Registered Litigation declared Residential / Group Housing project

Vaarivana Phase A - 1

By Sanjivani Integrated Township LLP

RG-MH-80381 · RERA P52100018391 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases
  • 4 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken
  • Rs 275.00 crore secured on the land, in favour of Catalyst Trusteeship Limited

Clear

  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
1934 of 3124Construction stages doneacross 284 buildings; furthest along: Internal walls, 96%
8 of 284Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

Vaarivana Phase A - 1 is a Residential / Group Housing project by Sanjivani Integrated Township LLP in Pune, Maharashtra, registered with MahaRERA as P52100018391 on 29 Oct 2018. Possession is promised by 30 Dec 2027. The completion date has moved by 24 months from the original filing. 276 of the 284 units on this registration are recorded sold or booked, and 1934 of 3124 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • NameVaarivana Phase A - 1
  • TypeResidential / Group Housing
  • Location
    • Aadhe and Urse
    • Urse
    • Mawal
    • Pune
    • 410506
  • Pincode410506
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100018391
  • ReraGenie IDRG-MH-80381

Builder

  • NameSanjivani Integrated Township LLP
  • Entity typePartnership
  • PartnersAnil Jayram Pharande, Pharande Township Private Limited, Nitin Govind Sable, Surekha Rajeev Sable, Ramesh Jayram Pharande
  • Other registrations9 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredOct 2018First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Oct 2018
  • Promised completion30 Dec 2027
  • Revised completionRevised to 30 Dec 2027 (originally 30 Dec 2025)
  • Buildings284 building records
  • Documents filed85 files

Current status

97%276 of 284 units booked
79.4%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUNGALOW NO A79NA22101
BUNGALOW NO A80NA22101
BUNGALOW NO A81NA22101
BUNGALOW NO A82NA22101
BUNGALOW NO A83NA22101
BUNGALOW NO A84NA22101
BUNGALOW NO A85NA22101
BUNGALOW NO A86NA22101
BUNGALOW NO A87NA22101
BUNGALOW NO A88NA22101
BUNGALOW NO A89NA22101
BUNGALOW NO A90NA22101
BUNGALOW NO A91NA22101
BUNGALOW NO A92NA22101
BUNGALOW NO A93NA22101
BUNGALOW NO A94NA22101
BUNGALOW NO A95NA22101
BUNGALOW NO A96NA22101
BUNGALOW NO A97NA22101
BUNGALOW NO A98NA22101
BUNGALOW NO A99NA22101
BUNGALOW NO A100NA22101
BUNGALOW NO A101NA22101
BUNGALOW NO A102NA22101
BUNGALOW NO A103NA22101
BUNGALOW NO A104NA22101
BUNGALOW NO A105NA22101
BUNGALOW NO A106NA22101
BUNGALOW NO A107NA22101
BUNGALOW NO A108NA22101
BUNGALOW NO A109NA22101
BUNGALOW NO A110NA22101
BUNGALOW NO A111NA22101
BUNGALOW NO A112NA22101
BUNGALOW NO A113NA22101
BUNGALOW NO A114NA22101
BUNGALOW NO A115NA22101
BUNGALOW NO A116NA22101
BUNGALOW NO A117NA22101
BUNGALOW NO A118NA22101
BUNGALOW NO A119NA22101
BUNGALOW NO A120NA22101
BUNGALOW NO A121NA22101
BUNGALOW NO A122NA22101
BUNGALOW NO A123NA22101
BUNGALOW NO A124NA22101
BUNGALOW NO A125NA22101
BUNGALOW NO A126NA22101
BUNGALOW NO A127NA22101
BUNGALOW NO A128NA22101
BUNGALOW NO A129NA22101
BUNGALOW NO A130NA22101
BUNGALOW NO A131NA22101
BUNGALOW NO A132NA22101
BUNGALOW NO A133NA22101
BUNGALOW NO A134NA22101
BUNGALOW NO A135NA22101
BUNGALOW NO A136NA22101
BUNGALOW NO A137NA22101
BUNGALOW NO A138NA22101
BUNGALOW NO A139NA22101
BUNGALOW NO A140NA22101
BUNGALOW NO A141NA22101
BUNGALOW NO A142NA22101
BUNGALOW NO A143NA22101
BUNGALOW NO A144NA22101
BUNGALOW NO A145NA22101
BUNGALOW NO A146NA22101
BUNGALOW NO A147NA22101
BUNGALOW NO A148NA22101
BUNGALOW NO A149NA22101
BUNGALOW NO A150NA22101
BUNGALOW NO A151NA22101
BUNGALOW NO A152NA22101
BUNGALOW NO A153NA22101
BUNGALOW NO A154NA22101
BUNGALOW NO A155NA22101
BUNGALOW NO A156NA22101
BUNGALOW NO A157NA22101
BUNGALOW NO A158NA22101
BUNGALOW NO A159NA22101
BUNGALOW NO A160NA22101
BUNGALOW NO A161NA22101
BUNGALOW NO A162NA22101
BUNGALOW NO A163NA22101
BUNGALOW NO A164NA22101
BUNGALOW NO A165NA22101
BUNGALOW NO A166NA22101
BUNGALOW NO A167NA22101
BUNGALOW NO A168NA22101
BUNGALOW NO A169NA22101
BUNGALOW NO A170NA22101
BUNGALOW NO A171NA22101
BUNGALOW NO A172NA22101
BUNGALOW NO A173NA22101
BUNGALOW NO A174NA22101
BUNGALOW NO A175NA22101
BUNGALOW NO A176NA22101
BUNGALOW NO A177NA22101
BUNGALOW NO A178NA22101
BUNGALOW NO A179NA22101
BUNGALOW NO A180NA22101
BUNGALOW NO A181NA22101
BUNGALOW NO A182NA22101
BUNGALOW NO A183NA22101
BUNGALOW NO A184NA22101
BUNGALOW NO A185NA22101
BUNGALOW NO A186NA22101
BUNGALOW NO A187NA22101
BUNGALOW NO A188NA22101
BUNGALOW NO A189NA22101
BUNGALOW NO A190NA22101
BUNGALOW NO A191NA22101
BUNGALOW NO A192NA22101
BUNGALOW NO A193NA22101
BUNGALOW NO A194NA22101
BUNGALOW NO A195NA22101
BUNGALOW NO A196NA22101
BUNGALOW NO A197NA22101
BUNGALOW NO A198NA22101
BUNGALOW NO A199NA22101
BUNGALOW NO A200NA22101
BUNGALOW NO A201NA22101
BUNGALOW NO A202NA22101
BUNGALOW NO A203NA22101
BUNGALOW NO A204NA22101
BUNGALOW NO A205NA22101
BUNGALOW NO A206NA22101
BUNGALOW NO A207NA22101
BUNGALOW NO A208NA22101
BUNGALOW NO A209NA22101
BUNGALOW NO A210NA22101
BUNGALOW NO A211NA22101
BUNGALOW NO A212NA22101
BUNGALOW NO A213NA22101
BUNGALOW NO A214NA22101
BUNGALOW NO A215NA22101
BUNGALOW NO A216NA22101
BUNGALOW NO A217NA22101
BUNGALOW NO A218NA22101
BUNGALOW NO A219NA22101
BUNGALOW NO A220NA22101
BUNGALOW NO A221NA22101
BUNGALOW NO A222NA22101
BUNGALOW NO A223NA22101
BUNGALOW NO A224NA22101
BUNGALOW NO A225NA22101
BUNGALOW NO A226NA22101
BUNGALOW NO A227NA22101
BUNGALOW NO A228NA22101
BUNGALOW NO A229NA22101
BUNGALOW NO A230NA22101
BUNGALOW NO A231NA22101
BUNGALOW NO A232NA22101
BUNGALOW NO A233NA22101
BUNGALOW NO A234NA22101
BUNGALOW NO A235NA22101
BUNGALOW NO A236NA22101
BUNGALOW NO A237NA22101
BUNGALOW NO A238NA22101
BUNGALOW NO A239NA22101
BUNGALOW NO A240NA22101
BUNGALOW NO A241NA22101
BUNGALOW NO A242NA22101
BUNGALOW NO A243NA22101
BUNGALOW NO A244NA22101
BUNGALOW NO A245NA22101
BUNGALOW NO A246NA22101
BUNGALOW NO A247NA22101
BUNGALOW NO A248NA22101
BUNGALOW NO A249NA22101
BUNGALOW NO A250NA22101
BUNGALOW NO A251NA22101
BUNGALOW NO A252NA22101
BUNGALOW NO A253NA22101
BUNGALOW NO A254NA22101
BUNGALOW NO A255NA22101
BUNGALOW NO A256NA22101
BUNGALOW NO A257NA22101
BUNGALOW NO A258NA22101
BUNGALOW NO A259NA22101
BUNGALOW NO A260NA22101
BUNGALOW NO A261NA22101
BUNGALOW NO A358NA22101
BUNGALOW NO A359NA22101
BUNGALOW NO A360NA22101
BUNGALOW NO A361NA22101
BUNGALOW NO A362NA22101
BUNGALOW NO A363NA22101
BUNGALOW NO A364NA22101
BUNGALOW NO A365NA22101
BUNGALOW NO A366NA22101
BUNGALOW NO A367NA22101
BUNGALOW NO A368NA22101
BUNGALOW NO A369NA22101
BUNGALOW NO A370NA22101
BUNGALOW NO A371NA22101
BUNGALOW NO A372NA22101
BUNGALOW NO A373NA22101
BUNGALOW NO A374NA22101
BUNGALOW NO A375NA22101
BUNGALOW NO A376NA22101
BUNGALOW NO A377NA22101
BUNGALOW NO A378NA22101
BUNGALOW NO A379NA22101
BUNGALOW NO A380NA22101
BUNGALOW NO A381NA22101
BUNGALOW NO A382NA22101
BUNGALOW NO A383NA22101
BUNGALOW NO A384NA22101
BUNGALOW NO A385NA22101
BUNGALOW NO A386NA22101
BUNGALOW NO A387NA22101
BUNGALOW NO A388NA22101
BUNGALOW NO A389NA22101
BUNGALOW NO A390NA22101
BUNGALOW NO A391NA22101
BUNGALOW NO A392NA22101
BUNGALOW NO A393NA22101
BUNGALOW NO A394NA22101
BUNGALOW NO A395NA22101
BUNGALOW NO A396NA22101
BUNGALOW NO A397NA22101
BUNGALOW NO A398NA22101
BUNGALOW NO A399NA22101
BUNGALOW NO A400NA22101
BUNGALOW NO A401NA22101
BUNGALOW NO A402NA22101
BUNGALOW NO A403NA22101
BUNGALOW NO A404NA22101
BUNGALOW NO A405NA22101
BUNGALOW NO A406NA22101
BUNGALOW NO A407NA22101
BUNGALOW NO A408NA22101
BUNGALOW NO A409NA22101
BUNGALOW NO A410NA22101
BUNGALOW NO A411NA22101
BUNGALOW NO A412NA22101
BUNGALOW NO A413NA22101
BUNGALOW NO A414NA22101
BUNGALOW NO A415NA22101
BUNGALOW NO A416NA22101
BUNGALOW NO A417NA22101
BUNGALOW NO A418NA22101
BUNGALOW NO A419NA22101
BUNGALOW NO A420NA22101
BUNGALOW NO A421NA22101
BUNGALOW NO A422NA22101
BUNGALOW NO A423NA22101
BUNGALOW NO A424NA22101
BUNGALOW NO A425NA22101
BUNGALOW NO A426NA22101
BUNGALOW NO A427NA22101
BUNGALOW NO A428NA22101
BUNGALOW NO A429NA22101
BUNGALOW NO A430NA22101
BUNGALOW NO A431NA22101
BUNGALOW NO A432NA22101
BUNGALOW NO A433NA22101
BUNGALOW NO A434NA22101
BUNGALOW NO A435NA22101
BUNGALOW NO A436NA22101
BUNGALOW NO A437NA22101
BUNGALOW NO A438NA22101
BUNGALOW NO A439NA22101
BUNGALOW NO A440NA22101
BUNGALOW NO A441NA22101
BUNGALOW NO A442NA22101
BUNGALOW NO A443NA22101
BUNGALOW NO A444NA22101
BUNGALOW NO A445NA22101
BUNGALOW NO A446NA22101
BUNGALOW NO A447NA22101
BUNGALOW NO A448NA22101
BUNGALOW NO A449NA22101
BUNGALOW NO A450NA22101
BUNGALOW NO A451NA22101
BUNGALOW NO A452NA22101
BUNGALOW NO A453NA22101
BUNGALOW NO A454NA22101
BUNGALOW NO A455NA22101
BUNGALOW NO A456NA22101
BUNGALOW NO A457NA22101
BUNGALOW NO A458NA22101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 284 buildings; the table lists the first 20.

1934 of 3124 construction stages are filed complete across 284 buildings. The stage furthest along is Internal walls, at 96%.

BUNGALOW NO A7982%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO A8081%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%
BUNGALOW NO A8181%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
BUNGALOW NO A8291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO A8381%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
BUNGALOW NO A8481%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
BUNGALOW NO A8581%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
BUNGALOW NO A8668%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
BUNGALOW NO A8782%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO A8849%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks57%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.33%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO A8982%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO A9081%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%
BUNGALOW NO A9152%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO A9253%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises38%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO A9350%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises13%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks57%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO A9451%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises13%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks67%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO A9549%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises13%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO A9660%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises47%
Sanitary Fittings within the flats / premises44%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO A9750%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises13%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks57%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO A9852%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises38%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes75%
Street LightingYes65%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceYes75%
Open ParkingNoNot applicable

Parking filed568

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots568
Open Space568
BuildingOpen SpaceTotal
BUNGALOW NO A7922
BUNGALOW NO A8022
BUNGALOW NO A8122
BUNGALOW NO A8222
BUNGALOW NO A8322
BUNGALOW NO A8422
BUNGALOW NO A8522
BUNGALOW NO A8622
BUNGALOW NO A8722
BUNGALOW NO A8822
BUNGALOW NO A8922
BUNGALOW NO A9022
BUNGALOW NO A9122
BUNGALOW NO A9222
BUNGALOW NO A9322
BUNGALOW NO A9422
BUNGALOW NO A9522
BUNGALOW NO A9622
BUNGALOW NO A9722
BUNGALOW NO A9822
BUNGALOW NO A9922
BUNGALOW NO A10022
BUNGALOW NO A10122
BUNGALOW NO A10222
BUNGALOW NO A10322
BUNGALOW NO A10422
BUNGALOW NO A10522
BUNGALOW NO A10622
BUNGALOW NO A10722
BUNGALOW NO A10822
BUNGALOW NO A10922
BUNGALOW NO A11022
BUNGALOW NO A11122
BUNGALOW NO A11222
BUNGALOW NO A11322
BUNGALOW NO A11422
BUNGALOW NO A11522
BUNGALOW NO A11622
BUNGALOW NO A11722
BUNGALOW NO A11822
BUNGALOW NO A11922
BUNGALOW NO A12022
BUNGALOW NO A12122
BUNGALOW NO A12222
BUNGALOW NO A12322
BUNGALOW NO A12422
BUNGALOW NO A12522
BUNGALOW NO A12622
BUNGALOW NO A12722
BUNGALOW NO A12822
BUNGALOW NO A12922
BUNGALOW NO A13022
BUNGALOW NO A13122
BUNGALOW NO A13222
BUNGALOW NO A13322
BUNGALOW NO A13422
BUNGALOW NO A13522
BUNGALOW NO A13622
BUNGALOW NO A13722
BUNGALOW NO A13822
BUNGALOW NO A13922
BUNGALOW NO A14022
BUNGALOW NO A14122
BUNGALOW NO A14222
BUNGALOW NO A14322
BUNGALOW NO A14422
BUNGALOW NO A14522
BUNGALOW NO A14622
BUNGALOW NO A14722
BUNGALOW NO A14822
BUNGALOW NO A14922
BUNGALOW NO A15022
BUNGALOW NO A15122
BUNGALOW NO A15222
BUNGALOW NO A15322
BUNGALOW NO A15422
BUNGALOW NO A15522
BUNGALOW NO A15622
BUNGALOW NO A15722
BUNGALOW NO A15822
BUNGALOW NO A15922
BUNGALOW NO A16022
BUNGALOW NO A16122
BUNGALOW NO A16222
BUNGALOW NO A16322
BUNGALOW NO A16422
BUNGALOW NO A16522
BUNGALOW NO A16622
BUNGALOW NO A16722
BUNGALOW NO A16822
BUNGALOW NO A16922
BUNGALOW NO A17022
BUNGALOW NO A17122
BUNGALOW NO A17222
BUNGALOW NO A17322
BUNGALOW NO A17422
BUNGALOW NO A17522
BUNGALOW NO A17622
BUNGALOW NO A17722
BUNGALOW NO A17822
BUNGALOW NO A17922
BUNGALOW NO A18022
BUNGALOW NO A18122
BUNGALOW NO A18222
BUNGALOW NO A18322
BUNGALOW NO A18422
BUNGALOW NO A18522
BUNGALOW NO A18622
BUNGALOW NO A18722
BUNGALOW NO A18822
BUNGALOW NO A18922
BUNGALOW NO A19022
BUNGALOW NO A19122
BUNGALOW NO A19222
BUNGALOW NO A19322
BUNGALOW NO A19422
BUNGALOW NO A19522
BUNGALOW NO A19622
BUNGALOW NO A19722
BUNGALOW NO A19822
BUNGALOW NO A19922
BUNGALOW NO A20022
BUNGALOW NO A20122
BUNGALOW NO A20222
BUNGALOW NO A20322
BUNGALOW NO A20422
BUNGALOW NO A20522
BUNGALOW NO A20622
BUNGALOW NO A20722
BUNGALOW NO A20822
BUNGALOW NO A20922
BUNGALOW NO A21022
BUNGALOW NO A21122
BUNGALOW NO A21222
BUNGALOW NO A21322
BUNGALOW NO A21422
BUNGALOW NO A21522
BUNGALOW NO A21622
BUNGALOW NO A21722
BUNGALOW NO A21822
BUNGALOW NO A21922
BUNGALOW NO A22022
BUNGALOW NO A22122
BUNGALOW NO A22222
BUNGALOW NO A22322
BUNGALOW NO A22422
BUNGALOW NO A22522
BUNGALOW NO A22622
BUNGALOW NO A22722
BUNGALOW NO A22822
BUNGALOW NO A22922
BUNGALOW NO A23022
BUNGALOW NO A23122
BUNGALOW NO A23222
BUNGALOW NO A23322
BUNGALOW NO A23422
BUNGALOW NO A23522
BUNGALOW NO A23622
BUNGALOW NO A23722
BUNGALOW NO A23822
BUNGALOW NO A23922
BUNGALOW NO A24022
BUNGALOW NO A24122
BUNGALOW NO A24222
BUNGALOW NO A24322
BUNGALOW NO A24422
BUNGALOW NO A24522
BUNGALOW NO A24622
BUNGALOW NO A24722
BUNGALOW NO A24822
BUNGALOW NO A24922
BUNGALOW NO A25022
BUNGALOW NO A25122
BUNGALOW NO A25222
BUNGALOW NO A25322
BUNGALOW NO A25422
BUNGALOW NO A25522
BUNGALOW NO A25622
BUNGALOW NO A25722
BUNGALOW NO A25822
BUNGALOW NO A25922
BUNGALOW NO A26022
BUNGALOW NO A26122
BUNGALOW NO A35822
BUNGALOW NO A35922
BUNGALOW NO A36022
BUNGALOW NO A36122
BUNGALOW NO A36222
BUNGALOW NO A36322
BUNGALOW NO A36422
BUNGALOW NO A36522
BUNGALOW NO A36622
BUNGALOW NO A36722
BUNGALOW NO A36822
BUNGALOW NO A36922
BUNGALOW NO A37022
BUNGALOW NO A37122
BUNGALOW NO A37222
BUNGALOW NO A37322
BUNGALOW NO A37422
BUNGALOW NO A37522
BUNGALOW NO A37622
BUNGALOW NO A37722
BUNGALOW NO A37822
BUNGALOW NO A37922
BUNGALOW NO A38022
BUNGALOW NO A38122
BUNGALOW NO A38222
BUNGALOW NO A38322
BUNGALOW NO A38422
BUNGALOW NO A38522
BUNGALOW NO A38622
BUNGALOW NO A38722
BUNGALOW NO A38822
BUNGALOW NO A38922
BUNGALOW NO A39022
BUNGALOW NO A39122
BUNGALOW NO A39222
BUNGALOW NO A39322
BUNGALOW NO A39422
BUNGALOW NO A39522
BUNGALOW NO A39622
BUNGALOW NO A39722
BUNGALOW NO A39822
BUNGALOW NO A39922
BUNGALOW NO A40022
BUNGALOW NO A40122
BUNGALOW NO A40222
BUNGALOW NO A40322
BUNGALOW NO A40422
BUNGALOW NO A40522
BUNGALOW NO A40622
BUNGALOW NO A40722
BUNGALOW NO A40822
BUNGALOW NO A40922
BUNGALOW NO A41022
BUNGALOW NO A41122
BUNGALOW NO A41222
BUNGALOW NO A41322
BUNGALOW NO A41422
BUNGALOW NO A41522
BUNGALOW NO A41622
BUNGALOW NO A41722
BUNGALOW NO A41822
BUNGALOW NO A41922
BUNGALOW NO A42022
BUNGALOW NO A42122
BUNGALOW NO A42222
BUNGALOW NO A42322
BUNGALOW NO A42422
BUNGALOW NO A42522
BUNGALOW NO A42622
BUNGALOW NO A42722
BUNGALOW NO A42822
BUNGALOW NO A42922
BUNGALOW NO A43022
BUNGALOW NO A43122
BUNGALOW NO A43222
BUNGALOW NO A43322
BUNGALOW NO A43422
BUNGALOW NO A43522
BUNGALOW NO A43622
BUNGALOW NO A43722
BUNGALOW NO A43822
BUNGALOW NO A43922
BUNGALOW NO A44022
BUNGALOW NO A44122
BUNGALOW NO A44222
BUNGALOW NO A44322
BUNGALOW NO A44422
BUNGALOW NO A44522
BUNGALOW NO A44622
BUNGALOW NO A44722
BUNGALOW NO A44822
BUNGALOW NO A44922
BUNGALOW NO A45022
BUNGALOW NO A45122
BUNGALOW NO A45222
BUNGALOW NO A45322
BUNGALOW NO A45422
BUNGALOW NO A45522
BUNGALOW NO A45622
BUNGALOW NO A45722
BUNGALOW NO A45822

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area91,903 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofCatalyst Trusteeship Limited
Secured amountRs 275.00 crore
CERSAI search filedYes
Declared on12 Feb 2026

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority (PMRDA)
Permissible FSI47110.25
Proposed, not sanctioned47,110 sq m
Buildings approved284
Buildings sanctioned284

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNigdi, Pune
Estimated costRs 235.38 cr
Cost incurredRs 186.80 cr
Work done79.36%
BuildingWingEstimatedIncurred
-NARs 17.18 crRs 11.87 cr
BUNGALOW NO A249NARs 1.24 crRs 54.47 lakh
BUNGALOW NO A250NARs 1.24 crRs 60.79 lakh
BUNGALOW NO A372NARs 1.24 crRs 54.47 lakh
BUNGALOW NO A373NARs 1.24 crRs 54.47 lakh
BUNGALOW NO A374NARs 1.24 crRs 51.28 lakh
BUNGALOW NO A375NARs 1.24 crRs 51.28 lakh
BUNGALOW NO A79NARs 93.72 lakhRs 93.72 lakh
BUNGALOW NO A82NARs 93.72 lakhRs 93.72 lakh
BUNGALOW NO A83NARs 93.72 lakhRs 92.90 lakh
BUNGALOW NO A84NARs 93.72 lakhRs 92.45 lakh
BUNGALOW NO A86NARs 93.72 lakhRs 70.26 lakh

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSachin Funde
ArchitectLandmark Design Group
ArchitectShivam Shubhash Ganore
EngineerUmesh Joshi Designated Partner JW Consultants LLP
Engineerl l l
Chartered AccountantFAA & Associates LLP
Chartered AccountantCA Nikesh Sharma
Chartered AccountantR. Devendra Kumar & Associates
Chartered AccountantA N J K & CO LLP
PartnerRole in project
Sanjivani Integrated Township LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA24022619981Dec 2025 → Dec 2027

Reason as filed by the promoterTo, The MahaRERA Authority, Sub : Reason for the Extension to the Project Vaarivana Phase A1 bearing Registration No. P52100018391. Due to certain technical issues, the project could not be commenced within the originally scheduled timeline. At present, all works are being carried out strictly in accordance with the applicable rules and regulations, and the internal construction activities are in full progress. Upon completion of the construction, additional time will be required to obtain the Occupation Certificate from the concerned authority. We sincerely request your kind consideration in

Litigation declared4

CaseCourtStatus
515/2022Civil Judge Senior Division PuneArgument on Exhibit Unready
577/2022Civil Judge Senior Division PuneUnready Board
RTS/2A/896/2021/2021Collector PuneAwaiting Notice
515/2022 (Old Case No Special Suit No. 626/2017)/2022Civil Judge, Vadgaon, PuneOngoing

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC005000000085277Parag Bhalchandra PandharipandeSanjeevani Integrated Township LLP26/02/2021
CC12501409Dinesh KumarSanjivani Integrated Township LLP26/04/2025
CC12604952Ajith Aravind PalleeriSanjivani Integrated Township LLP05/08/2026
CC12604641Anil Kumar AddankySanjivani Integrated Township LLP24/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Mar 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Vaarivana Phase A1.pdf22 Apr 2026
Withdrawal Update Form 2File: Form 2_Vaarivana Phase A1.pdf22 Apr 2026
Withdrawal Update Form 3File: Form 3 Vaarivana Phase A1 (1).pdf22 Apr 2026
Form 5 (FY 2025-2026)File: CA Form 5_FY 2025-26_Vaarivana Phase A 1 Signed.pdf9 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A Vaarivana Phase A1 2024-25.pdf17 Mar 2026
Withdrawal Update Form 1File: VAARIVANA PHASE A1 ARCHITECT CERTIFICATE JUNE-24 FORM-1_compressed.pdf24 Feb 2026
Withdrawal Update Form 1File: VAARIVANA PHASE A1 ARCHITECT CERTIFICATE JUNE-24 FORM-1_compressed.pdf24 Feb 2026
Withdrawal Update Form 1File: VAARIVANA PHASE A1 ARCHITECT CERTIFICATE JUNE-24 FORM-1_compressed.pdf24 Feb 2026
Withdrawal Update Form 1File: VAARIVANA PHASE A1 ARCHITECT CERTIFICATE JUNE-24 FORM-1_compressed.pdf24 Feb 2026
Withdrawal Update Form 1File: VAARIVANA PHASE A1 ARCHITECT CERTIFICATE JUNE-24 FORM-1_compressed.pdf24 Feb 2026
Withdrawal Update Form 224 Feb 2026
Withdrawal Update Form 224 Feb 2026
Withdrawal Update Form 224 Feb 2026
Withdrawal Update Form 224 Feb 2026
Withdrawal Update Form 224 Feb 2026
Withdrawal Update Form 3File: VAARIVANA PHASE A1 CA CERTIFICATE.pdf24 Feb 2026
Withdrawal Update Form 3File: VAARIVANA PHASE A1 CA CERTIFICATE.pdf24 Feb 2026
Withdrawal Update Form 3File: VAARIVANA PHASE A1 CA CERTIFICATE.pdf24 Feb 2026
Withdrawal Update Form 3File: VAARIVANA PHASE A1 CA CERTIFICATE.pdf24 Feb 2026
Withdrawal Update Form 3File: VAARIVANA PHASE A1 CA CERTIFICATE.pdf24 Feb 2026
Form 5 (FY 2024-2025)File: VAARIVANA PHASE A1_CA CERTIFICATE_FORM-5_2024-25.pdf6 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VAARIVANA PHASE A1_ARCHITECT CERTIFICATE_DECEMBER-24_ FORM-1.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VAARIVANA PHASE A1_ARCHITECT CERTIFICATE_SEP-24_ FORM-1.pdf9 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: VAARIVANA PHASE A1_CA CERTIFICATE_FORM-5_2023-24.pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VAARIVANA PHASE A1 ARCHITECT CERTIFICATE JUNE-24 FORM-1_compressed.pdf30 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_VAARIVANA PHASE A1_ARCHITECT CERTIFICATE_MAR-24_compressed.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 19_VAARIVANA PHASE A1_QUALITY CERTIFICATE_FORM-2A_2023-24_compressed.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: VAARIVANA PHASE A1_SOLD UNSOLD INVENTORY CERTIFICATE_MAR-24_compressed.pdf7 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1_VAARIVANA PHASE A1_P52100018391_2022-23_compressed.pdf25 Apr 2024
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE_VAARIVANA PHASE A1.pdf9 Apr 2024
Disclosure of sold/ booked inventoryFile: VAARIVANA PHASE A1_SALES INVENTORY_DEC-2023.pdf23 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 1_VAARIVANA PHASE A1_P52100018391_2019-20.pdf16 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 1_VAARIVANA PHASE A1_P52100018391_2020-21.pdf16 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: VAARIVANA PHASE A1.pdf15 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1_VAARIVANA PHASE A1_P52100018391.pdf3 Aug 2020
Building plan approvalFile: LAYOUT.pdf17 Mar 2020
Layout approvalFile: A-1.pdf17 Mar 2020
Layout approvalFile: A-2.pdf17 Mar 2020
Layout approvalFile: A-3.pdf17 Mar 2020
Layout approvalFile: A-4.pdf17 Mar 2020
Layout approvalFile: A-5.pdf17 Mar 2020
Layout approvalFile: A-6.pdf17 Mar 2020
Layout approvalFile: A-7.pdf17 Mar 2020
Copy of Layout Approval (in case of layout)File: A-1.pdf17 Mar 2020
Copy of Layout Approval (in case of layout)File: A-2.pdf17 Mar 2020
Copy of Layout Approval (in case of layout)File: A-3.pdf17 Mar 2020
Copy of Layout Approval (in case of layout)File: A-4.pdf17 Mar 2020
Copy of Layout Approval (in case of layout)File: A-5.pdf17 Mar 2020
Copy of Layout Approval (in case of layout)File: A-6.pdf17 Mar 2020
Copy of Layout Approval (in case of layout)File: A-7.pdf17 Mar 2020
Building Plan Approval (IOD)File: LAYOUT.pdf17 Mar 2020
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf17 Mar 2020
Proforma of Allotment letterFile: AGREEMENT.pdf14 Feb 2020
Proforma of Allotment letterFile: 1-24-03-19_VAARIVAN_AGREEMENT_PHASE-A-1.pdf26 Mar 2019
Proforma of Allotment letterFile: 1-09-03-19_For_RERA_Update_VAARIVAN_AGREEMENT_FOR_SALE_OF_PLOT_PHASE-A-1.pdf9 Mar 2019
Building plan approvalFile: MAIN LAYOUT PLAN.pdf5 Oct 2018
Layout approvalFile: A2.pdf5 Oct 2018
Layout approvalFile: A3.pdf5 Oct 2018
Layout approvalFile: A4.pdf5 Oct 2018
Layout approvalFile: A5.pdf5 Oct 2018
Layout approvalFile: A6.pdf5 Oct 2018
Layout approvalFile: A7.pdf5 Oct 2018
PAN CardFile: PAN CARD - SITLLP.pdf5 Oct 2018
Copy of the legal title reportFile: 1.pdf5 Oct 2018
Copy of the legal title reportFile: 2.pdf5 Oct 2018
Copy of the legal title reportFile: 3.pdf5 Oct 2018
Copy of the legal title reportFile: 4.pdf5 Oct 2018
Copy of the legal title reportFile: 5.pdf5 Oct 2018
Copy of the legal title reportFile: 6.pdf5 Oct 2018
Copy of the legal title reportFile: 7.pdf5 Oct 2018
Copy of the legal title reportFile: 8.pdf5 Oct 2018
Details of encumbrancesFile: SITLLP - ENCUMBRANCE.pdf5 Oct 2018
Copy of Layout Approval (in case of layout)File: A2.pdf5 Oct 2018
Copy of Layout Approval (in case of layout)File: A3.pdf5 Oct 2018
Copy of Layout Approval (in case of layout)File: A4.pdf5 Oct 2018
Copy of Layout Approval (in case of layout)File: A5.pdf5 Oct 2018
Copy of Layout Approval (in case of layout)File: A6.pdf5 Oct 2018
Copy of Layout Approval (in case of layout)File: A7.pdf5 Oct 2018
Building Plan Approval (IOD)File: MAIN LAYOUT PLAN.pdf5 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: SITLLP - PHASE A 1 - CERTIFICATE.pdf5 Oct 2018

How this compares with Pune

97%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vaarivana Phase A - 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Urse13,700+ in Pune

2 kmVaarivana Phase A - 1Completed 1Lapsed / revoked 3Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: Sanjivani Integrated Township LLP

Sanjivani Integrated Township LLP has 10 registrations on MahaRERA, including Vaarivana Phase A - 1 and Vaarivana Phase C. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Vaarivana Phase A - 1 is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vaarivana Phase A - 1?

The registered promoter entity is Sanjivani Integrated Township LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vaarivana Phase A - 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Vaarivana Phase A - 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Vaarivana Phase A - 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vaarivana Phase A - 1?

The professionals named in the filing: Architect: Sachin Funde; Architect: Landmark Design Group; Architect: Shivam Shubhash Ganore; Engineer: Umesh Joshi Designated Partner JW Consultants LLP; Engineer: l l l; Chartered Accountant: FAA & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vaarivana Phase A - 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vaarivana Phase A - 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vaarivana Phase A - 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.