ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / UNITY PARK

Registered No litigation declared Residential / Group Housing project

UNITY PARK

By SHRIRAM VISION

RG-MH-96397 · RERA P52100051156 · Last updated on MahaRERA portal: 30 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 30%
31 of 39Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

UNITY PARK is a Residential / Group Housing project by SHRIRAM VISION in Pune, Maharashtra, registered with MahaRERA as P52100051156 on 1 Jun 2023. Possession is promised by 31 Dec 2026. 8 of the 39 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameUNITY PARK
  • TypeResidential / Group Housing
  • Location
    • Mumbai Pune Road
    • Kasarwadi
    • Bhosari
    • Haveli
    • Pune
    • 411034
  • Pincode411034
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051156
  • ReraGenie IDRG-MH-96397

Builder

  • NameSHRIRAM VISION
  • Entity typePartnership
  • PartnersAbdul Aziz U Mulla, Jameelmiya Khajasab Patel, Mahadev Narayan Kawade, Santosh Namdevrao Pawar

Key dates

this monthRegisteredJun 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Jun 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed58 files

Current status

21%8 of 39 units booked
8.6%Work done, per cost certificate

Figures as on 30 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING BNA9021021
WING CNA9018018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 30%.

WING B42%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C42%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed55

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots55
Closed/Covered55
BuildingClosed/CoveredTotal
WING B2626
WING C2929

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,094 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2024
LandownerVillageDistrict
Dagadu Maruti LandeBhosariPune
Pratik Shankarrao ZumbareBhosariPune
Shantanu Shankar KurkuteBhosariPune
Shakuntala Bhimrao LandeBhosariPune
Balasaheb Kondiba LandeBhosariPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI4185.34
Proposed, not sanctioned2,685 sq m
Buildings approved3
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTirupati Kashiganga, Dhanori Pune 411015
Estimated costRs 7.90 cr
Cost incurredRs 68.02 lakh
Work done8.61%
BuildingWingEstimatedIncurred
WING BNARs 4.00 crRs 40.81 lakh
WING CNARs 3.50 crRs 27.21 lakh
-NARs 40.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR K Associates
EngineerYaser Rahman Shaikh
Chartered AccountantKishor Mavkar & Associates
Chartered AccountantVinod Dongare
PartnerRole in project
SHRIRAM VISION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 FY 2024-25 Q4.pdf30 Sep 2025
Form 2File: FORM 2 FY 2024-25 Q4.pdf30 Sep 2025
Form 3File: FORM 3 FY 2024-25 Q4.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf30 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shriram Form 1 23-24 Q4.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shriram Form 2 23-24 Q4.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shriram Form 3.pdf6 Oct 2024
Disclosure of sold/ booked inventoryFile: Shriram Inventory 23-24 Q4.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - SHRIRAM VISION.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shriram Form 1 23-24 Q4.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shriram Form 2 23-24 Q4.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shriram Form 3.pdf6 Oct 2024
Disclosure of sold/ booked inventoryFile: Shriram Inventory 23-24 Q4.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - SHRIRAM VISION.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shriram Form 1 23-24 Q4.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shriram Form 2 23-24 Q4.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shriram Form 3.pdf6 Oct 2024
Disclosure of sold/ booked inventoryFile: Shriram Inventory 23-24 Q4.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - SHRIRAM VISION.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shriram Form 1 23-24 Q4.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shriram Form 3.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shriram Form 2 23-24 Q4.pdf6 Oct 2024
Disclosure of sold/ booked inventoryFile: Shriram Inventory 23-24 Q4.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - SHRIRAM VISION.pdf6 Oct 2024
Form 5 (FY 2023-2024)File: FORM 5 - SHRIRAM VISION.pdf30 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHRIRAM VISION.pdf21 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER SHRIRAM VISION.pdf9 Nov 2023
Disclosure of sold/ booked inventoryFile: Inventory Shriram Vision.pdf9 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHRIRAM VISION.pdf9 Nov 2023
Details of encumbrances concerned to FinanceFile: declaration for encumbrance .pdf26 May 2023
Details of encumbrances concerned to LegalFile: declaration for encumbrance .pdf26 May 2023
CERSAI detailsFile: Declaration for no security interest .pdf26 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 SHRIRAM VISION.pdf24 May 2023
Deviation Report with respect to model copy of AgreementFile: 14 Deviation Report - Agreement to Sale.pdf18 Apr 2023
Layout approvalFile: 5 Sanction Plan 1.pdf16 Apr 2023
Building plan approvalFile: 5 Sanction Plan 1.pdf16 Apr 2023
Building plan approvalFile: 5 Sanction Plan 2.pdf16 Apr 2023
Building plan approvalFile: 5 Sanction Plan 3.pdf16 Apr 2023
Building plan approvalFile: 5 Sanction Plan 4.pdf16 Apr 2023
PAN CardFile: 1 PAN CARD SHRIRAM VISION.pdf16 Apr 2023
Copy of the legal title reportFile: 3 Title Report.pdf16 Apr 2023
Details of encumbrances concerned to FinanceFile: 4 a Declaration of Encumbrance.pdf16 Apr 2023
Details of encumbrances concerned to LegalFile: 4 a Declaration of Encumbrance.pdf16 Apr 2023
Copy of Layout Approval (in case of layout)File: 5 Sanction Plan 1.pdf16 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 5 Sanction Plan 1.pdf16 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 5 Sanction Plan 2.pdf16 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 5 Sanction Plan 3.pdf16 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 5 Sanction Plan 4.pdf16 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: 6 Commencement Certificate.pdf16 Apr 2023
Declaration about Commencement CertificateFile: 7 Commencement Declaration.pdf16 Apr 2023
Declaration in FORM BFile: 8 Declaration Form B.pdf16 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1 Architect Certificate.pdf16 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Form 2 Engineer Certificate.pdf16 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 16 Partner Interest Declaration.pdf16 Apr 2023
Proforma of Agreement for saleFile: 12 Agreement to Sale.pdf16 Apr 2023
Proforma of Allotment letterFile: 11 Allotment Letter.pdf16 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 15 RERA Bank Declaration.pdf16 Apr 2023
Deviation Report with respect to Allotment letterFile: 13 Deviation Report - Allotment.pdf16 Apr 2023

How this compares with Pune

21%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UNITY PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kasarwadi13,700+ in Pune

2 kmUNITY PARKCompleted 15Lapsed / revoked 15Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 49 registered projects within 2 km.

Builder: SHRIRAM VISION

SHRIRAM VISION has 1 registration on MahaRERA, including UNITY PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if UNITY PARK is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UNITY PARK?

The registered promoter entity is SHRIRAM VISION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UNITY PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for UNITY PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UNITY PARK?

The professionals named in the filing: Architect: R K Associates; Engineer: Yaser Rahman Shaikh; Chartered Accountant: Kishor Mavkar & Associates; Chartered Accountant: Vinod Dongare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UNITY PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UNITY PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UNITY PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.