Home / Browse projects / Nagpur, Maharashtra / UMIYA LEELA APARTMENT
UMIYA LEELA APARTMENT
RG-MH-02722 · RERA P50500027323 · Last updated on MahaRERA portal: 5 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 15 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
UMIYA LEELA APARTMENT is a Mixed project by ISHWAR DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500027323 on 2 Dec 2020. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 15 months from the original filing. 12 of the 41 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameUMIYA LEELA APARTMENT
- TypeMixed
- Location
- PLOT NO 223
- LAKADGANJ
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440008
- Pincode440008
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500027323
- ReraGenie IDRG-MH-02722
Builder
- NameISHWAR DEVELOPERS
- Entity typePartnership
- PartnersYOGESH HIRALAL PATEL, DHARMENDRA JAVERBHAI PATEL
- Other registrations3 more →
- Completed2 of 4
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on2 Dec 2020
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Sep 2024)
- Buildings1 building record
- Documents filed102 files
Current status
Figures as on 5 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| UMIYA LEELA APARTMENT | NA | 65 | 10 | 34 | 6 | 40 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 5 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
UMIYA LEELA APARTMENT91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
NA Plot Without StructureNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 5 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed61
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| UMIYA LEELA APARTMENT | NA | Rs 12.50 cr | Rs 7.30 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANOOP PUNEKAR &ASSOCIATES |
| Architect | AGRASEN ARCHITECTS |
| Engineer | ANOOP PUNEKAR & ASSOCIATES |
| Engineer | AYUSH LONARE |
| Chartered Accountant | ASHISH AGARWAL |
| Chartered Accountant | PATEL JAIN & CO. |
| Partner | Role in project |
|---|---|
| ISHWAR DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to unforeseen circumstances beyond our control, like few departmental clearances for the execution of the project, administrative procedures, Labour issues like labour shortage and Migration of labour due to govt. policy and festive season.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Oct 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Oct 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Oct 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed102
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Architect certificate June 2025.pdf | 5 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer certificate June 25.pdf | 5 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate June 2025.pdf | 5 Jan 2026 |
| Form 1File: FORM 1-Architect Certificate Sept25.pdf | 11 Dec 2025 |
| Form 2File: FORM 2 Engineer Certificate Sept 25.pdf | 11 Dec 2025 |
| Form 3File: Form 3 CA Certificate Sept 25.pdf | 11 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: sold booked inventory sep 25.pdf | 11 Dec 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar22.pdf | 17 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 22.pdf | 17 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sept22.pdf | 17 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec22.pdf | 17 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar23.pdf | 17 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 23.pdf | 17 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sept23.pdf | 17 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec23.pdf | 17 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar24.pdf | 17 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 24.pdf | 17 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sept24.pdf | 17 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec24.pdf | 17 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar25.pdf | 17 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate mar23.pdf | 11 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate june23.pdf | 11 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate sept 23.pdf | 11 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dec23.pdf | 11 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate mar24.pdf | 11 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate june24.pdf | 11 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate sept24.pdf | 11 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dec24.pdf | 11 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate mar25.pdf | 11 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate june22.pdf | 10 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate sept 22.pdf | 10 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dec22.pdf | 10 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate mar22.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold booked Inventory Mar 25.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold booked Inventory Dec 24.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold booked Inventory Sep 24.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: sold booked Inventory Jun 24.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold booked Inventory Mar 24.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold booked Inventory Dec 23.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold booked Inventory Sep 23.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold booked Inventory Jun 23.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold booked Inventory Mar 23.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold booked Inventory Dec 22.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold booked Inventory Sep 22.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: sold booked Inventory Jun 22.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold booked Inventory Mar 22.pdf | 10 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAR 22 Engineer Certificate.pdf | 5 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUNE 22 Engineer Certificate.pdf | 5 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEPT 22 Engineer Certificate.pdf | 5 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC 22 Engineer Certificate.pdf | 5 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAR 23 Engineer Certificate.pdf | 5 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUNE 23 Engineer Certificate.pdf | 5 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEP 23 Engineer Certificate.pdf | 5 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC 23 Engineer Certificate.pdf | 5 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAR 24 Engineer Certificate.pdf | 5 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUNE 24 Engineer Certificate.pdf | 5 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEP 24 Engineer Certificate.pdf | 5 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC 24 Engineer Certificate.pdf | 5 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAR 25 Engineer Certificate.pdf | 5 Jul 2025 |
| Status of ConveyanceFile: UMIYA LEELA-AGREEMENT TO SELL -REGISTERED304-FLAT INGOLE-2024.pdf | 6 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form_5_2024_25.pdf | 6 Jun 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Ishwar_Developer_Format_A.pdf | 22 May 2025 |
| Proforma of Agreement for saleFile: UMIYA LEELA-AGREEMENT TO SELL -REGISTERED304-FLAT INGOLE-2024.pdf | 22 May 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Ishwar_Developer_Format_B.pdf | 22 May 2025 |
| Details of encumbrances concerned to FinanceFile: Self Declaration of Financial Encumbrance.pdf | 7 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 2017-18.pdf | 7 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2020.pdf | 7 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19.pdf | 7 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20.pdf | 7 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf | 7 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2021.pdf | 7 Apr 2025 |
| Details of encumbrances concerned to LegalFile: Self Declaration of Financial Encumbrance.pdf | 7 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf | 7 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2022.pdf | 7 Apr 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate org.pdf | 7 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2023.pdf | 7 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf | 7 Apr 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of SecuredUnsecured Loan.pdf | 7 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 14 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate.pdf | 14 Dec 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 102 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep UMIYA LEELA APARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near LAKADGANJ2,800+ in Nagpur
Filed coordinates, straight-line distance. 39 registered projects within 2 km.
KUKREJA PARIS CITY-WING C & D
KUKREJA INFRASTRUCTURES
kASTURI HEIGHT
SKY DEVELOPERS AND PROMOTERS INDIA PVT. LT
EASTORIA GRACE
EASTORIA BUILDERS AND DEVLOPERS LLP
SDPL Om
SANDEEP DWELLERS PVT. LTD.
UDYOG VIHAR
ALLIANCE REALITIES
KUKREJA INFINITY EAST
KUKREJA INFRASTRUCTURES
See every Nagpur project, with the district possession charts
Builder: ISHWAR DEVELOPERS
ISHWAR DEVELOPERS has 4 registrations on MahaRERA, including UMIYA LEELA APARTMENT and ISHWAR APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What does it mean that UMIYA LEELA APARTMENT shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if UMIYA LEELA APARTMENT is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of UMIYA LEELA APARTMENT?
The registered promoter entity is ISHWAR DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in UMIYA LEELA APARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for UMIYA LEELA APARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at UMIYA LEELA APARTMENT?
The professionals named in the filing: Architect: ANOOP PUNEKAR &ASSOCIATES; Architect: AGRASEN ARCHITECTS; Engineer: ANOOP PUNEKAR & ASSOCIATES; Engineer: AYUSH LONARE; Chartered Accountant: ASHISH AGARWAL; Chartered Accountant: PATEL JAIN & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in UMIYA LEELA APARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback