Completed No litigation declared Commercial project

Upper Thane-MLCP C Shops

By Macrotech Developers Limited

RG-MH-18599 · RERA P51700077506 · Last updated on MahaRERA portal: 17 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
27 of 27Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Upper Thane-MLCP C Shops is a Commercial project by Macrotech Developers Limited in Thane, Maharashtra, registered with MahaRERA as P51700077506 on 20 Aug 2024. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 0 of the 27 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameUpper Thane-MLCP C Shops
  • TypeCommercial
  • Location
    • Mankoli Street
    • Mankoli
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700077506
  • ReraGenie IDRG-MH-18599

Builder

  • NameMacrotech Developers Limited
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorRajendra Lodha Lodha
  • Other registrations140 more →
  • Completed126 of 141
  • No longer live13 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredAug 2024First promiseDec 2024Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Aug 2024
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed71 files

Current status

0%0 of 27 units booked
94.0%Work done, per cost certificate

Figures as on 17 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MLCP 02- Sector BNA14102727

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

MLCP 02- Sector B: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed3883

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3,883
Closed/Covered3,883

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,098 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 May 2026
LandownerVillageDistrict
Mandabai Balaram Patil and others-VeheleThane

Approvals and building plan

Sanctioning authorityMumbai Metropolitan Region Development Authority
Permissible FSI1798.78
Proposed, not sanctioned1,799 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd, Bombay Hub Wing, Kamala Mills Compound,Senapati Bapat marg,Lower Parel,Mumbai 400013
Estimated costRs 3.96 cr
Cost incurredRs 3.72 cr
Work done94.0%
BuildingWingEstimatedIncurred
MLCP 02- Sector BNARs 2.57 crRs 2.42 cr
-NARs 1.38 crRs 1.30 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVilas Desai & Associate
ArchitectVINI VILAS DESAI
EngineerK C Shah Consultants
EngineerMEHUL KAIVANT SHAH
EngineerRahul Dhanawade
Chartered AccountantChirag Sarvaiya & Co
Chartered AccountantChirag Bharat Sarvaiya
PartnerRole in project
Lodha Developers Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA27052621115Dec 2024 → Dec 2026

Reason as filed by the promoterOur MahaRERA project “Upper Thane MLCP C Shops” bearing RERA Registration No. P51700077506 has a completion date of 31th Dec 2024. We have already uploaded the Full Occupancy Certificate dated 20th Mar 2023 on the MahaRERA portal for your kind reference. However, the project is currently reflecting under the category of “Lapsed Projects.”

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Jul 2024

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Full OC - MLCP both OC.pdf17 Aug 2026
Withdrawal Update Form 1File: Form 1_merged_removed.pdf30 Jul 2026
Withdrawal Update Form 2File: Form - 2 Signed ----.pdf30 Jul 2026
Withdrawal Update Form 3File: Form - 3 Signed ----.pdf30 Jul 2026
Layout approvalFile: MLCP-02 Marked on approved layout 14 07 2022 - Compress.pdf5 Jun 2026
Building plan approvalFile: 12 Sector-B_MLCP-2.pdf5 Jun 2026
Building plan approvalFile: 13 Sector-B_MLCP-2.pdf5 Jun 2026
Withdrawal Update Form 1File: Form 1_merged_removed.pdf2 Jun 2026
Withdrawal Update Form 1File: Form 1_merged_removed.pdf2 Jun 2026
Withdrawal Update Form 1File: Form 1_merged_removed.pdf2 Jun 2026
Withdrawal Update Form 1File: Form 1_merged_removed.pdf2 Jun 2026
Withdrawal Update Form 2File: Form - 2 Signed ----.pdf2 Jun 2026
Withdrawal Update Form 2File: Form - 2 Signed ----.pdf2 Jun 2026
Withdrawal Update Form 2File: Form - 2 Signed ----.pdf2 Jun 2026
Withdrawal Update Form 2File: Form - 2 Signed ----.pdf2 Jun 2026
Withdrawal Update Form 3File: Form - 3 Signed ----.pdf2 Jun 2026
Withdrawal Update Form 3File: Form - 3 Signed ----.pdf2 Jun 2026
Withdrawal Update Form 3File: Form - 3 Signed ----.pdf2 Jun 2026
Withdrawal Update Form 3File: Form - 3 Signed ----.pdf2 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A -.pdf2 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A -.pdf2 Jun 2026
Architect’s Certificate on Completion of Project (Form 4)File: MLCP C - 77506.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UT MLCP C Shops.pdf5 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf13 Aug 2024
Other - TechnicalFile: Declartion'.pdf13 Aug 2024
Declaration about Commencement CertificateFile: CC Declaration New.pdf12 Aug 2024
Other - LegalFile: 0776_001.pdf12 Aug 2024
Other - TechnicalFile: 0776_001.pdf12 Aug 2024
Other - TechnicalFile: 0777_001.pdf12 Aug 2024
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (23).pdf8 Aug 2024
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development (5) (1).pdf8 Aug 2024
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (23).pdf8 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (5) (1).pdf8 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (9).pdf8 Aug 2024
Other - LegalFile: माणकोली_60_1_Satbara.pdf8 Aug 2024
Other - LegalFile: माणकोली_60_2_Satbara.pdf8 Aug 2024
Other - LegalFile: Form B_0702_001_merged_removed.pdf8 Aug 2024
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter -UT MLCP.pdf7 Aug 2024
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement Final.pdf7 Aug 2024
Building plan approvalFile: Sheet 21 (1) - converted (1).pdf27 Jul 2024
Copy of the legal title reportFile: Legal Report on Title_Mankoli Land_MLCP Retails_compressed Final.pdf27 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 21 (1) - converted (1).pdf27 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_merged_removed.pdf27 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf27 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf27 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Decla-Final.pdf27 Jul 2024
Layout approvalFile: slide-1 - converted (3).pdf26 Jul 2024
Layout approvalFile: slide -3 - converted.pdf26 Jul 2024
Layout approvalFile: slide-4 - converted.pdf26 Jul 2024
Layout approvalFile: slide-4 - converted.pdf26 Jul 2024
Copy of Layout Approval (in case of layout)File: slide-1 - converted (3).pdf26 Jul 2024
Copy of Layout Approval (in case of layout)File: slide -3 - converted.pdf26 Jul 2024
Copy of Layout Approval (in case of layout)File: slide-4 - converted.pdf26 Jul 2024
Copy of Layout Approval (in case of layout)File: slide-4 - converted.pdf26 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: New CC2607.pdf26 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Final.pdf26 Jul 2024
Other - LegalFile: 1 Other - Legal (6).pdf26 Jul 2024
Other - LegalFile: 2 Other - Legal (3).pdf26 Jul 2024
CERSAI detailsFile: CERSAI_Search_Report_200314806479_For_Asset_Based_Search_25_07_2024_14_53_54_377.pdf25 Jul 2024
CERSAI detailsFile: Cersai.pdf25 Jul 2024
Details of encumbrances concerned to FinanceFile: Finance Encumb.pdf24 Jul 2024
Details of encumbrances concerned to FinanceFile: Legal Litigation.pdf24 Jul 2024
Details of encumbrances concerned to LegalFile: Finance Encumb.pdf24 Jul 2024
Details of encumbrances concerned to LegalFile: Legal Litigation.pdf24 Jul 2024
Declaration in FORM BFile: Form B.pdf24 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Secured.pdf24 Jul 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (13).pdf24 Jul 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (11).pdf24 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Declaration.pdf24 Jul 2024
Other - TechnicalFile: Order 50.pdf24 Jul 2024
PAN CardFile: 1 PAN Card (6).pdf22 Jul 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Liana BP51700033964Dombivali, ThaneMar 2022CompletedFeb 2026Jun 2024

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Upper Thane-MLCP C Shops on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mankoli7,600+ in Thane

Builder: Macrotech Developers Limited

Macrotech Developers Limited has 141 registrations on MahaRERA, including LODHA BELMONDO ASHBRIDGE D, E and LODHA BELMONDO AUGUSTA B. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Upper Thane-MLCP C Shops is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Upper Thane-MLCP C Shops?

The registered promoter entity is Macrotech Developers Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Upper Thane-MLCP C Shops?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Upper Thane-MLCP C Shops?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Upper Thane-MLCP C Shops?

The professionals named in the filing: Architect: Vilas Desai & Associate; Architect: VINI VILAS DESAI; Engineer: K C Shah Consultants; Engineer: MEHUL KAIVANT SHAH; Engineer: Rahul Dhanawade; Chartered Accountant: Chirag Sarvaiya & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Upper Thane-MLCP C Shops?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Upper Thane-MLCP C Shops. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Upper Thane-MLCP C Shops to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.