Home / Browse projects / Pune, Maharashtra / Vaarivana Phase A - 2
Vaarivana Phase A - 2
By Sanjivani Integrated Township LLP
RG-MH-15999 · RERA P52100025843 · Last updated on MahaRERA portal: 22 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 6 complaints at MahaRERA
- Completion date moved by 22 months
- 1 extension taken
- Rs 275.00 crore secured on the land, in favour of Catalyst Trusteeship Limited
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Vaarivana Phase A - 2 is a Residential / Group Housing project by Sanjivani Integrated Township LLP in Pune, Maharashtra, registered with MahaRERA as P52100025843 on 20 Jul 2020. Possession is promised by 30 Dec 2027. The completion date has moved by 22 months from the original filing. 166 of the 170 units on this registration are recorded sold or booked, and 879 of 1870 construction stages are filed complete. 6 complaints are on record with the regulator.
At a glance
Project
- NameVaarivana Phase A - 2
- TypeResidential / Group Housing
- Location
- Aadhe & Urse
- Urse
- Mawal
- Pune
- 410506
- Pincode410506
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100025843
- ReraGenie IDRG-MH-15999
Builder
- NameSanjivani Integrated Township LLP
- Entity typePartnership
- PartnersAnil Jayram Pharande, Pharande Township Private Limited, Nitin Govind Sable, Surekha Rajeev Sable, Ramesh Jayram Pharande
- Other registrations9 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Jul 2020
- Promised completion30 Dec 2027
- Revised completionRevised to 30 Dec 2027 (originally 1 Feb 2026)
- Buildings170 building records
- Documents filed65 files
Current status
Figures as on 22 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUNGALOW NO A5 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A6 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A7 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A8 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A9 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A10 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A11 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGAOW NO A12 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A13 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A14 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A15 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A16 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A17 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A18 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A19 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A20 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A21 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A22 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A23 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A24 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A25 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A26 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A27 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A28 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A29 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A30 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A31 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A32 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A33 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A34 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A35 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A36 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A37 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A38 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A39 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A40 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A41 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A42 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A43 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A44 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A45 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A46 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A47 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A48 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A49 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A50 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A51 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A52 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A53 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A54 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A55 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A56 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A57 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A58 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A59 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A60 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A61 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A62 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A63 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A64 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A65 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A66 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A67 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A68 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A69 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A70 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A71 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A72 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A73 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A74 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A75 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A76 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A77 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A78 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A262 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A263 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A264 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A265 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A266 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A267 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A268 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A269 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A270 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A271 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A272 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A273 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A274 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A275 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A276 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A277 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A278 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A279 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A280 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A281 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A282 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A283 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A284 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A285 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A286 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A287 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A288 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A289 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A290 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A291 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A292 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A293 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A294 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A295 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A296 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A297 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A298 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A299 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A300 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A301 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A302 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A303 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A304 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A305 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A306 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A307 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A308 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A309 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A310 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A311 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A312 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A313 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A314 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A315 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A316 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A317 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A318 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A319 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A320 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A321 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A322 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A323 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A324 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A325 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A326 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A327 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A328 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A329 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A330 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A331 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A332 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A333 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A334 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A335 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A336 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A337 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A338 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A339 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A340 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A341 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A342 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A343 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A344 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A345 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A346 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A347 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A348 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A349 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A350 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A351 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A352 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A353 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A354 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A355 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A356 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO A357 | NA | 2 | 2 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 170 buildings; the table lists the first 20.
879 of 1870 construction stages are filed complete across 170 buildings. The stage furthest along is Staircases, at 93%.
BUNGALOW NO A565%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 87% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
BUNGALOW NO A651%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 33% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO A766%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 68% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 87% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
BUNGALOW NO A865%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 57% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 87% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
BUNGALOW NO A959%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 54% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO A1060%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO A1164%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 57% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 72% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
BUNGAOW NO A1249%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 29% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO A1348%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 13% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO A1448%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 13% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO A1547%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 33% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO A1642%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 19% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO A1753%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 38% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 37% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO A1852%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 37% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO A1953%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 38% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 37% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO A2053%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 38% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 37% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO A2153%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 38% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO A2282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO A2382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO A2482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 82% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 97% |
| Landscaping & Tree Planting | Yes | 60% |
| Street Lighting | Yes | 55% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | Yes | 70% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 68% |
| Aggregate area of recreational Open Space | Yes | 65% |
| Open Parking | No | Not applicable |
Parking filed347
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| BUNGALOW NO A5 | 2 | 2 |
| BUNGALOW NO A6 | 2 | 2 |
| BUNGALOW NO A7 | 2 | 2 |
| BUNGALOW NO A8 | 2 | 2 |
| BUNGALOW NO A9 | 2 | 2 |
| BUNGALOW NO A10 | 2 | 2 |
| BUNGALOW NO A11 | 2 | 2 |
| BUNGAOW NO A12 | 2 | 2 |
| BUNGALOW NO A13 | 2 | 2 |
| BUNGALOW NO A14 | 2 | 2 |
| BUNGALOW NO A15 | 2 | 2 |
| BUNGALOW NO A16 | 2 | 2 |
| BUNGALOW NO A17 | 2 | 2 |
| BUNGALOW NO A18 | 2 | 2 |
| BUNGALOW NO A19 | 2 | 2 |
| BUNGALOW NO A20 | 2 | 2 |
| BUNGALOW NO A21 | 2 | 2 |
| BUNGALOW NO A22 | 2 | 2 |
| BUNGALOW NO A23 | 2 | 2 |
| BUNGALOW NO A24 | 2 | 2 |
| BUNGALOW NO A25 | 2 | 2 |
| BUNGALOW NO A26 | 2 | 2 |
| BUNGALOW NO A27 | 2 | 2 |
| BUNGALOW NO A28 | 2 | 2 |
| BUNGALOW NO A29 | 2 | 2 |
| BUNGALOW NO A30 | 2 | 2 |
| BUNGALOW NO A31 | 2 | 2 |
| BUNGALOW NO A32 | 2 | 2 |
| BUNGALOW NO A33 | 2 | 2 |
| BUNGALOW NO A34 | 2 | 2 |
| BUNGALOW NO A35 | 2 | 2 |
| BUNGALOW NO A36 | 3 | 3 |
| BUNGALOW NO A37 | 2 | 2 |
| BUNGALOW NO A38 | 2 | 2 |
| BUNGALOW NO A39 | 3 | 3 |
| BUNGALOW NO A40 | 2 | 2 |
| BUNGALOW NO A41 | 2 | 2 |
| BUNGALOW NO A42 | 2 | 2 |
| BUNGALOW NO A43 | 2 | 2 |
| BUNGALOW NO A44 | 2 | 2 |
| BUNGALOW NO A45 | 2 | 2 |
| BUNGALOW NO A46 | 2 | 2 |
| BUNGALOW NO A47 | 2 | 2 |
| BUNGALOW NO A48 | 2 | 2 |
| BUNGALOW NO A49 | 2 | 2 |
| BUNGALOW NO A50 | 2 | 2 |
| BUNGALOW NO A51 | 2 | 2 |
| BUNGALOW NO A52 | 2 | 2 |
| BUNGALOW NO A53 | 2 | 2 |
| BUNGALOW NO A54 | 2 | 2 |
| BUNGALOW NO A55 | 2 | 2 |
| BUNGALOW NO A56 | 2 | 2 |
| BUNGALOW NO A57 | 2 | 2 |
| BUNGALOW NO A58 | 2 | 2 |
| BUNGALOW NO A59 | 2 | 2 |
| BUNGALOW NO A60 | 2 | 2 |
| BUNGALOW NO A61 | 2 | 2 |
| BUNGALOW NO A62 | 2 | 2 |
| BUNGALOW NO A63 | 2 | 2 |
| BUNGALOW NO A64 | 2 | 2 |
| BUNGALOW NO A65 | 2 | 2 |
| BUNGALOW NO A66 | 2 | 2 |
| BUNGALOW NO A67 | 2 | 2 |
| BUNGALOW NO A68 | 2 | 2 |
| BUNGALOW NO A69 | 2 | 2 |
| BUNGALOW NO A70 | 2 | 2 |
| BUNGALOW NO A71 | 2 | 2 |
| BUNGALOW NO A72 | 2 | 2 |
| BUNGALOW NO A73 | 2 | 2 |
| BUNGALOW NO A74 | 2 | 2 |
| BUNGALOW NO A75 | 2 | 2 |
| BUNGALOW NO A76 | 2 | 2 |
| BUNGALOW NO A77 | 2 | 2 |
| BUNGALOW NO A78 | 2 | 2 |
| BUNGALOW NO A262 | 2 | 2 |
| BUNGALOW NO A263 | 3 | 3 |
| BUNGALOW NO A264 | 2 | 2 |
| BUNGALOW NO A265 | 2 | 2 |
| BUNGALOW NO A266 | 2 | 2 |
| BUNGALOW NO A267 | 2 | 2 |
| BUNGALOW NO A268 | 2 | 2 |
| BUNGALOW NO A269 | 2 | 2 |
| BUNGALOW NO A270 | 2 | 2 |
| BUNGALOW NO A271 | 2 | 2 |
| BUNGALOW NO A272 | 2 | 2 |
| BUNGALOW NO A273 | 2 | 2 |
| BUNGALOW NO A274 | 2 | 2 |
| BUNGALOW NO A275 | 2 | 2 |
| BUNGALOW NO A276 | 2 | 2 |
| BUNGALOW NO A277 | 2 | 2 |
| BUNGALOW NO A278 | 2 | 2 |
| BUNGALOW NO A279 | 2 | 2 |
| BUNGALOW NO A280 | 2 | 2 |
| BUNGALOW NO A281 | 2 | 2 |
| BUNGALOW NO A282 | 3 | 3 |
| BUNGALOW NO A283 | 2 | 2 |
| BUNGALOW NO A284 | 2 | 2 |
| BUNGALOW NO A285 | 3 | 3 |
| BUNGALOW NO A286 | 2 | 2 |
| BUNGALOW NO A287 | 2 | 2 |
| BUNGALOW NO A288 | 2 | 2 |
| BUNGALOW NO A289 | 2 | 2 |
| BUNGALOW NO A290 | 2 | 2 |
| BUNGALOW NO A291 | 2 | 2 |
| BUNGALOW NO A292 | 2 | 2 |
| BUNGALOW NO A293 | 2 | 2 |
| BUNGALOW NO A294 | 2 | 2 |
| BUNGALOW NO A295 | 2 | 2 |
| BUNGALOW NO A296 | 2 | 2 |
| BUNGALOW NO A297 | 2 | 2 |
| BUNGALOW NO A298 | 2 | 2 |
| BUNGALOW NO A299 | 2 | 2 |
| BUNGALOW NO A300 | 2 | 2 |
| BUNGALOW NO A301 | 2 | 2 |
| BUNGALOW NO A302 | 2 | 2 |
| BUNGALOW NO A303 | 2 | 2 |
| BUNGALOW NO A304 | 2 | 2 |
| BUNGALOW NO A305 | 2 | 2 |
| BUNGALOW NO A306 | 2 | 2 |
| BUNGALOW NO A307 | 2 | 2 |
| BUNGALOW NO A308 | 2 | 2 |
| BUNGALOW NO A309 | 2 | 2 |
| BUNGALOW NO A310 | 2 | 2 |
| BUNGALOW NO A311 | 2 | 2 |
| BUNGALOW NO A312 | 2 | 2 |
| BUNGALOW NO A313 | 2 | 2 |
| BUNGALOW NO A314 | 2 | 2 |
| BUNGALOW NO A315 | 2 | 2 |
| BUNGALOW NO A316 | 2 | 2 |
| BUNGALOW NO A317 | 2 | 2 |
| BUNGALOW NO A318 | 2 | 2 |
| BUNGALOW NO A319 | 2 | 2 |
| BUNGALOW NO A320 | 2 | 2 |
| BUNGALOW NO A321 | 2 | 2 |
| BUNGALOW NO A322 | 2 | 2 |
| BUNGALOW NO A323 | 2 | 2 |
| BUNGALOW NO A324 | 2 | 2 |
| BUNGALOW NO A325 | 2 | 2 |
| BUNGALOW NO A326 | 3 | 3 |
| BUNGALOW NO A327 | 2 | 2 |
| BUNGALOW NO A328 | 2 | 2 |
| BUNGALOW NO A329 | 2 | 2 |
| BUNGALOW NO A330 | 2 | 2 |
| BUNGALOW NO A331 | 2 | 2 |
| BUNGALOW NO A332 | 2 | 2 |
| BUNGALOW NO A333 | 2 | 2 |
| BUNGALOW NO A334 | 2 | 2 |
| BUNGALOW NO A335 | 2 | 2 |
| BUNGALOW NO A336 | 2 | 2 |
| BUNGALOW NO A337 | 2 | 2 |
| BUNGALOW NO A338 | 2 | 2 |
| BUNGALOW NO A339 | 2 | 2 |
| BUNGALOW NO A340 | 2 | 2 |
| BUNGALOW NO A341 | 3 | 3 |
| BUNGALOW NO A342 | 2 | 2 |
| BUNGALOW NO A343 | 2 | 2 |
| BUNGALOW NO A344 | 2 | 2 |
| BUNGALOW NO A345 | 2 | 2 |
| BUNGALOW NO A346 | 2 | 2 |
| BUNGALOW NO A347 | 2 | 2 |
| BUNGALOW NO A348 | 2 | 2 |
| BUNGALOW NO A349 | 2 | 2 |
| BUNGALOW NO A350 | 2 | 2 |
| BUNGALOW NO A351 | 2 | 2 |
| BUNGALOW NO A352 | 2 | 2 |
| BUNGALOW NO A353 | 2 | 2 |
| BUNGALOW NO A354 | 2 | 2 |
| BUNGALOW NO A355 | 2 | 2 |
| BUNGALOW NO A356 | 2 | 2 |
| BUNGALOW NO A357 | 2 | 2 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 10.17 cr | Rs 7.05 cr |
| BUNGALOW NO A36 | NA | Rs 82.03 lakh | Rs 1.18 cr |
| BUNGALOW NO A39 | NA | Rs 82.03 lakh | Rs 1.19 cr |
| BUNGALOW NO A263 | NA | Rs 82.03 lakh | Rs 62.70 lakh |
| BUNGALOW NO A279 | NA | Rs 82.03 lakh | Rs 52.11 lakh |
| BUNGALOW NO A280 | NA | Rs 82.03 lakh | Rs 52.11 lakh |
| BUNGALOW NO A282 | NA | Rs 82.03 lakh | Rs 51.65 lakh |
| BUNGALOW NO A285 | NA | Rs 82.03 lakh | Rs 62.85 lakh |
| BUNGALOW NO A326 | NA | Rs 82.03 lakh | Rs 51.65 lakh |
| BUNGALOW NO A341 | NA | Rs 82.03 lakh | Rs 1.19 cr |
| BUNGALOW NO A343 | NA | Rs 82.03 lakh | Rs 50.89 lakh |
| BUNGALOW NO A344 | NA | Rs 82.03 lakh | Rs 50.89 lakh |
Certifying professionals and partners11
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sachin Funde |
| Architect | Landmark Design Group |
| Architect | Shivam Shubhash Ganore |
| Engineer | Navin Verma |
| Engineer | l l l |
| Engineer | Umesh Joshi Designated Partner JW Consultants LLP |
| Chartered Accountant | FAA & Associates LLP |
| Chartered Accountant | CA Nikesh Sharma |
| Chartered Accountant | R. Devendra Kumar & Associates |
| Chartered Accountant | A N J K & CO LLP |
| Chartered Accountant | CA Jayant Daharwal |
| Partner | Role in project |
|---|---|
| Sanjivani Integrated Township LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTo, The MahaRERA Authority, Sub : Reason for the Extension to the Project Vaarivana Phase A2 bearing Registration No. P52100025843. Due to certain technical issues, the project could not be commenced within the originally scheduled timeline. At present, all works are being carried out strictly in accordance with the applicable rules and regulations, and the internal construction activities are in full progress. Upon completion of the construction, additional time will be required to obtain the Occupation Certificate from the concerned authority. We sincerely request your kind consideration in
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 515/2022 | Civil Judge Senior Division Pune | Argument on Exhibit Unready |
| 1533/2017 | Civil Judge Senior Division Pune | Unready Board |
| RTS/2A/896/2021/2021 | Collector Pune | Awaiting Notice |
Complaints filed with MahaRERA6
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12503991 | MILIND SHASHIKANT NILAKHE | Sanjivani Integrated Township LLP | 13/11/2025 |
| CC12504546 | Rahul Dattatraya Sathe | Sanjivani Integrated Township LLP | 20/12/2025 |
| CC12600034 | Akash Ramkrishna Dalal | Sanjivani Integrated Township LLP | 03/01/2026 |
| CC12504545 | Vaibhav Dattatraya Sathe | Sanjivani Integrated Township LLP | 20/12/2025 |
| CC12602136 | Pankaj Shivmurti Pandey | Sanjivani Integrated Township LLP | 11/04/2026 |
| CC12605119 | Mrs Bhagwati | Sanjivani Integrated Township LLP | 11/08/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Feb 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Feb 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Aug 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2027
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_Vaarivana Phase A2.pdf | 22 Apr 2026 |
| Withdrawal Update Form 2File: Form 2_Vaarivana Phase A2.pdf | 22 Apr 2026 |
| Withdrawal Update Form 3File: VAARIVANA PHASE A2_CA CERTIFICATE.pdf | 22 Apr 2026 |
| Form 5 (FY 2025-2026)File: CA Form 5_FY 2025-26_Vaarivana Phase A 2 Signed.pdf | 9 Apr 2026 |
| Withdrawal Update Form 1File: VAARIVANA PHASE A2 ARCHITECT CERTIFICATE JUNE-24 FORM-1.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: VAARIVANA PHASE A2 ARCHITECT CERTIFICATE JUNE-24 FORM-1.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: VAARIVANA PHASE A2 ARCHITECT CERTIFICATE JUNE-24 FORM-1.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: VAARIVANA PHASE A2 ARCHITECT CERTIFICATE JUNE-24 FORM-1.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: VAARIVANA PHASE A2 ARCHITECT CERTIFICATE JUNE-24 FORM-1.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2 | 24 Feb 2026 |
| Withdrawal Update Form 2 | 24 Feb 2026 |
| Withdrawal Update Form 2 | 24 Feb 2026 |
| Withdrawal Update Form 2 | 24 Feb 2026 |
| Withdrawal Update Form 2 | 24 Feb 2026 |
| Withdrawal Update Form 3File: VAARIVANA PHASE A2_CA CERTIFICATE.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: VAARIVANA PHASE A2_CA CERTIFICATE.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: VAARIVANA PHASE A2_CA CERTIFICATE.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: VAARIVANA PHASE A2_CA CERTIFICATE.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: VAARIVANA PHASE A2_CA CERTIFICATE.pdf | 24 Feb 2026 |
| Form 5 (FY 2024-2025)File: VAARIVANA PHASE A2_CA CERTIFICATE_FORM-5_2024-25.pdf | 6 Feb 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VAARIVANA PHASE A2_ARCHITECT CERTIFICATE_DECEMBER-24_ FORM-1.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VAARIVANA PHASE A2_ARCHITECT CERTIFICATE_SEP-24_ FORM-1.pdf | 9 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: VAARIVANA PHASE A2_CA CERTIFICATE_FORM-5_2023-24.pdf | 15 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VAARIVANA PHASE A2 ARCHITECT CERTIFICATE JUNE-24 FORM-1.pdf | 30 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2_VAARIVANA PHASE A2_ARCHITECT CERTIFICATE_MAR-24_compressed.pdf | 21 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 20_VAARIVANA PHASE A2_QUALITY CERTIFICATE_FORM-2A_2023-24_compressed.pdf | 21 May 2024 |
| Disclosure of sold/ booked inventoryFile: VAARIVANA PHASE A2_SOLD UNSOLD INVENTORY CERTIFICATE_MAR-24_compressed.pdf | 7 May 2024 |
| Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE_VAARIVANA PHASE A2.pdf | 9 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 20_VAARIVANA PHASE A2_P52100025843_2022-23_compressed.pdf | 29 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2_ VAARIVANA PHASE A2_P52100025843_2020-21.pdf | 16 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: VAARIVANA PHASE A2.pdf | 15 Oct 2022 |
| Building plan approvalFile: A-8.pdf | 3 Aug 2020 |
| Building plan approvalFile: A-9.pdf | 3 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: A-8.pdf | 3 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: A-9.pdf | 3 Aug 2020 |
| Declaration in FORM BFile: FORM B.pdf | 10 Jul 2020 |
| Proforma of Allotment letterFile: AGREEMENT.pdf | 10 Jul 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 19 Mar 2020 |
| Layout approvalFile: LAYOUT.pdf | 14 Feb 2020 |
| Layout approvalFile: A-1.pdf | 14 Feb 2020 |
| Building plan approvalFile: A-2.pdf | 14 Feb 2020 |
| Building plan approvalFile: A-3.pdf | 14 Feb 2020 |
| Building plan approvalFile: A-4.pdf | 14 Feb 2020 |
| Building plan approvalFile: A-5.pdf | 14 Feb 2020 |
| Building plan approvalFile: A-6.pdf | 14 Feb 2020 |
| Building plan approvalFile: A-7.pdf | 14 Feb 2020 |
| PAN CardFile: PAN CARD - SITLLP.pdf | 14 Feb 2020 |
| Copy of the legal title reportFile: TITLE SEARCH-1.pdf | 14 Feb 2020 |
| Copy of the legal title reportFile: TITLE SEARCH-2.pdf | 14 Feb 2020 |
| Copy of the legal title reportFile: TITLE SEARCH-3.pdf | 14 Feb 2020 |
| Copy of the legal title reportFile: TITLE SEARCH-4.pdf | 14 Feb 2020 |
| Copy of the legal title reportFile: TITLE SEARCH-5.pdf | 14 Feb 2020 |
| Copy of the legal title reportFile: TITLE SEARCH-6.pdf | 14 Feb 2020 |
| Copy of the legal title reportFile: TITLE SEARCH-7.pdf | 14 Feb 2020 |
| Copy of the legal title reportFile: TITLE SEARCH-8.pdf | 14 Feb 2020 |
| Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf | 14 Feb 2020 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 14 Feb 2020 |
| Copy of Layout Approval (in case of layout)File: A-1.pdf | 14 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: A-2.pdf | 14 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: A-3.pdf | 14 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: A-4.pdf | 14 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: A-5.pdf | 14 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: A-6.pdf | 14 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: A-7.pdf | 14 Feb 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 14 Feb 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 65 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Vaarivana Phase A - 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Urse13,700+ in Pune
Filed coordinates, straight-line distance. 9 registered projects within 2 km.
Everland
EVITA KRISALA TOWNSHIP LLP
EVERLYN
EVITA KRISALA TOWNSHIP LLP
ABHIMAAN HOMES PHASE 3
RISING PROPCON LLP
SURABHI CITY PHASE 1
Surabhi Group
ROHAN ANAND PHASE I
ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITE
Urban Life Phase 1
Kakade Vtp Associates
Builder: Sanjivani Integrated Township LLP
Sanjivani Integrated Township LLP has 10 registrations on MahaRERA, including Vaarivana Phase A - 1 and Vaarivana Phase C. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Vaarivana Phase A - 2 is delayed beyond 30 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Vaarivana Phase A - 2?
The registered promoter entity is Sanjivani Integrated Township LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Vaarivana Phase A - 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Vaarivana Phase A - 2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Vaarivana Phase A - 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Vaarivana Phase A - 2?
The professionals named in the filing: Architect: Sachin Funde; Architect: Landmark Design Group; Architect: Shivam Shubhash Ganore; Engineer: Navin Verma; Engineer: l l l; Engineer: Umesh Joshi Designated Partner JW Consultants LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Vaarivana Phase A - 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback