ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / UP-LIFE-PHASE-4-LAVENDER

Registration lapsed No litigation declared Residential / Group Housing project

UP-LIFE-PHASE-4-LAVENDER

By AVIOR SHELTERS LLP

RG-MH-16083 · RERA P52100024849 · Last updated on MahaRERA portal: 23 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Rs 23.00 crore secured on the land, in favour of AVIOR SHELTERS LLP

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
4 of 11Construction stages donefurthest along: Staircases, 90%
1 of 1Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 120 documents Report an error

UP-LIFE-PHASE-4-LAVENDER is a Residential / Group Housing project by AVIOR SHELTERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100024849 on 9 Mar 2020. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 0 of the 1 unit on this registration is recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameUP-LIFE-PHASE-4-LAVENDER
  • TypeResidential / Group Housing
  • Location
    • -
    • Uravade
    • Mulshi
    • Pune
    • 412108
  • Pincode412108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024849
  • ReraGenie IDRG-MH-16083

Builder

  • NameAVIOR SHELTERS LLP
  • Entity typePartnership
  • GSTIN27AAIFC4711C1ZW
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersAvior Enterprises LLP through Sunil Somani, Anand Sunil Somani, Gazibo Venture LLP Through Dilip Mehta, Sagar Dilip Mehta
  • Other registrations5 more →
  • No longer live3 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredMar 2020PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Mar 2020
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed120 files

Current status

0%0 of 1 units booked
85.8%Work done, per cost certificate

Figures as on 23 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING -A-01, A-02, A-03, A1-01, A1-02, A1-03, A1-04, A2-01, A2-02NA44101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

BUILDING -A-01, A-02, A-03, A1-01, A1-02, A1-03, A1-04, A2-01, A2-02: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises88%
Sanitary Fittings within the flats / premises56%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 23 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes20%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes20%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership3

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,662 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared present
Charge in favour ofAVIOR SHELTERS LLP
Secured amountRs 23.00 crore
CERSAI search filedYes
Declared on22 Jan 2026
LandownerVillageDistrict
SUBHASH PAKHAREUravadePune
NAMDEV PAKHAREUravadePune
GENUBHAU PAKHAREUravadePune

Approvals and building plan

Sanctioning authorityPIUNE METROPOLITAN REGION DEVELOPMENT AUTHORITY PUNE
Permissible FSI3449.5
Proposed, not sanctioned3,450 sq m
Buildings approved9
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBIBWEWADI PUNE
Estimated costRs 11.82 cr
Cost incurredRs 10.14 cr
Work done85.79%
BuildingWingEstimatedIncurred
BUILDING -A-01, A-02, A-03, A1-01, A1-02, A1-03, A1-04, A2-01, A2-02NARs 10.02 crRs 8.61 cr
-NARs 1.80 crRs 1.53 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpiro Architects
EngineerKASHINATH DHANAVE
EngineerChandrakant Deshpande
Chartered AccountantSAC & CO LLP
Chartered AccountantPRIYANKA CHORDIYA AND ASSOCIATES
PartnerRole in project
AVIOR SHELTERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed120

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: PH IV LAVENDER ARCHITECT CERTIFICATE.pdf23 Jan 2026
Withdrawal Update Form 1File: ASLLP - Dec 25 - Form 1 - Ph 4.pdf23 Jan 2026
Withdrawal Update Form 2File: ASLLP - Form 2 - Lavender - Phase 4 - Q3.pdf23 Jan 2026
Withdrawal Update Form 2File: ASLLP - Dec 25 - Form 2 - Ph 4.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3 Lavender CC Ph4 30092025 sign_compressed.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3 Lavender Ph4 31122025-sign copy_compressed.pdf23 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A - Lavender - Mar 25.pdf23 Jan 2026
Form 5 (FY 2024-2025)File: Form 5_Lavender ph 4_FY 2024-2025 sign_compressed.pdf23 Jan 2026
Form 1File: Form 1 - LAVENDER - Jun 2025.pdf30 Jul 2025
Form 2File: Form 2 - LAVENDER - Jun 2025.pdf30 Jul 2025
Form 3File: FORM 3 - LAVENDER - JUN 2025.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - Lavender - Jun 2025.pdf30 Jul 2025
Form 1File: FORM 1 PH 4 LAVENDER - Mar 25.pdf26 Jun 2025
Form 2File: FORM 2 PH 4 LAVENDER - Mar 25.pdf26 Jun 2025
Form 3File: FORM 3 PH 4 LAVENDER - Mar 25.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: DIS - PH 4 LAVENDER - Mar 25.pdf26 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Ph-4-Lavender-Dec 24.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Ph-4-Lavender-Dec 24.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Ph-4-Lavender-Dec 24.pdf4 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure Ph-4- Lavender - Dec 24.pdf4 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Lavender - 2023 -2024.pdf25 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Ph-4-Lavender-Sept 24.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Ph-4-Lavender-Sept 24.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Ph-4-Lavender-Sept 24.pdf21 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure Ph-4- Lavender - Sept 24.pdf21 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ph-4- Lavender - Jun 24.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Ph-4- Lavender - Jun 24.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure Ph-4- Lavender - Jun 24.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ph-4- Lavender - Jun 24.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ph-4-Lavender - Mar 24.pdf3 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ph-4-Lavender - Mar 24.pdf3 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Uplife-Ph-4 Lavender - Mar 24.pdf3 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure PH-4- Lavender - Mar 24.pdf3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ph-4-Lavender -Mar 24.pdf3 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lavender - Dec 23.pdf15 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Ph-4-Lavender - Dec 23_compressed.pdf15 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Ph-4-Lavender- Dec 23.pdf15 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure PH-4- Lavender - Dec 23.pdf15 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ph-4-Lavender -Dec 23_compressed.pdf15 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lavender - Jun 23.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lavender - Sept 23.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - LAVENDER - Jun 23.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - LAVENDER - Sept 23.pdf18 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Lavender - Jun 23.pdf18 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Lavender - Sept 23.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure PH-4- Lavender - Jun 23.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure PH-4- Lavender - Sept 23.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - LAVENDER - Jun 23_compressed.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - LAVENDER - Sept 23_compressed.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Lavender 31 Mar 2023.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - LAVENDER - Mar 23.pdf29 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Lavender - Mar 23.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure PH-4- Lavender - Mar 23.pdf29 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - LAVENDER - Mar 23.pdf29 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Uplife Phase 4 Lavender - 2022-2023.pdf29 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Lavender 30 Jun 2022.pdf27 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Lavender 30 Sep 2022.pdf27 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Lavender 31 Dec 2022.pdf27 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - LAVENDER - Jun 22.pdf27 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - LAVENDER - Sept 22.pdf27 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - LAVENDER - Dec 22.pdf27 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Lavender - Jun 22.pdf27 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Lavender - Sept 22.pdf27 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Lavender - Dec 22.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure PH-4- Lavender - Jun 22.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure PH-4- Lavender - Sept 22.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure PH-4- Lavender - Dec 22.pdf27 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - LAVENDER - Jun 22.pdf27 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - LAVENDER - Sept 22.pdf27 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - LAVENDER - Dec 22.pdf27 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Lavender 31 Dec 2021.pdf30 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Lavender 31 Mar 2022.pdf30 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Engineer Certificate-Lavender-Mar-22.pdf30 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Uplife Phase 4 Lavender - Mar-2022.pdf30 Mar 2023
Disclosure of sold/ booked inventoryFile: Disclosure - Lavender Mar 22.pdf30 Mar 2023
CERSAI detailsFile: CERSAI_Search_Report.pdf30 Mar 2023
CERSAI detailsFile: CERSAI_Search_Report_SBI.pdf30 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Lavender -Mar -22.pdf30 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Lavender - 21-22.pdf30 Mar 2023
Declaration about Commencement CertificateFile: Lavender - Delcaration about CC.pdf20 Mar 2023

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UP-LIFE-PHASE-4-LAVENDER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -13,700+ in Pune

2 kmUP-LIFE-PHASE-4-LAVENDERCompleted 5Lapsed / revoked 8Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: AVIOR SHELTERS LLP

AVIOR SHELTERS LLP has 6 registrations on MahaRERA, including UP-LIFE-PHASE-1-VERONICA and UP-LIFE-PHASE-2-EMERALD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that UP-LIFE-PHASE-4-LAVENDER shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if UP-LIFE-PHASE-4-LAVENDER is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UP-LIFE-PHASE-4-LAVENDER?

The registered promoter entity is AVIOR SHELTERS LLP, a partnership as per the filing. Its GSTIN 27AAIFC4711C1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UP-LIFE-PHASE-4-LAVENDER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for UP-LIFE-PHASE-4-LAVENDER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UP-LIFE-PHASE-4-LAVENDER?

The professionals named in the filing: Architect: Spiro Architects; Engineer: KASHINATH DHANAVE; Engineer: Chandrakant Deshpande; Chartered Accountant: SAC & CO LLP; Chartered Accountant: PRIYANKA CHORDIYA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UP-LIFE-PHASE-4-LAVENDER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UP-LIFE-PHASE-4-LAVENDER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UP-LIFE-PHASE-4-LAVENDER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.