ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / UNIQUE ESTATE

Completed No litigation declared Residential / Group Housing project

UNIQUE ESTATE

By UNIQUE SHANTI REALTORS

RG-MH-67341 · RERA P51700006459 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 27 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
30 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
8 of 225Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

UNIQUE ESTATE is a Residential / Group Housing project by UNIQUE SHANTI REALTORS in Thane, Maharashtra, registered with MahaRERA as P51700006459 on 14 Aug 2017. The registration is recorded completed; possession was promised by 2 Mar 2023. The completion date has moved by 27 months from the original filing. 217 of the 225 units on this registration are recorded sold or booked, and 30 of 55 construction stages are filed complete.

At a glance

Project

  • NameUNIQUE ESTATE
  • TypeResidential / Group Housing
  • Location
    • 100 FEEST ROAD
    • MIRA ROAD EAST
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700006459
  • ReraGenie IDRG-MH-67341

Builder

  • NameUNIQUE SHANTI REALTORS
  • Entity typeOthers
  • Named personsUNIQUE SHANTI DEVELOPERS LLP, ORBIT PROPERTIES
  • Other registrations4 more →
  • Completed3 of 5

Key dates

this monthRegisteredAug 2017First promiseDec 2020Revised toMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Aug 2017
  • Promised completion2 Mar 2023
  • Revised completionRevised to 2 Mar 2023 (originally 30 Dec 2020)
  • Buildings5 building records
  • Documents filed54 files

Current status

96%217 of 225 units booked
89.5%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING A TYPE ANA13129512107
B WING TYPE BNA141059059
C WING TYPE B1NA141059059
D WING TYPE CNA00000
E WING TYPE DNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

WING A TYPE A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING TYPE B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C WING TYPE B191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D WING TYPE C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E WING TYPE D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered40
BuildingClosed/CoveredTotal
WING A TYPE A1111
B WING TYPE B1515
C WING TYPE B11414

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,831 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Apr 2026

Approvals and building plan

Sanctioning authorityMira Bhayander Municipal Corporation
Permissible FSI14971.51
Proposed, not sanctioned5,074 sq m
Buildings approved5
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchE-41 POONAM CHAMBERS PHASE -III SHANTI PARK MIRA ROAD EAST
Estimated costRs 49.04 cr
Cost incurredRs 43.88 cr
Work done89.46%
BuildingWingEstimatedIncurred
WING A TYPE ANARs 19.53 crRs 17.48 cr
C WING TYPE B1NARs 15.48 crRs 13.85 cr
B WING TYPE BNARs 14.03 crRs 12.55 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR Avinash Mhatre
EngineerMr Hiren M Tanna
EngineerEllora Projects Consultants
Chartered AccountantAJAY SHAH & CO
PartnerRole in project
UNIQUE SHANTI REALTORS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700008760Dec 2020 → Jun 2021

Reason as filed by the promoterCivil work of the said building completed due to the Covid -19 Pandemic the labours and machinery are shortage. hence the pending work like garden, Lift, doors and windows fitting are in slowly process.

EXT51700028082Dec 2020 → Mar 2023

Reason as filed by the promoterConstruction work is completed in all manners and we have obtained occupation certificate from Mira Bhayander Municipal Corporation on 02.03.2023. Hence we request to you please grant us extension upto Occupation certificate date i.e. 02.03.2023.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Mar 2023

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: UNIQUE ESTATE (2).pdf28 Apr 2026
Form 1File: FORM 1.pdf17 Apr 2026
Form 2File: FORM 2.pdf17 Apr 2026
Form 3File: FROM 3.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory.pdf17 Apr 2026
Occupational CertificateFile: Occupation Certificate.pdf17 Apr 2026
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory.pdf10 Jul 2025
Declaration in FORM BFile: FORM B.pdf9 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf9 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf9 Jul 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate 310323.pdf7 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate 310323.pdf3 Dec 2024
Other - TechnicalFile: UNIQUE ESTATE (2).pdf3 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate 310323.pdf6 Nov 2024
Other - TechnicalFile: Occupation Certificate Type A, B, B1.pdf6 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: UE FORM 5 2023.pdf5 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A FY - 2019 -20.pdf4 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A FY - 2020-21.pdf4 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A FY - 2021-22.pdf4 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate A wing A.pdf25 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate B wing B.pdf25 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate B1 wing C.pdf25 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Unique Estate.pdf13 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Rera Audit Form 5 Unique Estate 2021.pdf1 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Rera Audit Form 5 Unique Estate 2022.pdf1 Feb 2023
Declaration about Commencement CertificateFile: Declaration About CC.pdf12 Jul 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf12 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Letter of Application for OC.pdf12 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: USR_UNIQUE_ESTATE.pdf27 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: USR_RERA_FORM_5_MARCH_2019_UNIQUE_ESTATE.pdf16 Jan 2020
Certificates of CA (Form 5)File: UNIQUE ESTATE.pdf15 Oct 2018
Layout approvalFile: Unique Estate Revised Plan.pdf24 Jul 2018
Copy of Layout Approval (in case of layout)File: Unique Estate Revised Plan.pdf24 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: 11 Commencement Certificate 20 07 2016.pdf2 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE BLDG TYPE A.pdf30 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE BLDG TYPE B NEW.pdf30 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: aRCHITECTS CERTIFICATE BLDG TYPE B1 NEW.pdf30 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE BLDG TYPE A-B.pdf30 Mar 2018
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf30 Mar 2018
Layout approvalFile: Layout Plan.pdf30 Jul 2017
Building plan approvalFile: Commencement Certificate.pdf30 Jul 2017
PAN CardFile: PAN CARD.pdf30 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE Adv Jolani 16 12 2016.pdf30 Jul 2017
Details of encumbrancesFile: Encumberances Certificate.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf30 Jul 2017
Building Plan Approval (IOD)File: Commencement Certificate.pdf30 Jul 2017
Declaration in FORM BFile: Form 'B'-Affidavit cum Declaration.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Phase I 20 july 2017.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Phase 2 25 July 17.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Phase 3 25 july 17.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineer Form 2.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA Certificate Bldg A B C.pdf30 Jul 2017
Proforma of Allotment letterFile: Agreement for Sale.pdf30 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf30 Jul 2017

How this compares with Thane

96%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 27 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UNIQUE ESTATE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIRA ROAD EAST7,600+ in Thane

2 kmUNIQUE ESTATECompleted 56Lapsed / revoked 46Other 63Dot size: filed unitsN

Filed coordinates, straight-line distance. 165 registered projects within 2 km.

Builder: UNIQUE SHANTI REALTORS

UNIQUE SHANTI REALTORS has 5 registrations on MahaRERA, including UNIQUE ORBIT-I and UNIQUE ESTATE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if UNIQUE ESTATE is delayed beyond 2 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UNIQUE ESTATE?

The registered promoter entity is UNIQUE SHANTI REALTORS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UNIQUE ESTATE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for UNIQUE ESTATE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UNIQUE ESTATE?

The professionals named in the filing: Architect: MR Avinash Mhatre; Engineer: Mr Hiren M Tanna; Engineer: Ellora Projects Consultants; Chartered Accountant: AJAY SHAH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UNIQUE ESTATE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UNIQUE ESTATE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UNIQUE ESTATE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.