Red flags

  • Litigation declared, 2 cases
  • 18 complaints at MahaRERA
  • Completion date moved by 60 months
  • 3 extensions taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 60 months from the original
10 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 80%
7 of 222Units unsoldnot recorded sold or booked
18Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

UNIQUE VISTAS-BLDG. NO. 3 is a Residential / Group Housing project by MADHU HARSHAD DOSHI in Thane, Maharashtra, registered with MahaRERA as P51700004406 on 9 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 60 months from the original filing. 215 of the 222 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 18 complaints are on record with the regulator.

At a glance

Project

  • NameUNIQUE VISTAS-BLDG. NO. 3
  • TypeResidential / Group Housing
  • Location
    • VILLAGE CHITALSAR
    • MANPADHA
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700004406
  • ReraGenie IDRG-MH-26633

Builder

  • NameMADHU HARSHAD DOSHI
  • Entity typeIndividual
  • Other registrations6 more →
  • Completed3 of 7
  • Past their filed date1

Key dates

this monthRegisteredAug 2017First promiseDec 2021Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2021)
  • Buildings1 building record
  • Documents filed84 files

Current status

97%215 of 222 units booked
74.6%Work done, per cost certificate

Figures as on 24 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UNIQUE VISTAS BLDG NO 3NA33292220222

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

UNIQUE VISTAS BLDG NO 3: 98% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes50%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes80%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area621 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on9 Sep 2025
LandownerVillageDistrict
KONKAN HOUSING AND AREA DEVELOPMENT BOARDThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI10725.3
Proposed, not sanctioned10,725 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchH-2, POONAM COMPLEX,89-93 CO-OP HSG SOCIETY,BLDG NO 92,SHANTI PARK, MIRA ROAD-EAST
Estimated costRs 161.73 cr
Cost incurredRs 120.72 cr
Work done74.64%
BuildingWingEstimatedIncurred
UNIQUE VISTAS BLDG NO 3NARs 144.91 crRs 116.59 cr
-NARs 16.82 crRs 4.13 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTEN FOLDS
EngineerELLORA PROJECT CONSULTANTS
Chartered AccountantAJAY SHAH
Chartered AccountantHITESH SHAH AND ASSOCIATES
PartnerRole in project
MADHU HARSHAD DOSHI-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700009599Dec 2021 → Dec 2024

Reason as filed by the promoterWE WOULD LIKE TO EXTEND THIS PROJECT AS THIS WAS A SLUM PROJECT SO TILL DATE WE HAVE BEEN FOCUSSING ON COMPLETION OF THE SLUM AND NOW WE WILL BE COMPLETING THE SALE BUILDING. WE HAVE SOLD ONLY FEW FLATS TILL DATE. WE KINDLY REQUEST YOU TO PLEASE EXTEND THE SAID BUILDING NO. 3 TILL 30TH DECEMBER 2024.

EA20052501192Dec 2021 → Dec 2025

Reason as filed by the promoterThe construction work of the said building is 95% completed till date. We hereby state that the area under the proposed DP road on the said plot has already been handed over to Thane Municipal Corporation vide indenture for transfer and registered on dated 31.10.2017 with subsequent Deed of rectification dated 07.02.2018. But till date the DP road work has not commenced yet by Thane Municipal Corporation. Further, there was a sudden intimation to us about a Thane-Borivali twin tunnel passing through our layout due to which a huge parcel of land had to be handed over which led to make necessary

EA09072621709Dec 2021 → Dec 2026

Reason as filed by the promoterThe construction of the said buildings has been completed, and we have obtained the Part Occupation Certificate comprising Lower Levels 1, 2 & 3 + Upper Stilt + 1st to 27th Floors of the said buildings vide Occupation Certificate No. OCC/N/7003/0016/2026 dated 11/05/2026, issued by the Thane Municipal Corporation. We hereby confirm and declare that we have already applied for the Full Occupation Certificate on 29.06.2026 for the remaining 28th to 29th Floors + 30th Recreational as soon as possible. We further state that, pursuant to the issuance of the aforesaid Part Occupation Certificate, we

Litigation declared2

CaseCourtStatus
667/2013THANE CIVIL COURT S DFor Hearing
7531/2012HIGH COURT BOMBAYADMITTED

Complaints filed with MahaRERA18

Case no.ComplainantRespondentFiled
CC12600025Siddhesh BhambidMADHU HARSHAD DOSHI02/01/2026
CC12503282Pawan Ravindra PawarMADHU HARSHAD DOSHI14/09/2025
CC12503283Pawan Ravindra PawarMADHU HARSHAD DOSHI14/09/2025
CC12503514Shubham Kishor LokhandeMADHU HARSHAD DOSHI01/10/2025
CC12504035Ramit Singh SethiMADHU HARSHAD DOSHI16/11/2025
CC12504192Aniket Subhash WaghavkarMADHU HARSHAD DOSHI26/11/2025
CC12602570Jayeshkumar Rajendraprasad GuptaMADHU HARSHAD DOSHI02/05/2026
CC12600348Sandesh Tukaram WamanMADHU HARSHAD DOSHI19/01/2026
CC12602630Parth KotechaMADHU HARSHAD DOSHI06/05/2026
CC12602273kishore suryabhanji shelkeMADHU HARSHAD DOSHI17/04/2026
CC12603923Akash PawarMADHU HARSHAD DOSHI25/06/2026
CC12602841Anil KhadseMADHU HARSHAD DOSHI14/05/2026
CC12602931Suhas Shankar VagguMADHU HARSHAD DOSHI18/05/2026
CC12603046Mayuresh Goraksh GangurdeMADHU HARSHAD DOSHI23/05/2026
CC12603061Mayur Ramchandra PatilMADHU HARSHAD DOSHI23/05/2026
CC12603582subhra dashMADHU HARSHAD DOSHI10/06/2026
CC12604115Shouryadeep MishraMADHU HARSHAD DOSHI01/07/2026
CC12605708Ninad Mohan GokhaleMADHU HARSHAD DOSHI02/09/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf24 Sep 2026
Withdrawal Update Form 1File: FORM 1.pdf24 Sep 2026
Withdrawal Update Form 2File: FORM 2.pdf24 Sep 2026
Withdrawal Update Form 2File: FORM 2.pdf24 Sep 2026
Withdrawal Update Form 3File: FORM 3.pdf24 Sep 2026
Withdrawal Update Form 3File: FORM 3.pdf24 Sep 2026
Form 5 (FY 2025-2026)File: FORM 5.pdf18 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf9 Jul 2026
Form 1File: Architect Certificate Bldg No 3.pdf2 Jul 2026
Form 2File: FORM 2.pdf2 Jul 2026
Form 3File: Unique Vista Rera Form 3 Bldg No 3 March 25.pdf2 Jul 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf2 Jul 2026
Withdrawal Update Form 1File: Form1 BLDG NO 3.pdf17 Jan 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf17 Jan 2026
Withdrawal Update Form 3File: SD MHADA BLDG NO 3 CA FORM 3 DEC 2025.pdf17 Jan 2026
Form 5 (FY 2024-2025)File: SD RERA FORM NO 5 BLDG NO 3.pdf24 Nov 2025
Withdrawal Update Form 1File: Form1 Building No 3.pdf29 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf29 Oct 2025
Withdrawal Update Form 3File: SD FORM 3 SEPT 2025 BLDG NO 3.pdf29 Oct 2025
Withdrawal Update Form 1File: FORM 1 Architect Certificate March 25.pdf16 Sep 2025
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE BLDG 3.pdf16 Sep 2025
Withdrawal Update Form 3File: Unique Vista Rera Form 3 Bldg No 3 March 25.pdf16 Sep 2025
Withdrawal Update Form 1File: FORM 1 Architect Certificate March 25.pdf9 Sep 2025
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE BLDG 3.pdf9 Sep 2025
Withdrawal Update Form 3File: Unique Vista Rera Form 3 Bldg No 3 March 25.pdf9 Sep 2025
Form 3File: FORM 3 CA CERTIFICATE BLDG 3 Q4 2018.pdf14 May 2025
Form 1File: FORM 3 CA CERTIFICATE BLDG 3 Q4 2018.pdf14 May 2025
Form 2File: FORM 3 CA CERTIFICATE BLDG 3 Q4 2018.pdf14 May 2025
Form 1File: FORM 3 CA CERTIFICATE BLDG 3 Q4 2018.pdf14 May 2025
Form 2File: FORM 3 CA CERTIFICATE BLDG 3 Q4 2018.pdf14 May 2025
Form 1File: FORM 3 CA CERTIFICATE BLDG 3 Q4 2018.pdf14 May 2025
Withdrawal Update Form 1File: FORM 1 Architect Certificate March 25.pdf14 May 2025
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE BLDG 3.pdf14 May 2025
Withdrawal Update Form 3File: Unique Vista Rera Form 3 Bldg No 3 March 25.pdf14 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf17 Apr 2025
Certificates of CA (Form 3)File: Unique Vista Rera Form 3 Bldg No 3 March 25.pdf17 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A march 2024.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A June 2024.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Sep 2024.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Dec 2024.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A March 2025.pdf17 Apr 2025
Certificates of CA (Form 3)File: FORM 3 BLDG 3 DEC 2024.pdf23 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineer Certificate.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf23 Jan 2025
Certificates of CA (Form 3)File: CA FORM 3 BLDG NO 3 NOV 24.pdf16 Jan 2025
Certificates of CA (Form 3)File: BLDG NO 3 CA CERTIFICATE.pdf16 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINNER CERTIFICATE BLDG NO 3 NOV 24.pdf16 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BLDG NO 03 ENGINEERS CERTIFICATE.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Rera Audit Form Bldg No 3.pdf8 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Bldg No 3.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY Bldg no 3.pdf24 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 BLDG NO 3 2023.pdf5 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Bldg No 3.pdf29 Dec 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY Bldg no 3.pdf13 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sale bldg 3.pdf11 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Bldg No 3 Rera Audit Form 5 March 2021.pdf11 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Bldg No 3 Rera Audit Form 5 March 2022.pdf11 Feb 2023
Declaration about Commencement CertificateFile: Declaration About CC Bldg 3.pdf29 Apr 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf29 Apr 2022
CERSAI detailsFile: CERSAI Search Report Shree Developers Cersai for Rera.pdf29 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: VISTAS_BLDG_3.pdf27 Aug 2021
Details of encumbrancesFile: No Encumberances Certificate.pdf13 Aug 2021
Proforma of Allotment letterFile: AGREEMENT FOR SALE bldg no 3.pdf13 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Unique_Vistas_Bldg_No_3_FORM_5_2019.pdf29 Jan 2020
Certificates of CA (Form 5)File: UNIQUE VISTAS BLDG NO 3.pdf15 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement CERTIFICATE 16112017.pdf30 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate SALE BLDG NO 3.pdf30 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE BLDG 3.pdf30 Mar 2018
Certificates of CA (Form 3)File: CA CERTIFICATE BLDG 3.pdf30 Mar 2018
Building plan approvalFile: 11 Commencement Certificate 10 06 2015.pdf29 Jul 2017
Layout approvalFile: 4 Copy of Layout Approval.pdf29 Jul 2017
PAN CardFile: 1 PAN CARD.pdf29 Jul 2017
Copy of the legal title reportFile: 2 TITLE CERTIFICATE D G Naik 8th Jan 2016.pdf29 Jul 2017
Details of encumbrancesFile: 3 Encumbrances Certificate.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 4 Copy of Layout Approval.pdf29 Jul 2017
Building Plan Approval (IOD)File: 11 Commencement Certificate 10 06 2015.pdf29 Jul 2017
Declaration in FORM BFile: 6 Form B Afficavit cum declaration.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 Architect Certificate Sale Bldg No 3.pdf29 Jul 2017

How this compares with Thane

97%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 60 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UNIQUE VISTAS-BLDG. NO. 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MANPADHA7,600+ in Thane

2 kmUNIQUE VISTAS-BLDG. NO. Completed 89Lapsed / revoked 13Other 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 158 registered projects within 2 km.

Builder: MADHU HARSHAD DOSHI

MADHU HARSHAD DOSHI has 7 registrations on MahaRERA, including UNIQUE VISTAS-BLDG. NO. 3 and UNIQUE VISTAS-BLDG. NO. 4. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if UNIQUE VISTAS-BLDG. NO. 3 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UNIQUE VISTAS-BLDG. NO. 3?

The registered promoter entity is MADHU HARSHAD DOSHI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UNIQUE VISTAS-BLDG. NO. 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against UNIQUE VISTAS-BLDG. NO. 3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for UNIQUE VISTAS-BLDG. NO. 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UNIQUE VISTAS-BLDG. NO. 3?

The professionals named in the filing: Architect: TEN FOLDS; Engineer: ELLORA PROJECT CONSULTANTS; Chartered Accountant: AJAY SHAH; Chartered Accountant: HITESH SHAH AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UNIQUE VISTAS-BLDG. NO. 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UNIQUE VISTAS-BLDG. NO. 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UNIQUE VISTAS-BLDG. NO. 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.