Home / Browse projects / Pune, Maharashtra / UP-LIFE-PHASE-3-SAPPHIRE
UP-LIFE-PHASE-3-SAPPHIRE
RG-MH-16082 · RERA P52100024824 · Last updated on MahaRERA portal: 30 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Rs 23.00 crore secured on the land, in favour of Subhash Vitthal Pakhare and others
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
UP-LIFE-PHASE-3-SAPPHIRE is a Residential / Group Housing project by AVIOR SHELTERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100024824 on 9 Mar 2020. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 7 of the 64 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.
At a glance
Project
- NameUP-LIFE-PHASE-3-SAPPHIRE
- TypeResidential / Group Housing
- Location
- -
- Uravade
- Mulshi
- Pune
- 412108
- Pincode412108
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100024824
- ReraGenie IDRG-MH-16082
Builder
- NameAVIOR SHELTERS LLP
- Entity typePartnership
- GSTIN27AAIFC4711C1ZW
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersAvior Enterprises LLP through Sunil Somani, Anand Sunil Somani, Gazibo Venture LLP Through Dilip Mehta, Sagar Dilip Mehta
- Other registrations5 more →
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Mar 2020
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed115 files
Current status
Figures as on 30 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING -R1 | NA | 5 | 4 | 64 | 0 | 64 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
BUILDING -R1: 9% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed34
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| SUBHASH PAKHARE | Uravade | Pune |
| NAMDEV PAKHARE | Uravade | Pune |
| GENUBHAU PAKHARE | Uravade | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING -R1 | NA | Rs 20.10 cr | Rs 2.52 cr |
| - | NA | Rs 3.16 cr | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SPIRO DESIGNS - - |
| Engineer | Kashinath Vishwanath Dhanave |
| Engineer | NILESH AVINASH SHETE |
| Engineer | Vinod Kathare |
| Engineer | Chandrakant Deshpande |
| Chartered Accountant | PRIYANKA CHORDIYA AND ASSOCIATES |
| Chartered Accountant | SAC & CO LLP |
| Partner | Role in project |
|---|---|
| AVIOR SHELTERS LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Feb 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Oct 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Feb 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed115
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: PH III SAPPHIRE ARCHITECT CERTIFICATE.pdf | 30 Dec 2025 |
| Withdrawal Update Form 2File: ASLLP - Form 2 - Sapphire - Phase 3 - Q3.pdf | 30 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 Sapphire Ph3 30092025 sign_compressed.pdf | 30 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5_Sapphire ph 3 FY 2024-2025 sign_compressed.pdf | 26 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 - SAPPHIRE - Jun 2025.pdf | 5 Aug 2025 |
| Withdrawal Update Form 2File: FORM 3 - SAPPHIRE - JUN 2025.pdf | 5 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 Sapphire - Jun 2025 - New.pdf | 5 Aug 2025 |
| Form 1File: FORM 1 PH 3 SAPPHIRE - Mar 25.pdf | 26 Jun 2025 |
| Form 2File: FORM 2 PH 3 SAPPHIRE - Mar 25.pdf | 26 Jun 2025 |
| Form 3File: FORM 3 PH 3 SAPPHIRE - Mar 25.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DIS - PH 3 SAPPHIRE - Mar 25.pdf | 26 Jun 2025 |
| Form 2A (FY 2024-2025)File: Form 2A - Uplife - Sapphire - Mar 25.pdf | 16 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Ph-3-Sapphire-Dec 24.pdf | 4 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ph-3- Sapphire - Dec 24.pdf | 4 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Ph-3-Sapphire-Dec 24.pdf | 4 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure - Ph-3- Sapphire - Dec 24.pdf | 4 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Sapphire - 2023 - 2024.pdf | 25 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Ph-3-Sapphire-Sept 24.pdf | 21 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ph-3- Sapphire - Sept 24.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Ph-3-Sapphire-Sept 24.pdf | 21 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure - Ph-3- Sapphire - Sept 24.pdf | 21 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ph-3- Sapphire - Jun 24.pdf | 3 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ph-3- Sapphire - Jun 24.pdf | 3 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure - Ph-3- Sapphire - Jun 24.pdf | 3 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ph-3- Sapphire - Jun 24.pdf | 3 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ph-2-Emrald - Mar 24.pdf | 3 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ph-3-Sapphire - Mar 24.pdf | 3 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ph-3-Saphhire - Mar 24.pdf | 3 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Uplife-Ph-3 Sapphire - Mar 24.pdf | 3 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure PH-3- Sapphire - Mar 24.pdf | 3 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ph-3-Saphhire -Mar 24.pdf | 3 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sapphire - Dec 23.pdf | 15 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Ph-3-Saphhire - Dec 23_compressed.pdf | 15 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Ph-3-Sapphire- Dec 23.pdf | 15 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure PH-3- Sapphire - Dec 23.pdf | 15 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ph-3-Saphhire -Dec 23_compressed.pdf | 15 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sapphire - Jun 23.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sapphire - Sept 23.pdf | 18 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - SAPPHIRE - Jun 23.pdf | 18 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - SAPPHIRE - Sept 23.pdf | 18 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Sapphire - Jun 23.pdf | 18 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Sapphire - Sept 23.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure PH-3- Sapphire - Jun 23.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure PH-3- Sapphire - Sept 23.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - SAPPHIRE - Jun 23_compressed.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - SAPPHIRE - Sept 23_compressed.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Sapphiore 31 Mar 2023.pdf | 29 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - SAPPHIRE - Mar 23.pdf | 29 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Uplife Phase 3 Sapphire - Mar-2023.pdf | 29 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure PH-3- Sapphire - Mar 23.pdf | 29 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - SAPPHIRE - Mar 23.pdf | 29 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Uplife Phase 3 Sapphire - 2022-2023.pdf | 29 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Sapphire 30 Jun 2022.pdf | 27 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Sapphiore 30 Sep 2022.pdf | 27 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Sapphiore 31 Dec 2022.pdf | 27 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - SAPPHIRE - Jun 22.pdf | 27 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - SAPPHIRE - Sept 22.pdf | 27 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - SAPPHIRE - Dec 22.pdf | 27 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Uplife Phase 3 Sapphire - Jun-2022.pdf | 27 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Uplife Phase 3 Sapphire - Sep-2022.pdf | 27 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Uplife Phase 3 Sapphire - Dec-2022.pdf | 27 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure PH-3- Sapphire -Jun 22.pdf | 27 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure PH-3- Sapphire - Sept 22.pdf | 27 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure PH-3- Sapphire - Dec 22.pdf | 27 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - SAPPHIRE - Jun 22.pdf | 27 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - SAPPHIRE - Sept 22.pdf | 27 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - SAPPHIRE - Dec 22.pdf | 27 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Sapphire 31 Dec 2021.pdf | 30 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Uplife Sapphire 31 Mar 2022.pdf | 30 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Engineer Certificate-Sapphire-Mar-22.pdf | 30 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Uplife Phase 3 Sapphire - Mar-2022.pdf | 30 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure - Sapphire -Mar - 22.pdf | 30 Mar 2023 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 30 Mar 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_SBI.pdf | 30 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sapphire -Mar - 22.pdf | 30 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Sapphire - 21-22.pdf | 30 Mar 2023 |
| Declaration about Commencement CertificateFile: Sapphire - Declaration about CC.pdf | 20 Mar 2023 |
| Details of encumbrancesFile: Fullerton Enkumbarnce Certificate.pdf | 15 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Sapphire Phase - 3 Separate Bank Account.pdf | 3 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A Certificate - Sapphire - June 2021.pdf | 24 Jan 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 115 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep UP-LIFE-PHASE-3-SAPPHIRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near -13,700+ in Pune
Filed coordinates, straight-line distance. 18 registered projects within 2 km.
BUILDING - D- WING -D-1- NAVYANGAN PHASE - II
AVIOR MERLIN VENTURE LLP
BUILDING D - WING D-2 - NAVYANGAN PHASE - II
M/S. AVIOR MERLIN VENTURE LLP
HILLS N MILLS
ICONSTRUCT PRIVATE LIMITED
Sparsh Aster
Shree Enterprises
BUILDING NO. B1 - NAVYANGAN PHASE - II
AVIOR MERLIN VENTURE LLP
VANALIKA - PARADISE - PHASE - III-3A
M/S. AVIOR MAJESTIQUE PROPERTIES
Builder: AVIOR SHELTERS LLP
AVIOR SHELTERS LLP has 6 registrations on MahaRERA, including UP-LIFE-PHASE-1-VERONICA and UP-LIFE-PHASE-2-EMERALD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that UP-LIFE-PHASE-3-SAPPHIRE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if UP-LIFE-PHASE-3-SAPPHIRE is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of UP-LIFE-PHASE-3-SAPPHIRE?
The registered promoter entity is AVIOR SHELTERS LLP, a partnership as per the filing. Its GSTIN 27AAIFC4711C1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in UP-LIFE-PHASE-3-SAPPHIRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for UP-LIFE-PHASE-3-SAPPHIRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at UP-LIFE-PHASE-3-SAPPHIRE?
The professionals named in the filing: Architect: SPIRO DESIGNS - -; Engineer: Kashinath Vishwanath Dhanave; Engineer: NILESH AVINASH SHETE; Engineer: Vinod Kathare; Engineer: Chandrakant Deshpande; Chartered Accountant: PRIYANKA CHORDIYA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in UP-LIFE-PHASE-3-SAPPHIRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback