ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / UMIYA LEELA APARTMENT

Registration lapsed No litigation declared Mixed project

UMIYA LEELA APARTMENT

By ISHWAR DEVELOPERS

RG-MH-02722 · RERA P50500027323 · Last updated on MahaRERA portal: 5 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
10 of 11Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
29 of 41Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

UMIYA LEELA APARTMENT is a Mixed project by ISHWAR DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500027323 on 2 Dec 2020. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 15 months from the original filing. 12 of the 41 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameUMIYA LEELA APARTMENT
  • TypeMixed
  • Location
    • PLOT NO 223
    • LAKADGANJ
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440008
  • Pincode440008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500027323
  • ReraGenie IDRG-MH-02722

Builder

  • NameISHWAR DEVELOPERS
  • Entity typePartnership
  • PartnersYOGESH HIRALAL PATEL, DHARMENDRA JAVERBHAI PATEL
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live2 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredDec 2020First promiseSep 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on2 Dec 2020
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Sep 2024)
  • Buildings1 building record
  • Documents filed102 files

Current status

29%12 of 41 units booked
58.4%Work done, per cost certificate

Figures as on 5 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UMIYA LEELA APARTMENTNA651034640

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 5 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

UMIYA LEELA APARTMENT91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 5 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed61

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots61
Closed/Covered11
Open Space50

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,003 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Dec 2025

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation (NMC)
Permissible FSI3010.0
Proposed, not sanctioned3,010 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWARDHAMAN NAGAR NAGPUR
Estimated costRs 12.50 cr
Cost incurredRs 7.30 cr
Work done58.4%
BuildingWingEstimatedIncurred
UMIYA LEELA APARTMENTNARs 12.50 crRs 7.30 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANOOP PUNEKAR &ASSOCIATES
ArchitectAGRASEN ARCHITECTS
EngineerANOOP PUNEKAR & ASSOCIATES
EngineerAYUSH LONARE
Chartered AccountantASHISH AGARWAL
Chartered AccountantPATEL JAIN & CO.
PartnerRole in project
ISHWAR DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500024721Sep 2024 → Dec 2025

Reason as filed by the promoterDue to unforeseen circumstances beyond our control, like few departmental clearances for the execution of the project, administrative procedures, Labour issues like labour shortage and Migration of labour due to govt. policy and festive season.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Oct 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect certificate June 2025.pdf5 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer certificate June 25.pdf5 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Certificate June 2025.pdf5 Jan 2026
Form 1File: FORM 1-Architect Certificate Sept25.pdf11 Dec 2025
Form 2File: FORM 2 Engineer Certificate Sept 25.pdf11 Dec 2025
Form 3File: Form 3 CA Certificate Sept 25.pdf11 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold booked inventory sep 25.pdf11 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar22.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 22.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sept22.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec22.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar23.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 23.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sept23.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec23.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar24.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 24.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sept24.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec24.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar25.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate mar23.pdf11 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate june23.pdf11 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate sept 23.pdf11 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dec23.pdf11 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate mar24.pdf11 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate june24.pdf11 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate sept24.pdf11 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dec24.pdf11 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate mar25.pdf11 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate june22.pdf10 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate sept 22.pdf10 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dec22.pdf10 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate mar22.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold booked Inventory Mar 25.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold booked Inventory Dec 24.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold booked Inventory Sep 24.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: sold booked Inventory Jun 24.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold booked Inventory Mar 24.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold booked Inventory Dec 23.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold booked Inventory Sep 23.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold booked Inventory Jun 23.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold booked Inventory Mar 23.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold booked Inventory Dec 22.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold booked Inventory Sep 22.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: sold booked Inventory Jun 22.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold booked Inventory Mar 22.pdf10 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAR 22 Engineer Certificate.pdf5 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUNE 22 Engineer Certificate.pdf5 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEPT 22 Engineer Certificate.pdf5 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC 22 Engineer Certificate.pdf5 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAR 23 Engineer Certificate.pdf5 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUNE 23 Engineer Certificate.pdf5 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEP 23 Engineer Certificate.pdf5 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC 23 Engineer Certificate.pdf5 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAR 24 Engineer Certificate.pdf5 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUNE 24 Engineer Certificate.pdf5 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEP 24 Engineer Certificate.pdf5 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC 24 Engineer Certificate.pdf5 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAR 25 Engineer Certificate.pdf5 Jul 2025
Status of ConveyanceFile: UMIYA LEELA-AGREEMENT TO SELL -REGISTERED304-FLAT INGOLE-2024.pdf6 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form_5_2024_25.pdf6 Jun 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Ishwar_Developer_Format_A.pdf22 May 2025
Proforma of Agreement for saleFile: UMIYA LEELA-AGREEMENT TO SELL -REGISTERED304-FLAT INGOLE-2024.pdf22 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Ishwar_Developer_Format_B.pdf22 May 2025
Details of encumbrances concerned to FinanceFile: Self Declaration of Financial Encumbrance.pdf7 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 2017-18.pdf7 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2020.pdf7 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19.pdf7 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20.pdf7 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf7 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2021.pdf7 Apr 2025
Details of encumbrances concerned to LegalFile: Self Declaration of Financial Encumbrance.pdf7 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf7 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2022.pdf7 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate org.pdf7 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2023.pdf7 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf7 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of SecuredUnsecured Loan.pdf7 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf14 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate.pdf14 Dec 2024

How this compares with Nagpur

29%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 15 months
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UMIYA LEELA APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LAKADGANJ2,800+ in Nagpur

2 kmUMIYA LEELA APARTMENTCompleted 8Lapsed / revoked 15Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: ISHWAR DEVELOPERS

ISHWAR DEVELOPERS has 4 registrations on MahaRERA, including UMIYA LEELA APARTMENT and ISHWAR APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that UMIYA LEELA APARTMENT shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if UMIYA LEELA APARTMENT is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UMIYA LEELA APARTMENT?

The registered promoter entity is ISHWAR DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UMIYA LEELA APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for UMIYA LEELA APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UMIYA LEELA APARTMENT?

The professionals named in the filing: Architect: ANOOP PUNEKAR &ASSOCIATES; Architect: AGRASEN ARCHITECTS; Engineer: ANOOP PUNEKAR & ASSOCIATES; Engineer: AYUSH LONARE; Chartered Accountant: ASHISH AGARWAL; Chartered Accountant: PATEL JAIN & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UMIYA LEELA APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UMIYA LEELA APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UMIYA LEELA APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.