society7,600+ in Thane
Stellar
Trimity Realty LLP
SAMRIN HERITAGE
SAMRIN INFRA PRIVATE LIMITED
L&T Realty Vayam Tower 3
ELANTE PROPERTIES PRIVATE LIMITED, J S K E
L&T Realty Vayam Tower 4
ELANTE PROPERTIES PRIVATE LIMITED, J S K E
Codename LIT Tower A
Camrose Realtors Private Limited
Codename LIT Tower B
Camrose Realtors Private Limited
See every Thane project, with the district possession charts
Builder: Vaishali-Govind Developers LLP
Vaishali-Govind Developers LLP has 1 registration on MahaRERA, including Vaishali Govind. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Vaishali Govind is delayed beyond 30 Nov 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Vaishali Govind?
The registered promoter entity is Vaishali-Govind Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Vaishali Govind?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Vaishali Govind?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Vaishali Govind?
The professionals named in the filing: Architect: AmbiaanceDesignPvtLtd; Engineer: Pentacon Structural consultants private limited; Chartered Accountant: Kapure & Kapure Chatered Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Vaishali Govind?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback