Home / Browse projects / Pune, Maharashtra / UP-LIFE - PHASE - 6 - F - MAGENTA

Registered No litigation declared Residential / Group Housing project

UP-LIFE - PHASE - 6 - F - MAGENTA

By AVIOR SHELTERS LLP

RG-MH-16076 · RERA P52100024759 · Last updated on MahaRERA portal: 7 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 1 extension taken
  • Rs 23.00 crore secured on the land, in favour of Subhash Vitthal Pakhare and Others

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 48 months from the original
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 88%
11 of 75Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

UP-LIFE - PHASE - 6 - F - MAGENTA is a Residential / Group Housing project by AVIOR SHELTERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100024759 on 2 Mar 2020. Possession is promised by 31 Dec 2029. The completion date has moved by 48 months from the original filing. 64 of the 75 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameUP-LIFE - PHASE - 6 - F - MAGENTA
  • TypeResidential / Group Housing
  • Location
    • -
    • Uravade
    • Mulshi
    • Pune
    • 412108
  • Pincode412108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024759
  • ReraGenie IDRG-MH-16076

Builder

  • NameAVIOR SHELTERS LLP
  • Entity typePartnership
  • GSTIN27AAIFC4711C1ZW
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersAvior Enterprises LLP through Sunil Somani, Anand Sunil Somani, Gazibo Venture LLP Through Dilip Mehta, Sagar Dilip Mehta
  • Other registrations5 more →
  • No longer live3 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2020First promiseDec 2025Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Mar 2020
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 30 Dec 2025)
  • Buildings1 building record
  • Documents filed123 files

Current status

85%64 of 75 units booked
46.6%Work done, per cost certificate

Figures as on 7 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING - FNA9675075

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 88%.

BUILDING - F: 27% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure88%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership3

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area763 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared present
Charge in favour ofSubhash Vitthal Pakhare and Others
Secured amountRs 23.00 crore
CERSAI search filedYes
Declared on26 Jun 2025
LandownerVillageDistrict
SUBHASH PAKHAREUravadePune
NAMDEV PAKHAREUravadePune
GENUBHAU PAKHAREUravadePune

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGION DEVELOPMENT AUTHORITY, PUNE
Permissible FSI4373.94
Proposed, not sanctioned4,374 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 62, SAHAKAR NAGAR, PUNE - 411009
Estimated costRs 12.74 cr
Cost incurredRs 5.94 cr
Work done46.64%
BuildingWingEstimatedIncurred
BUILDING - FNARs 11.49 crRs 5.82 cr
-NARs 1.24 crRs 12.44 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpiro Architects
EngineerVinod Kathare
EngineerChandrakant Deshpande
EngineerKashinath Dhanve
Chartered AccountantPriyanka Chordiya And Associates
Chartered AccountantSAC & CO LLP
PartnerRole in project
AVIOR SHELTERS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA02082502285Dec 2025 → Dec 2029

Reason as filed by the promoterThe Project is under Construction and nearly 40% work is done. We are trying our best to complete balance project within the revised timeline. That's why the project extension is required up to 31/12/2029.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A Phase 6.pdf7 Aug 2026
Withdrawal Update Form 1File: Form 1 Ph 6 30062026 SIGN.pdf28 Jul 2026
Withdrawal Update Form 2File: From 2 30626.pdf28 Jul 2026
Withdrawal Update Form 3File: Form 3 Mageneta TB Ph6 30062026 sign_compressed.pdf28 Jul 2026
Withdrawal Update Form 1File: ASLLP - Form 1 - MAGENTA PHASE-6.pdf1 Jun 2026
Withdrawal Update Form 2File: Form 2 Phase 6 sign_compressed.pdf1 Jun 2026
Withdrawal Update Form 3File: Form 3 Mageneta TB Ph6 31032026 sign_compressed.pdf1 Jun 2026
Withdrawal Update Form 1File: form 1.pdf16 Feb 2026
Withdrawal Update Form 1File: ASLLP - Dec 25 - Form 1 - Ph 6.pdf16 Feb 2026
Withdrawal Update Form 2File: ASLLP - Form 2 - Magenta - Phase 6 - Q3_new.pdf16 Feb 2026
Withdrawal Update Form 2File: ASLLP - Dec 25 - Form 2 - Ph 6_new.pdf16 Feb 2026
Withdrawal Update Form 3File: Form 3 Mageneta TB Ph6 30092025 sign_compressed.pdf16 Feb 2026
Withdrawal Update Form 3File: Form 3 Mageneta TB Ph6 31122025 sign_compressed.pdf16 Feb 2026
Form 5 (FY 2024-2025)File: Form 5_Mageneta Ph 6_FY 2024-2025 sign_compressed.pdf26 Dec 2025
Withdrawal Update Form 1File: Form 1 - MAGENTA - Jun 2025.pdf5 Aug 2025
Withdrawal Update Form 2File: Form 2 - MAGENTA - Jun 2025.pdf5 Aug 2025
Withdrawal Update Form 3File: Form 3 Mageneta - Jun 2025 - New.pdf5 Aug 2025
Form 1File: FORM 1 PH 6 MAGENTA - Mar 25.pdf26 Jun 2025
Form 2File: FORM 2 PH 6 MAGENTA - Mar 25.pdf26 Jun 2025
Form 3File: FORM 3 PH 6 MAGENTA - Mar 25.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: DIS - PH 6 MAGENTA - Mar 25.pdf26 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A - Uplife - Magenta - Mar 25.pdf16 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ph-6-Magenta - Dec 24.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ph-6 -MAGENTA - Dec 24.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Ph-6-MAGENTA-Dec 24.pdf4 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure - PH-6- Magenta - Dec 24.pdf4 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Magenta - 2023 - 2024.pdf25 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ph-6-Magenta - Sept 24.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ph-6 -MAGENTA - Sept 24.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Ph-6-MAGENTA-Sept 24.pdf21 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure - PH-6- Magenta - Sept 24.pdf21 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ph-6-Magenta - Jun 24.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ph-6 -MAGENTA - Jun 24.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure - PH-6- Magenta - Jun 24.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ph-6 -MAGENTA - Jun 24.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ph-5-Ivory - Mar 24.pdf3 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ph-5-Ivory - Mar 24.pdf3 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Uplife-Ph-5 Ivory - Mar 24.pdf3 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure PH-5- Ivory - Mar 24.pdf3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ph-5-Ivory -Mar 24.pdf3 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Majenta - Dec 23.pdf15 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Ph-6-Magenta - Dec 23_compressed.pdf15 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Ph-6-Magenta- Dec 23.pdf15 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure PH-6- Magenta - Dec 23.pdf15 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ph-6-Magenta -Dec 23_compressed.pdf15 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Magenta - Ph-6 - Jun 23.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Magenta - Ph-6 - Sept 23.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - MAGENTA - Ph-6 - Jun 23.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - MAGENTA Ph -6- Sept 23.pdf18 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Magenta - Ph-6 - Jun 23.pdf18 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Magenta - Ph-6 - Sept 23.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure - Magenta - PH-6 - Jun 23.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure - Magenta - PH-6 - Sept 23.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - MAGENTA - Ph-6 - Jun 23_compressed.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - MAGENTA- Ph-6 - Sept 23_compressed.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Magenta 31 Mar 2023.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - MAGENTA - Mar 23.pdf29 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Uplife Phase 6 Magenta - Mar-2023.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure PH-6- Magenta - Mar 23.pdf29 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - MAGENTA - Mar 23.pdf29 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Uplife Phase 6 Magenta - 2022-2023.pdf29 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Magenta 30 Jun 2022.pdf27 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Magenta 30 Sep 2022.pdf27 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Magenta 31 Dec 2022.pdf27 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - MAGENTA - Jun 22.pdf27 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - MAGENTA - Sept 22.pdf27 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - MAGENTA - Dec 22.pdf27 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Uplife Phase 6 Magenta - Jun-2022.pdf27 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Uplife Phase 6 Magenta - Sep-2022.pdf27 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Uplife Phase 6 Magenta - Dec-2022.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure PH-6- Magenta - Jun 22.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure PH-6- Magenta - Sept 22.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure PH-6- Magenta - Dec 22.pdf27 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -MAGENTA - Jun 22.pdf27 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - MAGENTA - Sept 22.pdf27 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - MAGENTA - Dec 22.pdf27 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Magenta 31 Dec 2021.pdf30 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Magenta 31 Mar 2022.pdf30 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Engineer Certificate-Magenta-Mar-22.pdf30 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Uplife Phase 6 Magenta - Mar-2022.pdf30 Mar 2023

How this compares with Pune

85%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UP-LIFE - PHASE - 6 - F - MAGENTA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -13,700+ in Pune

2 kmUP-LIFE - PHASE - 6 - F Completed 5Lapsed / revoked 9Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: AVIOR SHELTERS LLP

AVIOR SHELTERS LLP has 6 registrations on MahaRERA, including UP-LIFE-PHASE-1-VERONICA and UP-LIFE-PHASE-2-EMERALD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if UP-LIFE - PHASE - 6 - F - MAGENTA is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UP-LIFE - PHASE - 6 - F - MAGENTA?

The registered promoter entity is AVIOR SHELTERS LLP, a partnership as per the filing. Its GSTIN 27AAIFC4711C1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UP-LIFE - PHASE - 6 - F - MAGENTA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for UP-LIFE - PHASE - 6 - F - MAGENTA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UP-LIFE - PHASE - 6 - F - MAGENTA?

The professionals named in the filing: Architect: Spiro Architects; Engineer: Vinod Kathare; Engineer: Chandrakant Deshpande; Engineer: Kashinath Dhanve; Chartered Accountant: Priyanka Chordiya And Associates; Chartered Accountant: SAC & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UP-LIFE - PHASE - 6 - F - MAGENTA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UP-LIFE - PHASE - 6 - F - MAGENTA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UP-LIFE - PHASE - 6 - F - MAGENTA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.