Home / Browse projects / Thane, Maharashtra / URBAN GRANDEUR BLDG-2

Registered Litigation declared Residential / Group Housing project

URBAN GRANDEUR BLDG-2

By CLLARO ENTERPRISES LLP

RG-MH-94715 · RERA P51700046697 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 2 complaints at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
11 of 11Construction stages doneevery applicable stage filed complete
29 of 208Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

URBAN GRANDEUR BLDG-2 is a Residential / Group Housing project by CLLARO ENTERPRISES LLP in Thane, Maharashtra, registered with MahaRERA as P51700046697 on 30 Aug 2022. Possession is promised by 30 Jun 2027. 179 of the 208 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameURBAN GRANDEUR BLDG-2
  • TypeResidential / Group Housing
  • Location
    • Opp. Winstone Tower
    • Mirabhayandar Road
    • Beverly Park
    • Miraroad E
    • MIRAROAD E
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700046697
  • ReraGenie IDRG-MH-94715

Builder

  • NameCLLARO ENTERPRISES LLP
  • Entity typePartnership
  • PartnersNIRAJ PRAKASH BHANDARI, VICKY VIJAYNARAYAN GOYAL, DHAVAL DHIMANT SHAH, JAY DHIMANT SHAH, SHAHURAJ SATYAWAN DHANEGAVE
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredAug 2022PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Aug 2022
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed119 files

Current status

86%179 of 208 units booked
66.2%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
URBAN GRANDEUR BLDG-2NA352618721208

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

URBAN GRANDEUR BLDG-2: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed189

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots189
Closed/Covered189

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,017 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Mar 2026

Approvals and building plan

Sanctioning authorityMIRA BHAYANDER MAHANAGAR PALIKA ( MBMC)
Permissible FSI19900.93
Proposed, not sanctioned19,901 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANPADA THANE
Estimated costRs 159.60 cr
Cost incurredRs 105.59 cr
Work done66.16%
BuildingWingEstimatedIncurred
URBAN GRANDEUR BLDG-2NARs 149.60 crRs 105.59 cr
-NARs 10.00 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANISH and ASSOCIATES
ArchitectAnish & Associates
EngineerABHIJEET ASHOK LONDHE
EngineerRAKESH PATEL
Chartered AccountantCTR AND ASSOCIATES CHARTERED ACCOUNTANTS
Chartered AccountantHaresh Mehta Chartered Accountants & Associates
Chartered AccountantSTR AND ASSOCIATES
PartnerRole in project
CLLARO ENTERPRISES LLP-

Litigation declared1

CaseCourtStatus
SPL CIVIL SUITE 505/2022/2022CIVIL COURT S D THANEOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12401171CLLARO ENTERPRISES LLPHaresh Jitendra Dubey18/12/2024
CC12401172CLLARO ENTERPRISES LLPRobin Jitendra Dubey18/12/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 31-03-2026.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2 31-03-2026.PDF20 Apr 2026
Withdrawal Update Form 3File: FORM 3 31-03-2026.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1 - 31-12-2025.pdf17 Jan 2026
Withdrawal Update Form 2File: FORM 2 - 31-12-2025.PDF17 Jan 2026
Withdrawal Update Form 3File: FORM 3 - 31-12-2025.pdf17 Jan 2026
Form 2A (FY 2024-2025)File: FORM 2A - 2024-25.pdf31 Oct 2025
Withdrawal Update Form 1File: FROM 1 - 30-09-2025.pdf28 Oct 2025
Withdrawal Update Form 2File: FORM 2 - 30-09-2025.pdf28 Oct 2025
Withdrawal Update Form 3File: FORM 3 - 30-09-2025.pdf28 Oct 2025
Form 2A (FY 2023-2024)File: Form 2A - 2023-24.pdf28 Oct 2025
Form 5 (FY 2022-2023)File: Form 5 2022-23.pdf9 Oct 2025
Form 5 (FY 2023-2024)File: Form 5 2023-24.pdf9 Oct 2025
Form 1File: FORM 1.pdf15 Jul 2025
Form 2File: FORM 2.pdf15 Jul 2025
Form 3File: FORM 3.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD.pdf15 Jul 2025
Form 1File: ARCHITECT CERTIFICATE.pdf20 May 2025
Form 2File: ENG CERTIFICATE.pdf20 May 2025
Form 3File: CA CERTIFICATE.pdf20 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD.pdf20 May 2025
OthersFile: RERA Bank letters.pdf20 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE (3) (1).pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE (3) (1).pdf6 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory March 2025.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginer Certificate March 2025.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf19 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: UG CA Form 5 (1).pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: sold and Unsold Inventory.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: 30-06-2024 sold unsold inventory.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold Inventory.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bldg no 2 Urban Grandeur Architect Certificate .pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bldg no 2 Urban Grandeur Engineer Certificate.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bldg no 2 Urban Grandeur CA Certificate (2).pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bldg No 2 Urban Grandeur Sold Unsold inventory (2).pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: UG CA CERTIFICATE GRANDEUR.pdf23 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bldg no 2 Urban Grandeur Architect letter.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bldg no 2 Urban Grandeur Engineer Certificate .pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: URBAN GRANDEUR FORM 2A.pdf30 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: URBAN GRANDEUR FORM 5.pdf30 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UG Architech letter.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: UG Engineer certificate.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: UG Discolsure of sold unsold inventory _compressed.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate_compressed (4).pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: UG CA Certificate_compressed.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: INVENTORY.pdf27 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Anish and Associates UG Architect Certificate.pdf21 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ug engineer.pdf21 Oct 2023
Disclosure of sold/ booked inventoryFile: UG s u.pdf21 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: UG CA.pdf21 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UG ARCHITECT CERTIFICATE .pdf25 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf25 Jul 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD.pdf25 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf25 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A.pdf25 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE URBAN GRANDEUR.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate urban grandeur.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD AND UNSOLD URBAN GRANDEUR.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FINAL.pdf20 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANEEXURE A.pdf20 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf20 Apr 2023
Proforma of Agreement for saleFile: AFS UG.pdf9 Mar 2023
Proforma of Allotment letterFile: AL UG.pdf9 Mar 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER URBAN GRANDEUR.pdf31 Jan 2023
Proforma of Agreement for saleFile: REVISED DRAFT AFS URBAN GRANDEUR.pdf27 Jan 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER URBAN GRANDEUR.pdf27 Jan 2023
Layout approvalFile: 1_11zon.pdf25 Jan 2023
Building plan approvalFile: 2_11zon.pdf25 Jan 2023
Building plan approvalFile: 3_11zon.pdf25 Jan 2023
Building plan approvalFile: 4_11zon.pdf25 Jan 2023
Copy of Layout Approval (in case of layout)File: 1_11zon.pdf25 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 2_11zon.pdf25 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 3_11zon.pdf25 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 4_11zon.pdf25 Jan 2023

How this compares with Thane

86%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep URBAN GRANDEUR BLDG-2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIRAROAD E7,600+ in Thane

2 kmURBAN GRANDEUR BLDG-2Completed 102Lapsed / revoked 77Other 106Dot size: filed unitsN

Filed coordinates, straight-line distance. 285 registered projects within 2 km.

Builder: CLLARO ENTERPRISES LLP

CLLARO ENTERPRISES LLP has 2 registrations on MahaRERA, including URBAN GRANDEUR BLDG-2 and URBAN NEST BLDG - 1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if URBAN GRANDEUR BLDG-2 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of URBAN GRANDEUR BLDG-2?

The registered promoter entity is CLLARO ENTERPRISES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in URBAN GRANDEUR BLDG-2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against URBAN GRANDEUR BLDG-2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for URBAN GRANDEUR BLDG-2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at URBAN GRANDEUR BLDG-2?

The professionals named in the filing: Architect: ANISH and ASSOCIATES; Architect: Anish & Associates; Engineer: ABHIJEET ASHOK LONDHE; Engineer: RAKESH PATEL; Chartered Accountant: CTR AND ASSOCIATES CHARTERED ACCOUNTANTS; Chartered Accountant: Haresh Mehta Chartered Accountants & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in URBAN GRANDEUR BLDG-2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About URBAN GRANDEUR BLDG-2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save URBAN GRANDEUR BLDG-2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.