Registered No litigation declared Residential / Group Housing project

Upper Thane-Verdura A

By Lodha Developers Limited

RG-MH-18098 · RERA P51700055789 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 178 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jul 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 75%
210 of 210Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

Upper Thane-Verdura A is a Residential / Group Housing project by Lodha Developers Limited in Thane, Maharashtra, registered with MahaRERA as P51700055789 on 16 Apr 2024. Possession is promised by 31 Jul 2028. 0 of the 210 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameUpper Thane-Verdura A
  • TypeResidential / Group Housing
  • Location
    • Surai
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700055789
  • ReraGenie IDRG-MH-18098

Builder

  • NameLodha Developers Limited
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • WtdRaunika Malhotra
  • Other registrations178 more →
  • Completed16 of 179
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date3
  • Declared earlier projects22 →

Key dates

this monthRegisteredApr 2024PromisedJul 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Apr 2024
  • Promised completion31 Jul 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed63 files

Current status

0%0 of 210 units booked
23.0%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Verdura ANA24242100210

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.

Verdura A: 35% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered60

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,058 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Sep 2024

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI19800.0
Proposed, not sanctioned13,561 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd, , Trade World, B Wing, Kamla Mill Compound, Senapati Bapat Marg, Lower Parel, Mumbai
Estimated costRs 28.10 cr
Cost incurredRs 6.46 cr
Work done22.98%
BuildingWingEstimatedIncurred
Verdura ANARs 18.27 crRs 4.20 cr
-NARs 9.84 crRs 2.26 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVilas Desai & Associate
ArchitectVINI VILAS DESAI
ArchitectPradeep m Kamble
EngineerK C Shah Consultants
EngineerMEHUL KAIVANT SHAH
EngineerArnavi Dalvi
Chartered AccountantChirag Sarvaiya & Co
Chartered AccountantChirag Bharat Sarvaiya
Chartered AccountantMSKA & Associates
PartnerRole in project
Lodha Developers Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2028

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - Upper Thane-Verdura A - P51700055789.pdf23 Jun 2026
Withdrawal Update Form 1File: Form1 - Upper Thane - Verdura A - P51700055789- Mar-26.pdf27 Apr 2026
Withdrawal Update Form 2File: Verdura A Mar 2026 - Form 02 Signed.pdf27 Apr 2026
Withdrawal Update Form 3File: Verdura A Mar 2026 - Form 03 Signed.pdf27 Apr 2026
Withdrawal Update Form 1File: Form-1 Verdura A - Dec-25.pdf27 Jan 2026
Withdrawal Update Form 2File: Verdura A Form 02 Signed Dec 25.pdf27 Jan 2026
Withdrawal Update Form 3File: Verdura A Form 03 Signed Dec 25.pdf27 Jan 2026
Withdrawal Update Form 1File: Upper Thane - Verdura A.pdf29 Oct 2025
Withdrawal Update Form 2File: Form 2 - Verdura A - Sep 25.pdf29 Oct 2025
Withdrawal Update Form 3File: Form 03 - Verdura A - Sep 25 signed.pdf29 Oct 2025
Form 5 (FY 2024-2025)File: UT - Verdura A.pdf14 Oct 2025
Form 2A (FY 2024-2025)File: Upper Thane - Meadows A Renamed to Upper Thane - Verdura A - P51700055789 - Form 2A.pdf25 Jul 2025
Form 1File: Upper Thane - Verdura A ( Meadow A) - Form1 - June 25 - P51700055789 -okk.pdf18 Jul 2025
Form 2File: Form 2 - Verdura A - June-25.pdf18 Jul 2025
Form 3File: Form 3 - Verdura A - June-25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold June 2025.pdf18 Jul 2025
Form 1File: Form 1 -Lodha Villa Royale TDLR2-March 25.pdf10 Jun 2025
Form 2File: Lodha Villa Royale TDLR 2 (Form 2).pdf10 Jun 2025
Form 3File: Lodha Villa Royale TDLR 2 (Form 3).pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Signed Sold-Unsold_Lodha Villa Royale TDLR 2 March 2025.pdf10 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration.pdf10 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (Upper Thane -Vardura A).pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Verdura Dec 2024.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2 Verdura Dec 2024.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UT Verdura A.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold_Verdura Dec 2024.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Signed Sold-Unsold_Verdura Sep 2024.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UT Verdura A.pdf5 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Meadows A CC Dec.pdf10 Apr 2024
Other - TechnicalFile: Meadows A CC Dec.pdf10 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: 20230603 - Upper Thane - Amended CC - Residential Commercial Bldg.pdf3 Apr 2024
Other - TechnicalFile: Order 50.pdf3 Apr 2024
Layout approvalFile: Approved Layout marked Casa Meadows Wing - G - converted (1).pdf2 Apr 2024
Building plan approvalFile: Sheet 32 - Typical Plan.pdf2 Apr 2024
Building plan approvalFile: Sheet 33 -Refuge ,Terrace.pdf2 Apr 2024
Building plan approvalFile: Sheet 34 - Section Plan.pdf2 Apr 2024
PAN CardFile: 1 PAN Card (1).pdf2 Apr 2024
Copy of the legal title reportFile: Legal Report on Title_Anjur Land_Meadows-A.pdf2 Apr 2024
Details of encumbrances concerned to FinanceFile: Emcumbrances to Finance.pdf2 Apr 2024
Details of encumbrances concerned to FinanceFile: Emcumbrances to Legal.pdf2 Apr 2024
Details of encumbrances concerned to LegalFile: Emcumbrances to Finance.pdf2 Apr 2024
Details of encumbrances concerned to LegalFile: Emcumbrances to Legal.pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: Approved Layout marked Casa Meadows Wing - G - converted (1).pdf2 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 32 - Typical Plan.pdf2 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 33 -Refuge ,Terrace.pdf2 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 34 - Section Plan.pdf2 Apr 2024
Declaration about Commencement CertificateFile: Final CC Declaration.pdf2 Apr 2024
Declaration in FORM BFile: Form B.pdf2 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200302808402_For_Asset_Based_Search_02_04_2024_12_48_44_769.pdf2 Apr 2024
CERSAI detailsFile: Cersai Declaration.pdf2 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf2 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (1).pdf2 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations (1).pdf2 Apr 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (4).pdf2 Apr 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (4).pdf2 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank declaration.pdf2 Apr 2024
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter (7).pdf2 Apr 2024
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (4).pdf2 Apr 2024
Other - LegalFile: 1 Other - Legal (1).pdf2 Apr 2024
Other - LegalFile: 2 Other - Legal (1).pdf2 Apr 2024
Other - LegalFile: Deed of Conveyance 5222_compressed.pdf2 Apr 2024
Other - LegalFile: Conveyance Deed of Regd No15371-2023 - Compress - Final.pdf2 Apr 2024
Other - LegalFile: Regd Deed of Conveyance 8425 2008 - Final - Compress_compressed.pdf2 Apr 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Liana BP51700033964Dombivali, ThaneMar 2022CompletedFeb 2026Jun 2024

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Upper Thane-Verdura A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Surai7,600+ in Thane

Builder: Lodha Developers Limited

LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Upper Thane-Verdura A is delayed beyond 31 Jul 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Upper Thane-Verdura A?

The registered promoter entity is Lodha Developers Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Upper Thane-Verdura A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Upper Thane-Verdura A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Upper Thane-Verdura A?

The professionals named in the filing: Architect: Vilas Desai & Associate; Architect: VINI VILAS DESAI; Architect: Pradeep m Kamble; Engineer: K C Shah Consultants; Engineer: MEHUL KAIVANT SHAH; Engineer: Arnavi Dalvi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Upper Thane-Verdura A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Upper Thane-Verdura A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Upper Thane-Verdura A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.