VAIBHAVI CITY

By PRADIP GANPAT PAWAR

RG-MH-40737 · RERA P51700012138 · Last updated on MahaRERA portal: 31 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 46 months past the filed date
  • 2 complaints at MahaRERA
  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2022Possession promised46 months past this date
18 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 70%
2Complaints at MahaRERAon this registration
Jump to the 21 documents Report an error

VAIBHAVI CITY is a Residential / Group Housing project by PRADIP GANPAT PAWAR in Thane, Maharashtra, registered with MahaRERA as P51700012138 on 1 Sep 2017. Possession was promised by 30 Dec 2022 and is now 46 months past that date. The completion date has moved by 48 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameVAIBHAVI CITY
  • TypeResidential / Group Housing
  • Location
    • ADHARWADI JAIL
    • SHREE COMPLEX ROAD
    • KOLIVALI VILLAGE
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700012138
  • ReraGenie IDRG-MH-40737

Builder

  • NamePRADIP GANPAT PAWAR
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

46 months past promisethis monthRegisteredSep 2017First promiseDec 2018Revised toDec 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Sep 2017
  • Promised completion30 Dec 2022
  • Revised completionRevised to 30 Dec 2022 (originally 31 Dec 2018)
  • Buildings3 building records
  • Documents filed21 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA90000
BUILDING NO 2NA90000
BUILDING NO 3NA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 31 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 70%.

BUILDING NO 173%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 273%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 359%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
BUILDING NO 111
BUILDING NO 211
BUILDING NO 311

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area493 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
VAISHNAVI DEVELOPERSThane (M Corp.)Thane

Approvals and building plan

Permissible FSI493.44
Proposed, not sanctioned493 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHigh Street cum Highland Corporate Center Ground floor GB 149 Near Big Bazar Majiwade Thane W 400607

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVITAN CONSULTANTS
PartnerRole in project
PRADIP GANPAT PAWAR-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700000859Dec 2018 → Dec 2021

Reason as filed by the promoterMyself Pradip Ganpat Pawar Proprietor of M/s Royal Developers, having office at Office no. D-3, Devashree Garden Commercial Bldg., R.W. Sawant Road, Majiwade, Thane 400601 registered our project Vaibhavi City at Kolivali, Kalyan on 07.08.2017 Application No. REA51700020300. At the time of registration I have mentioned completion date 31.12.2018 which we want to extend to 31.12.2019. Construction of Vaibhavi City is going on in Joint venture with farmers on development agreement. Farmers give us unnecessary harassment. They demand money. Each time we can not fulfill their demand. They create un

EXT51700005625Dec 2018 → Dec 2021

Reason as filed by the promoterDUE TO SHORTAGE OF MATERIALS/CHANGE IN RULES OF ULB/CASH FLOW WE ARE UNABLE TO COMPLETE THE PROJECT ON MENTIONED DATE.I/WE HEREBY PROPOSE TO COMPLETE THE PROJECT ON 31ST DECEMBER 2020

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000171865SURAJKUMAR MUDRIKAPRASAD SINGHPradeep Pawar06/02/2023
CC006000000395997Mukta Balu SawantVaishnavi Developers30/05/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed21

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
PAN CardFile: PAN CARD PRADIP PAWAR.pdf31 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20 (1).pdf6 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21 (1).pdf6 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2122.pdf6 Jan 2023
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 rev.pdf5 Jan 2023
Certificates of CA (Form 3)File: Kalyan Form 3.pdf30 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: VAIBHAVI CITY KALYAN CC.pdf27 Mar 2018
Layout approvalFile: layout.pdf8 Aug 2017
Building plan approvalFile: plan 1.pdf8 Aug 2017
Building plan approvalFile: plan 2.pdf8 Aug 2017
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf8 Aug 2017
Details of encumbrancesFile: No Encumb cert Vaibhavi.pdf8 Aug 2017
Copy of Layout Approval (in case of layout)File: layout.pdf8 Aug 2017
Building Plan Approval (IOD)File: plan 1.pdf8 Aug 2017
Building Plan Approval (IOD)File: plan 2.pdf8 Aug 2017
Declaration in FORM BFile: form B Vaibhavi City.pdf8 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf8 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf8 Aug 2017
Certificates of CA (Form 3)File: Form 3.pdf8 Aug 2017
Proforma of Allotment letterFile: PROFORMA ALLOTMENT LETTER.pdf8 Aug 2017
Proforma of Allotment letterFile: DRAFT AGREEMENT.pdf8 Aug 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 48 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VAIBHAVI CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KOLIVALI VILLAGE7,600+ in Thane

2 kmVAIBHAVI CITYCompleted 55Lapsed / revoked 25Other 85Dot size: filed unitsN

Filed coordinates, straight-line distance. 165 registered projects within 2 km.

Builder: PRADIP GANPAT PAWAR

PRADIP GANPAT PAWAR has 2 registrations on MahaRERA, including GN TOWER and VAIBHAVI CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that VAIBHAVI CITY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if VAIBHAVI CITY is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VAIBHAVI CITY?

The registered promoter entity is PRADIP GANPAT PAWAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VAIBHAVI CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VAIBHAVI CITY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VAIBHAVI CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VAIBHAVI CITY?

The professionals named in the filing: Architect: VITAN CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VAIBHAVI CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VAIBHAVI CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VAIBHAVI CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.