Vaarivana Phase B-2
By Sanjivani Integrated Township LLP
RG-MH-19261 · RERA P52100078346 · Last updated on MahaRERA portal: 6 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 7 cases
- 1 complaint at MahaRERA
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Vaarivana Phase B-2 is a Residential / Group Housing project by Sanjivani Integrated Township LLP in Pune, Maharashtra, registered with MahaRERA as P52100078346 on 6 Dec 2024. Possession is promised by 1 Aug 2028. 23 of the 67 units on this registration are recorded sold or booked, and 23 of 737 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameVaarivana Phase B-2
- TypeResidential / Group Housing
- Location
- Ambewadi
- URSE
- Mawal
- Pune
- 410506
- Pincode410506
- RERA no.P52100078346
- ReraGenie IDRG-MH-19261
Builder
- NameSanjivani Integrated Township LLP
- Entity typePartnership
- PartnersAnil Jayram Pharande, Pharande Township Private Limited, Nitin Govind Sable, Surekha Rajeev Sable, Ramesh Jayram Pharande
- Other registrations9 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 Dec 2024
- Promised completion1 Aug 2028
- Revised completionNone
- Buildings67 building records
- Documents filed47 files
Current status
Figures as on 6 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Bungalow No B75 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B76 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B77 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B78 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B79 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B80 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B81 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B82 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No N83 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B84 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B85 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B86 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B87 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B88 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B27 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B28 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B29 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B30 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B31 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B32 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B33 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B34 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B35 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B36 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B37 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B38 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B39 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B40 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B41 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B42 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B43 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B44 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B45 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B46 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B47 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B48 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B49 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B50 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B51 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B52 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B53 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B54 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B55 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B56 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B57 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B58 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B59 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B60 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B61 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B62 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B63 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B64 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B65 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B66 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B67 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B68 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B69 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B70 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B71 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B72 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B73 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B74 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B89 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B90 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B91 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B92 | NA | 2 | 2 | 1 | 0 | 1 |
| Bungalow No B93 | NA | 2 | 2 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 6 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 67 buildings; the table lists the first 20.
23 of 737 construction stages are filed complete across 67 buildings. The stage furthest along is Excavation, at 0%.
Bungalow No B750%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B760%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B770%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B780%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B790%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B800%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B810%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B820%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No N830%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B840%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B850%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B860%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B870%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B889%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B2727%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B280%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B290%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B300%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B310%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bungalow No B320%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 15% |
| Water Supply | Yes | 2% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 10% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners11
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Landmark Design Group |
| Architect | Vivaan Associates |
| Architect | Shivam Shubhash Ganore |
| Engineer | Sanket Potdar |
| Engineer | Bharatraj Kinagi |
| Engineer | l l l |
| Engineer | Umesh Joshi Designated Partner JW Consultants LLP |
| Chartered Accountant | A N J K & CO LLP (CA Nipun Bhandari) |
| Chartered Accountant | CA Nikesh Sharma |
| Chartered Accountant | R. Devendra Kumar & Associates |
| Chartered Accountant | A N J K & CO LLP |
| Partner | Role in project |
|---|---|
| Sanjivani Integrated Township LLP | - |
Litigation declared7
| Case | Court | Status |
|---|---|---|
| 515/2022 Old Number 626/2017/2022 | Civil Judge Senior Division Pune | Evidence |
| 577/2022 Old Number 1533/2017/2022 | Civil Judge Senior Division at Vadgaon Pune | Awaiting summons |
| RTS Appeal /2A/896/2021/2021 | Additional Collector Pune | Filing Say |
| 415/2022/2022 | Civil Judge Junior Division at Vadgaon Pune | Awaiting summons |
| RCS 228/2023/2023 | Civil Judge Junior Division at Vadgaon Pune | Awaiting summons |
| RTS Appeal 324/2023/2023 | Sub Divisional Officer Maval | Filing Say |
| RTS Appeal/SR/105/2023/2023 | Sub Divisional Officer Maval | Hearing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12504629 | Ritu Raj | Sanjivani Integrated Township LLP | 26/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Nov 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 Aug 2028
Documents filed47
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: VAARIVANA PHASE B2_CA CERTIFICATE_FORM-5_2024-25.pdf | 6 Feb 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VAARIVANA PHASE B2_ARCHITECT CERTIFICATE_DECEMBER-24_ FORM-1.pdf | 27 Jan 2025 |
| Layout approvalFile: Layout Approval.pdf | 4 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Layout Approval.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Form-1.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Form-2.pdf | 4 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Declaration of Built-up Area.pdf | 4 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Declaration of Built-up Area Mis-match.pdf | 4 Dec 2024 |
| Copy of the legal title reportFile: DECLARATION STATING OTHER GAT NOS.pdf | 25 Nov 2024 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf | 13 Nov 2024 |
| Proforma of Agreement for saleFile: DRAFT AGREEMENT.pdf | 13 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: APPENDIX-F.pdf | 5 Nov 2024 |
| Proforma of Allotment letterFile: PROFORMA OF ALLOTMENT LETTER.pdf | 7 Oct 2024 |
| Deviation Report with respect to Allotment letterFile: DEVAITION REPORT ALLOTMENT LETTER.pdf | 7 Oct 2024 |
| Deviation Report with respect to model copy of AgreementFile: DEVAITION REPORT AGREEMENT.pdf | 7 Oct 2024 |
| Other - LegalFile: LEGAL TITLE REPORT DECLARATION.pdf | 10 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 27) SUREKHA SABLE DIRECTOR INTEREST-R1.pdf | 10 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 26) NITIN SABLE DIRECTOR INTEREST-R1.pdf | 10 Aug 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC REVALIDATE DECLARATION.pdf | 27 Jul 2024 |
| Other - LegalFile: DECLARATION CUM UNDERTAKING_ANNEXURE-A.pdf | 27 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 23 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: R1_FINANCIAL ENCUMBRANCE.pdf | 22 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE CONFIRMATION.pdf | 22 Jul 2024 |
| Other - LegalFile: R1_PLOT DECLARATION.pdf | 22 Jul 2024 |
| Details of encumbrances concerned to LegalFile: R1_FINANCIAL ENCUMBRANCE.pdf | 22 Jul 2024 |
| CERSAI detailsFile: 23) CERSAI CERTIFICATE.pdf | 19 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 38) NO ENCUMBRANCE ON BANK ACCOUNT.pdf | 19 Jun 2024 |
| Other - TechnicalFile: PROJECT DECLARATION CUM UNDERTAKING.pdf | 15 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: 4) LEGAL ENCUMBARANCE.pdf | 12 Jun 2024 |
| Declaration in FORM BFile: 14) FORM-B SIT.pdf | 12 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 6 DECLARATION CC.pdf | 12 Jun 2024 |
| Details of encumbrances concerned to LegalFile: 4) LEGAL ENCUMBARANCE.pdf | 12 Jun 2024 |
| Other - TechnicalFile: 8 DECLARATION PLOT.pdf | 12 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 23) ANIL SIR DISCLOSURE OF INTEREST SIT.pdf | 11 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 24) ANIL SIR DISCLOSURE OF INTEREST PTPL.pdf | 11 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 25) RAMESH SIR DISCLOSURE OF INTEREST_compressed.pdf | 11 Jun 2024 |
| Building plan approvalFile: 10) B-5.pdf | 10 Jun 2024 |
| Building plan approvalFile: 9) B-4.pdf | 10 Jun 2024 |
| Building plan approvalFile: 8) B-3.pdf | 10 Jun 2024 |
| Building plan approvalFile: 7) B-2.pdf | 10 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 8) B-3.pdf | 10 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 7) B-2.pdf | 10 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 9) B-4.pdf | 10 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10) B-5.pdf | 10 Jun 2024 |
| Declaration about Commencement CertificateFile: 8) COMMENCEMENT CERTIFICATE DECLARATION_compressed.pdf | 10 Jun 2024 |
| PAN CardFile: 1) PANCARD.pdf | 7 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 11) COMMENCEMENT CERTIFICATE.pdf | 7 Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations, which the RERA portal never shows together
- All 47 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Vaarivana Phase B-2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near URSE13,700+ in Pune
Everland
EVITA KRISALA TOWNSHIP LLP
EVERLYN
EVITA KRISALA TOWNSHIP LLP
ABHIMAAN HOMES PHASE 3
RISING PROPCON LLP
SURABHI CITY PHASE 1
Surabhi Group
ROHAN ANAND PHASE I
ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITE
Urban Life Phase 1
Kakade Vtp Associates
Builder: Sanjivani Integrated Township LLP
Sanjivani Integrated Township LLP has 10 registrations on MahaRERA, including Vaarivana Phase A - 1 and Vaarivana Phase C. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Vaarivana Phase B-2 is delayed beyond 1 Aug 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Vaarivana Phase B-2?
The registered promoter entity is Sanjivani Integrated Township LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Vaarivana Phase B-2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Vaarivana Phase B-2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Vaarivana Phase B-2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Vaarivana Phase B-2?
The professionals named in the filing: Architect: Landmark Design Group; Architect: Vivaan Associates; Architect: Shivam Shubhash Ganore; Engineer: Sanket Potdar; Engineer: Bharatraj Kinagi; Engineer: l l l. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Vaarivana Phase B-2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback