Home / Browse projects / Thane, Maharashtra / UNIQUE ESTATE TYPE-C WING D

Registered No litigation declared Residential / Group Housing project

UNIQUE ESTATE TYPE-C WING D

By SIDDHIVINAYAK DEVELOPERS

RG-MH-06803 · RERA P51700054119 · Last updated on MahaRERA portal: 20 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 45 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Internal walls, 65%
60 of 92Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

UNIQUE ESTATE TYPE-C WING D is a Residential / Group Housing project by SIDDHIVINAYAK DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700054119 on 27 Dec 2023. Possession is promised by 31 Mar 2027. 32 of the 92 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameUNIQUE ESTATE TYPE-C WING D
  • TypeResidential / Group Housing
  • Location
    • GODDEV
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700054119
  • ReraGenie IDRG-MH-06803

Builder

  • NameSIDDHIVINAYAK DEVELOPERS
  • Entity typePartnership
  • PartnersASHISH RAMAKANT KADAM, CHOGALAL LAXMANJI BHATI, JAYESH CHOGALAL BHATI, RAKESH CHOGALAL BHATI
  • Other registrations45 more →
  • Completed21 of 46
  • No longer live7 lapsed, de-registered or revoked
  • Declared earlier projects11 →

Key dates

this monthRegisteredDec 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Dec 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

35%32 of 92 units booked
53.3%Work done, per cost certificate

Figures as on 20 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UNIQUE ESTATE TYPE-C WING DNA252492092

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 65%.

UNIQUE ESTATE TYPE-C WING D: 44% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed115

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots115
Closed/Covered1
Open Space114

Land and ownership13

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,010 sq m
Land owned byThe promoter, with other names on the file
Named landowners13
LandownerVillageDistrict
SHRI PADMAKAR TULSIRAM PATILMira-Bhayandar (M Corp.)Thane
PRAJYOTI PADMAKAR PATILMira-Bhayandar (M Corp.)Thane
VASANT TULSIRAM PATILMira-Bhayandar (M Corp.)Thane
DHIRAJ VASANT PATILMira-Bhayandar (M Corp.)Thane
SUBHASH TULSIRAM PATILMira-Bhayandar (M Corp.)Thane
JAYESH SUBHASH PATILMira-Bhayandar (M Corp.)Thane
KUNAL SUBHASH PATILMira-Bhayandar (M Corp.)Thane
RANJAN TULSIRAM PATILMira-Bhayandar (M Corp.)Thane
SACHIN RANJAN PATILMira-Bhayandar (M Corp.)Thane
GIRIDHAR TULSIRAM PATILMira-Bhayandar (M Corp.)Thane
JAYANT TULSIRAM PATILMira-Bhayandar (M Corp.)Thane
CHINMAY JAYANT PATILMira-Bhayandar (M Corp.)Thane
SHAKUNTALA DEVENDRA PATILMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMira-Bhayandar Municipal Corporation
Permissible FSI6843.68
Proposed, not sanctioned6,844 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIDBI BANK LTD,BHAYANDAR BRANCH SHOP NO 1 2 AND 9 ARIHANT DARSHAN 90 FT ROAD CORNER BHAYANDAR 401101
Estimated costRs 36.00 cr
Cost incurredRs 19.20 cr
Work done53.33%
BuildingWingEstimatedIncurred
UNIQUE ESTATE TYPE-C WING DNARs 32.00 crRs 19.20 cr
-NARs 4.00 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAVINASHMHATRE AND ASSOCIATES
ArchitectSquare Architect
EngineerPROTECH CONSULTANT
EngineerGAURAV MISHRA
Chartered AccountantR D LUKAD
Chartered AccountantRAMESH DHONDIRAM LUKAD
PartnerRole in project
SIDDHIVINAYAK DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: Adobe Scan 20 Jun 2026 (1).pdf20 Jun 2026
Form 2A (FY 2024-2025)File: Adobe Scan 20 Jun 2026.pdf20 Jun 2026
Form 2A (FY 2025-2026)File: Adobe Scan 20 Jun 2026 (2).pdf20 Jun 2026
Withdrawal Update Form 1File: SIDDHIVINAYAK AAR.pdf18 Jun 2026
Withdrawal Update Form 1File: SIDDHIVINAYAK AAR.pdf18 Jun 2026
Withdrawal Update Form 2File: Form 2 Siddhi Vinayak Developers.pdf18 Jun 2026
Withdrawal Update Form 2File: Form 2 Siddhi Vinayak Developers.pdf18 Jun 2026
Withdrawal Update Form 3File: FORM 3 OCT TO DEC.pdf18 Jun 2026
Withdrawal Update Form 3File: FORM 3 JAN TO MARCH.pdf18 Jun 2026
Withdrawal Update Form 1File: SIDDHIVINAYAK AAR.pdf17 Jun 2026
Withdrawal Update Form 1File: SIDDHIVINAYAK AAR.pdf17 Jun 2026
Withdrawal Update Form 2File: Form 2 Siddhi Vinayak Developers.pdf17 Jun 2026
Withdrawal Update Form 2File: Form 2 Siddhi Vinayak Developers.pdf17 Jun 2026
Withdrawal Update Form 3File: FORM 3 OCT TO DEC.pdf17 Jun 2026
Withdrawal Update Form 3File: FORM 3 JAN TO MARCH.pdf17 Jun 2026
Withdrawal Update Form 1File: SIDDHIVINAYAK.pdf16 Jun 2026
Withdrawal Update Form 2File: SIDDHIVINAYAK DEV FROM 2 16-12-2025.pdf16 Jun 2026
Withdrawal Update Form 3File: CA.pdf16 Jun 2026
Form 5 (FY 2023-2024)File: FORM 5 23-24.pdf16 Jun 2026
Form 5 (FY 2024-2025)File: FORM 5 24-25.pdf16 Jun 2026
Form 5 (FY 2025-2026)File: FORM 5 25-26.pdf16 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf15 May 2026
Withdrawal Update Form 1File: FORM 1.pdf15 May 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf15 May 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf15 May 2026
Withdrawal Update Form 3File: CA.pdf15 May 2026
Withdrawal Update Form 3File: CA.pdf15 May 2026
Withdrawal Update Form 1File: FORM 1.pdf30 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf30 Dec 2025
Withdrawal Update Form 3File: CA.pdf30 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 UNIQUE ESTATE.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: siddhivinayak form2_0001.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: Scan_000113.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate .pdf25 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 2 .pdf25 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 3.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 3 .pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 4 .pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 5 .pdf25 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf4 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2.pdf4 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: COMPRESSED.pdf4 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf20 Jan 2024
Copy of the legal title reportFile: Legal-Siddhivinayak_11zon.pdf5 Dec 2023
Other - TechnicalFile: 1 Copy of Layout Approval (in case of layout)_11zon.pdf11 Nov 2023
Layout approvalFile: Layout Plan-fINAK.pdf23 Oct 2023
Building plan approvalFile: TYPE C.pdf23 Oct 2023
Copy of Layout Approval (in case of layout)File: Layout Plan-fINAK.pdf23 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: TYPE C.pdf23 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A form .pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3.pdf16 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Rakesh.pdf16 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Mukesh.pdf16 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Jayesh Chogle.pdf16 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: aSHISH kada,m.pdf16 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Chogalal.pdf16 Oct 2023
PAN CardFile: 3 PAN CARD.pdf30 Sep 2023
Details of encumbrances concerned to FinanceFile: Finance Encumbrance.pdf30 Sep 2023
Details of encumbrances concerned to LegalFile: Finance Encumbrance.pdf30 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: 5 CC.pdf30 Sep 2023
Declaration about Commencement CertificateFile: CC Declaration.pdf30 Sep 2023
Declaration in FORM BFile: Formb.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf30 Sep 2023
CERSAI detailsFile: Cersai.pdf30 Sep 2023
Proforma of Agreement for saleFile: Unique Estate Type C - RERA AGMT - 22092023.pdf30 Sep 2023
Proforma of Allotment letterFile: aLLOTMENT.pdf30 Sep 2023
Deviation Report with respect to Allotment letterFile: Allotment-Deviaition.pdf30 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Agreement Letter -Diviation.pdf30 Sep 2023

How this compares with Thane

35%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UNIQUE ESTATE TYPE-C WING D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GODDEV7,600+ in Thane

2 kmUNIQUE ESTATE TYPE-C WINCompleted 49Lapsed / revoked 31Other 74Dot size: filed unitsN

Filed coordinates, straight-line distance. 154 registered projects within 2 km.

Builder: SIDDHIVINAYAK DEVELOPERS

SIDDHIVINAYAK DEVELOPERS has 46 registrations on MahaRERA, including VIJAY PLAZA - A and VIJAY PLAZA - B. Its filings disclose 11 earlier MahaRERA projects: declares 6 of 9 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if UNIQUE ESTATE TYPE-C WING D is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UNIQUE ESTATE TYPE-C WING D?

The registered promoter entity is SIDDHIVINAYAK DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UNIQUE ESTATE TYPE-C WING D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for UNIQUE ESTATE TYPE-C WING D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UNIQUE ESTATE TYPE-C WING D?

The professionals named in the filing: Architect: AVINASHMHATRE AND ASSOCIATES; Architect: Square Architect; Engineer: PROTECH CONSULTANT; Engineer: GAURAV MISHRA; Chartered Accountant: R D LUKAD; Chartered Accountant: RAMESH DHONDIRAM LUKAD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UNIQUE ESTATE TYPE-C WING D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UNIQUE ESTATE TYPE-C WING D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UNIQUE ESTATE TYPE-C WING D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.