Completed No litigation declared Residential / Group Housing project

VAASTU RUKMINI

By VAASTU Builders & Developers

RG-MH-61774 · RERA P52000017347 · Last updated on MahaRERA portal: 10 Feb 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 27 documents Report an error

VAASTU RUKMINI is a Residential / Group Housing project by VAASTU Builders & Developers in Raigarh, Maharashtra, registered with MahaRERA as P52000017347 on 7 Aug 2018. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameVAASTU RUKMINI
  • TypeResidential / Group Housing
  • Location
    • SURVEY NO.122/1 VICHUMBE
    • VICHUMBE
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000017347
  • ReraGenie IDRG-MH-61774

Builder

  • NameVAASTU Builders & Developers
  • Entity typePartnership
  • PartnersSangram Vilasrao Patil, Sunil Baban Kolekar, Anand Vilasrao Patil, Vijay Babanrao Nikam, Ajit Prahlad Yelmar
  • Other registrations5 more →
  • Completed4 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2018PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Aug 2018
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed27 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VAASTU RUKMINI ANA50000
VAASTU RUKMINI BNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 10 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

VAASTU RUKMINI A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
VAASTU RUKMINI B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Closed/Covered9
Open Space8
BuildingClosed/CoveredOpen SpaceTotal
VAASTU RUKMINI A055
VAASTU RUKMINI B9312

Land and ownership7

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,040 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
LandownerVillageDistrict
Shaila ChimneVichumbeRaigarh
ARJUN PATILVichumbeRaigarh
GANESH PATILVichumbeRaigarh
PARMILA PARDESHIVichumbeRaigarh
BABI DAMODAR PATILVichumbeRaigarh
JOMA HARSHA PATILVichumbeRaigarh
SANDEEP SAWANTVichumbeRaigarh

Approvals and building plan

Permissible FSI1681.72
Proposed, not sanctioned1,678 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAPMC MARKET SECTOR 19 VASHI

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVISTAAR ARCHITECTS & PLANNERS
EngineerBS SUKHTHANKAR
PartnerRole in project
VAASTU Builders & Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Feb 2024

Documents filed27

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about Commencement CertificateFile: D.pdf10 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A 19-20.pdf10 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A 20-21.pdf10 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 21-22.pdf10 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 22-23.pdf10 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf10 Feb 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf10 Feb 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: SF.pdf10 Feb 2024
Status of ConveyanceFile: CONVEYANCE.pdf10 Feb 2024
Declaration in FORM BFile: Form B0001.PDF1 Aug 2018
Building plan approvalFile: 1st to 3rd Floor.pdf25 Jul 2018
Building plan approvalFile: 4th Floor.pdf25 Jul 2018
Building plan approvalFile: Ground Floor.pdf25 Jul 2018
Layout approvalFile: Ground Floor Layout.pdf25 Jul 2018
Copy of Layout Approval (in case of layout)File: Ground Floor Layout.pdf25 Jul 2018
Building Plan Approval (IOD)File: 1st to 3rd Floor.pdf25 Jul 2018
Building Plan Approval (IOD)File: 4th Floor.pdf25 Jul 2018
Building Plan Approval (IOD)File: Ground Floor.pdf25 Jul 2018
Proforma of Allotment letterFile: Allotment Letter for customer pdF.pdf25 Jul 2018
Proforma of Allotment letterFile: Draft Agreement.pdf25 Jul 2018
Copy of the legal title reportFile: VAASTU RUKMINI TITLE CERTIFICATE.PDF24 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: CC of VAASTU RUKMINI.PDF24 Jul 2018
Certificates of CA (Form 3)File: CA CERTIFICATE 18 FLATS.PDF24 Jul 2018
Certificates of CA (Form 3)File: CA CERTIFICATE 28 FLATS.PDF24 Jul 2018
Certificates of CA (Form 3)File: CA CERTIFICATE 46FLATS.PDF24 Jul 2018
Details of encumbrancesFile: No Emburances Certificate.PDF13 Jul 2018
PAN CardFile: Pan Card VAASTU.pdf9 Jul 2018

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
VAASTU AcumenPlot no 208 Sector 23 Ulwe Navi Mumbai28CompletedMay 2017Late, Jul 2017
Tejsa SiddharthPlot no201 Sector 3 Ulwe Navi Mumbai16CompletedOct 2016Late, Jun 2017
Tejas PalakPlot no 76 Sector 17 Ulwe Navi Mumbai28CompletedJun 2016Late, May 2017
Tejas OjasPlot no 141 Sector 15 Ulwe Navi Mumbai56CompletedJun 2016Jun 2016
Tejas OmkarPlot no F-3 Sector 8 Ulwe Navi Mumbai16CompletedDec 2015Late, Jan 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VAASTU RUKMINI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VICHUMBE5,900+ in Raigarh

Builder: VAASTU Builders & Developers

VAASTU Builders & Developers has 6 registrations on MahaRERA, including VAASTU Prathamesh and VAASTU Sai. Its filings disclose 5 earlier MahaRERA projects: declares 1 of 5 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if VAASTU RUKMINI is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VAASTU RUKMINI?

The registered promoter entity is VAASTU Builders & Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VAASTU RUKMINI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VAASTU RUKMINI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VAASTU RUKMINI?

The professionals named in the filing: Architect: VISTAAR ARCHITECTS & PLANNERS; Engineer: BS SUKHTHANKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VAASTU RUKMINI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VAASTU RUKMINI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VAASTU RUKMINI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.