Home / Browse projects / Mumbai Suburban, Maharashtra / VAIDYA WEST WORLD - SERENITY

Registered No litigation declared Others project

VAIDYA WEST WORLD - SERENITY

By VAIDYA SPACES PRIVATE LIMITED

RG-MH-17908 · RERA P51800055855 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Aug 2027Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 0%
44 of 44Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

VAIDYA WEST WORLD - SERENITY is a Others project by VAIDYA SPACES PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055855 on 23 Apr 2024. Possession is promised by 31 Aug 2027. 0 of the 44 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameVAIDYA WEST WORLD - SERENITY
  • TypeOthers
  • Location
    • PROF N S PHADKE MARG
    • ANDHERI EAST
    • Gundavali
    • Andheri
    • Mumbai Suburban
    • 400069
  • Pincode400069
  • RERA no.P51800055855
  • ReraGenie IDRG-MH-17908

Builder

  • NameVAIDYA SPACES PRIVATE LIMITED
  • Entity typeCompany
  • GSTIN27AAECD0259M1ZH
  • Managing DirectorJAYANT MANOHAR VAIDYA
  • Other registrations2 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2024PromisedAug 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Apr 2024
  • Promised completion31 Aug 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

0%0 of 44 units booked

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VAIDYA WEST WORLD-SERENITY-WING ANA101035944

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

VAIDYA WEST WORLD-SERENITY-WING A: 9% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed62

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots62
Closed/Covered62

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,105 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 May 2026
LandownerVillageDistrict
MARGADARSHAN CO-OPERATIVE HOUSING SOCIETY LIMITEDGundavaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4028.77
Proposed, not sanctioned1,778 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHRADHHA BLDG, JUNCTION OF GOKHALE ROAD AND RANADE ROAD, DADAR WEST, MUMBAI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS D R VAIDYA & CO
ArchitectD R VAIDYA & CO
EngineerRAJAN C TIPNIS
Chartered AccountantSHAHJI & CO
PartnerRole in project
VAIDYA SPACES PRIVATE LIMITED-

Litigation declared1

CaseCourtStatus
2645/2006HIGH COURT OF JUDICATURE AT BOMBAYIN PROCESS

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Architect Certificate_Serenity_2nd Quarter.pdf12 May 2026
Form 2File: Form 2 Engineer Certificate_Serenity_2nd Quarter.pdf12 May 2026
Form 3File: Form 3 Plot 3 Serenity 300924.pdf12 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold_Booked Inventory_Serenity_2nd Quarter.pdf12 May 2026
Form 1File: Form 1 upload.pdf12 May 2026
Form 2File: Form 2 ENGINEER CERTIFCATE SERENITY PLOT NO 3.pdf12 May 2026
Form 3File: Form 3 Plot 3 Serenity 311224 Final.pdf12 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold_Booked Inventory_Serenity_3rd Quarter.pdf12 May 2026
Form 1File: FORM 1 ARCHITECT CERTIFICATE_SERENITY_QTR_JUL-AUG-SEPT 2025.pdf12 May 2026
Form 2File: FORM 2 ENGINEER CERTIFICATE_SERENITY_QTR_JUL-AUG-SEPT 2025.pdf12 May 2026
Form 3File: Form 3 Plot 3 Serenity 300925.pdf12 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold_Booked Inventory_Serenity_QTR_JUL_AUG_SEPT 2025.pdf12 May 2026
Form 1File: Form 1 Architect Certificate Serenity COMP.pdf24 Feb 2026
Form 2File: Form 2 Engineer Certificate Serenity.pdf24 Feb 2026
Form 3File: Form 3 Plot 3 Serenity 300624.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Unsold units.pdf24 Feb 2026
Form 1File: Form 1 ARCH CERT SERENITY.pdf24 Feb 2026
Form 2File: FORM 2 ENG CERT SERENITY.pdf24 Feb 2026
Form 3File: Form 3 Plot 3 Serenity 310325.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Serenity Plot No 3.pdf24 Feb 2026
Form 1File: Form 1 ARCHITECT CERTIFICATE SERENITY PLOT NO 3.pdf24 Feb 2026
Form 2File: Form 2 ENGINEER CERTIFICATE SERENITY.pdf24 Feb 2026
Form 3File: Form 3 Plot 3 Serenity 300625.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Serenity June end 2025.pdf24 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCH CERT HARMONY.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Plot 2 310325.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGI CERT HARMONY.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGI CERT HARMONY.pdf6 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QUALITY ASSURANCE HARMONY.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Plot 3 Serenity 311224 Final.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rForm 1 ARCHITECT CERTIFICATE SERENITY.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER CERTIFCATE SERENITY.pdf30 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory_Serenity_3rd Quarter.pdf30 Jan 2025
Building plan approvalFile: Amended Approval Full FSI_141024_compressed-1_compressed-1-3-1.pdf18 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Full CC Residential_Serenity.pdf18 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended Approval Full FSI_141024_compressed-1_compressed-1-3-1.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate_Serenity2.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Plot 3 Serenity_181024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate_Serenity_151024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate_Serenity_151024.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory_Serenity_15Oct24.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: DisclosureofSoldBooked160724.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Serenity COMP.pdf1 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate_Serenity (2).pdf1 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Plot 3 Serenity 300624.pdf1 Aug 2024
Details of encumbrances concerned to FinanceFile: Serenity - Declaration Financial Encumbrances after loan_280524.pdf30 May 2024
Details of encumbrances concerned to LegalFile: Serenity - Declaration Financial Encumbrances after loan_280524.pdf30 May 2024
Proforma of Allotment letterFile: Allotment Letter with Annexure A.pdf12 Apr 2024
Other - TechnicalFile: Declaration Annexure A.pdf1 Apr 2024
Layout approvalFile: IOD Plan.pdf22 Mar 2024
Building plan approvalFile: Plot 3 IOD.pdf22 Mar 2024
Building plan approvalFile: Plot 3 Plan only -pg 14-17_11zon-4.pdf22 Mar 2024
PAN CardFile: VSPL Pan Card.pdf22 Mar 2024
Copy of the legal title reportFile: Legal Title Report(vaidya) (1).pdf22 Mar 2024
Details of encumbrances concerned to FinanceFile: Declaration Financial Encumbrances.pdf22 Mar 2024
Details of encumbrances concerned to FinanceFile: Declaration Encumbrances Concern to Legal.pdf22 Mar 2024
Details of encumbrances concerned to LegalFile: Declaration Financial Encumbrances.pdf22 Mar 2024
Details of encumbrances concerned to LegalFile: Declaration Encumbrances Concern to Legal.pdf22 Mar 2024
Copy of Layout Approval (in case of layout)File: IOD Plan.pdf22 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Plot 3 IOD.pdf22 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Plot 3 Plan only -pg 14-17_11zon-4.pdf22 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Plot 3 1st CC.pdf22 Mar 2024
Declaration about Commencement CertificateFile: Declaration of CC.pdf22 Mar 2024
Declaration in FORM BFile: Form B - Developer Serenity.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate_Serenity.pdf22 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate compressed.pdf22 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assurance Serenity.pdf22 Mar 2024
CERSAI detailsFile: CERSAI_Search_Report_200301354010_For_Asset_Based_Search_21_03_2024_15_12_49_630.pdf22 Mar 2024
CERSAI detailsFile: Undertaking for CERSAI.pdf22 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf22 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest JV.pdf22 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest SV.pdf22 Mar 2024
Proforma of Agreement for saleFile: AFS.pdf22 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Separate Bank Account.pdf22 Mar 2024
Deviation Report with respect to Allotment letterFile: Deviation wrt allotment letter.pdf22 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Deviation WRT Afs.pdf22 Mar 2024
Other - LegalFile: Declaration Annexure A.pdf22 Mar 2024
Other - TechnicalFile: Dclaration of Members DA.pdf22 Mar 2024
Other - TechnicalFile: ANNEXURE C LIST OF MEMBERS.pdf22 Mar 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ARYAVARTAOff B K Karanjia Marg Andheri East Mumbai305CompletedJun 2022Feb 2021

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VAIDYA WEST WORLD - SERENITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI EAST6,700+ in Mumbai Suburban

Builder: VAIDYA SPACES PRIVATE LIMITED

VAIDYA SPACES PRIVATE LIMITED has 3 registrations on MahaRERA, including VAIDYA WEST WORLD - HARMONY and VAIDYA WEST WORLD - SERENITY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if VAIDYA WEST WORLD - SERENITY is delayed beyond 31 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VAIDYA WEST WORLD - SERENITY?

The registered promoter entity is VAIDYA SPACES PRIVATE LIMITED, a company as per the filing. Its GSTIN 27AAECD0259M1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VAIDYA WEST WORLD - SERENITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VAIDYA WEST WORLD - SERENITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VAIDYA WEST WORLD - SERENITY?

The professionals named in the filing: Architect: MS D R VAIDYA & CO; Architect: D R VAIDYA & CO; Engineer: RAJAN C TIPNIS; Chartered Accountant: SHAHJI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VAIDYA WEST WORLD - SERENITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VAIDYA WEST WORLD - SERENITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VAIDYA WEST WORLD - SERENITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.