Home / Browse projects / Pune, Maharashtra / UTKARSH HEIGHTS

Registered No litigation declared Others project

UTKARSH HEIGHTS

By UTKARSH ASSOCIATES

RG-MH-14694 · RERA P52100023142 · Last updated on MahaRERA portal: 5 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedmoved 36 months from the original
2 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 70%
51 of 54Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 173 documents Report an error

UTKARSH HEIGHTS is a Others project by UTKARSH ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100023142 on 4 Dec 2019. Possession is promised by 31 Mar 2029. The completion date has moved by 36 months from the original filing. 3 of the 54 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.

At a glance

Project

  • NameUTKARSH HEIGHTS
  • TypeOthers
  • Location
    • RAVIWAR PETH
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411002
  • Pincode411002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100023142
  • ReraGenie IDRG-MH-14694

Builder

  • NameUTKARSH ASSOCIATES
  • Entity typePartnership
  • PartnersMOHAMMAD HAMID SHAIKH, VRUSHALI RAOSAHEB SHEDGE, LATA GOUDA, PRATIBHA R DHANGEKAR

Key dates

this monthRegisteredDec 2019First promiseMar 2026Revised toMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2019
  • Promised completion31 Mar 2029
  • Revised completionRevised to 31 Mar 2029 (originally 30 Mar 2026)
  • Buildings2 building records
  • Documents filed173 files

Current status

6%3 of 54 units booked

Figures as on 5 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UTKARSH HEIGHTS - A WINGNA12812627
UTKARSH HEIGHTS - B WINGNA12827027

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 70%.

UTKARSH HEIGHTS - A WING22%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UTKARSH HEIGHTS - B WING22%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed44

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots44
Closed/Covered44

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area945 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI5429.65
Proposed, not sanctioned1,930 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShanipar

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNISAR PATHAN & ASSOCIATES
EngineerRohit Rao Saheb Shedge
Chartered AccountantSACHIN SHARMA
Chartered AccountantPatel and Sharma Chartered Accountants
Chartered AccountantAgarwal and Sarawgi Associates
Chartered AccountantSBH
Chartered AccountantASAK CO
PartnerRole in project
UTKARSH ASSOCIATES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA06062621259Mar 2026 → Mar 2029

Reason as filed by the promoterThe construction work at the site has been suspended for some time due to certain technical issues and litigation matters. As per the directions of the sanctioning authority, the work has been stopped vide Letter No. 5432/3114/2024. A copy of the said letter is attached herewith for your reference. Due to the suspension of work beyond our control, there has been an unavoidable delay in project progress. Therefore, we kindly request that the completion period be extended accordingly to cover the duration of the stoppage

Litigation declared3

CaseCourtStatus
CIVIL SUIT 307/2014/2014SMALL CAUSES COURT PUNESettled and Order Passed
CIVIL SUIT 310/2014/2014SMALL CAUSES COURT PUNESettled and Order Passed
CIVIL SUIT 419/2015/2015SMALL CAUSES COURT PUNESettled and Order Passed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed173

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 173 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Arch Letter 1.pdf5 Jun 2026
Form 2File: form 2.pdf5 Jun 2026
Form 3File: final form 3 signed_0001_compressed.pdf5 Jun 2026
Disclosure of Sold and Booked InventoryFile: 00 Sold Unsol Draft - MAR 26.pdf5 Jun 2026
Form 2A (FY 2019-2020)File: form 2a 2020_0001.pdf16 Mar 2026
Form 2A (FY 2020-2021)File: form 2a 2021_0001.pdf16 Mar 2026
Form 2A (FY 2021-2022)File: form 2a 2021_0001.pdf16 Mar 2026
Form 2A (FY 2022-2023)File: form 2a 2023_0001.pdf16 Mar 2026
Form 2A (FY 2023-2024)File: form 2 a 2024_0001.pdf16 Mar 2026
Form 2A (FY 2024-2025)File: form 2a 25.pdf16 Mar 2026
Form 5 (FY 2019-2020)File: form 5 19-20.pdf16 Mar 2026
Form 5 (FY 2020-2021)File: form 5 20-21.pdf16 Mar 2026
Form 5 (FY 2021-2022)File: fORM 5 21-22_0001.pdf16 Mar 2026
Form 5 (FY 2022-2023)File: fORM 5 22-23_0001.pdf16 Mar 2026
Form 5 (FY 2023-2024)File: fORM 5 2023-24_0001.pdf16 Mar 2026
Form 5 (FY 2024-2025)File: Form 5_0001.pdf10 Feb 2026
Form 1File: form 1_0001.pdf22 Jan 2026
Form 2File: utkarsh heights dec form 2.pdf22 Jan 2026
Form 3File: utkarsha heights 30-12-2025 (1)_0001_compressed.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: utkarsh heights_0001.pdf22 Jan 2026
Form 1File: Form 01- Jun 25.pdf20 Jan 2026
Form 2File: utkarsh heights june for 2.pdf20 Jan 2026
Form 3File: utkarsha heights 30-6-2025 form 3.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: utkarsh heights june sold unsold.pdf20 Jan 2026
Form 1File: form 1 sep 25.pdf20 Jan 2026
Form 2File: utkarsh heights sep_ form 2.pdf20 Jan 2026
Form 3File: utkarsha heights 30-9-2025 (1)_0001.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: utkarsh heights sep_ sold unsold.pdf20 Jan 2026
Form 1File: form 1 jun 21.pdf17 Jan 2026
Form 2File: form 2.pdf17 Jan 2026
Form 3File: form 3 june 21.pdf17 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold.pdf17 Jan 2026
Form 1File: form 1 sep 21.pdf17 Jan 2026
Form 2File: form 2.pdf17 Jan 2026
Form 3File: form 3 SEP 21.pdf17 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold.pdf17 Jan 2026
Form 1File: Form 01- mar 25.pdf17 Jan 2026
Form 2File: 15) March 25 form 2.pdf17 Jan 2026
Form 3File: 01 form 3.pdf17 Jan 2026
Disclosure of Sold and Booked InventoryFile: 12 Sold Unsold- mar 25.pdf17 Jan 2026
Form 1File: form 1.pdf31 Dec 2025
Form 2File: form 2.pdf31 Dec 2025
Form 3File: form 3.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf31 Dec 2025
Form 1File: form 1.pdf31 Dec 2025
Form 2File: form 2.pdf31 Dec 2025
Form 3File: form 3.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf31 Dec 2025
Form 1File: form 1.pdf31 Dec 2025
Form 2File: form 2.pdf31 Dec 2025
Form 3File: form 3.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf31 Dec 2025
Form 1File: form 1.pdf31 Dec 2025
Form 2File: form 2.pdf31 Dec 2025
Form 3File: form 3.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf31 Dec 2025
Form 1File: form 1.pdf31 Dec 2025
Form 2File: form 2.pdf31 Dec 2025
Form 3File: form 3.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf31 Dec 2025
Form 1File: form 1.pdf31 Dec 2025
Form 2File: form 2.pdf31 Dec 2025
Form 3File: form 3.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf31 Dec 2025
Form 1File: Form 01- Dec 24 (2).pdf27 Dec 2025
Form 2File: 14) Dec 24 form 2.pdf27 Dec 2025
Form 3File: 01 form 3.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf27 Dec 2025
Form 1File: form 1 dec 21.pdf24 Dec 2025
Form 2File: 1) Dec 21 form 2.pdf24 Dec 2025
Form 3File: form 3 dec21.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: 01 Sold Unsold Dec 21.pdf24 Dec 2025
Form 1File: form 1 mar 22.pdf24 Dec 2025
Form 2File: form 2.pdf24 Dec 2025
Form 3File: form 3 mar 22.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: 02 Sold Unsold- mar22.pdf24 Dec 2025
Form 1File: form 1 jun 22.pdf24 Dec 2025
Form 2File: 3) June 22 form 2.pdf24 Dec 2025
Form 3File: form 3.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: 03 Sold Unsold- June 22.pdf24 Dec 2025

How this compares with Pune

6%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 36 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UTKARSH HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAVIWAR PETH13,700+ in Pune

2 kmUTKARSH HEIGHTSCompleted 172Lapsed / revoked 138Other 135Dot size: filed unitsN

Filed coordinates, straight-line distance. 445 registered projects within 2 km.

Builder: UTKARSH ASSOCIATES

UTKARSH ASSOCIATES has 1 registration on MahaRERA, including UTKARSH HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if UTKARSH HEIGHTS is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UTKARSH HEIGHTS?

The registered promoter entity is UTKARSH ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UTKARSH HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for UTKARSH HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UTKARSH HEIGHTS?

The professionals named in the filing: Architect: NISAR PATHAN & ASSOCIATES; Engineer: Rohit Rao Saheb Shedge; Chartered Accountant: SACHIN SHARMA; Chartered Accountant: Patel and Sharma Chartered Accountants; Chartered Accountant: Agarwal and Sarawgi Associates; Chartered Accountant: SBH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UTKARSH HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UTKARSH HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UTKARSH HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.