Home / Browse projects / Nagpur, Maharashtra / kASTURI HEIGHT

Registered No litigation declared Residential / Group Housing project

kASTURI HEIGHT

By SKY DEVELOPERS AND PROMOTERS INDIA PVT. LTD.

RG-MH-00337 · RERA P50500004982 · Last updated on MahaRERA portal: 19 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
10 of 22Construction stages doneacross 2 buildings; furthest along: Plinth, 75%
34 of 144Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

kASTURI HEIGHT is a Residential / Group Housing project by SKY DEVELOPERS AND PROMOTERS INDIA PVT. LTD. in Nagpur, Maharashtra, registered with MahaRERA as P50500004982 on 9 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 110 of the 144 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NamekASTURI HEIGHT
  • TypeResidential / Group Housing
  • Location
    • Chandmari Road
    • Wathoda layout
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440008
  • Pincode440008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500004982
  • ReraGenie IDRG-MH-00337

Builder

  • NameSKY DEVELOPERS AND PROMOTERS INDIA PVT. LTD.
  • Entity typeCompany
  • Managing DirectorsSAIFUDDIN FIDAALI DAMA, YUSUF HASANALI BEHRAINWALA, KHUZEMA QUTBUDDIN MAIMOON
  • Other registrations5 more →
  • Completed3 of 6
  • Declared earlier projects3 →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings2 building records
  • Documents filed62 files

Current status

76%110 of 144 units booked
78.3%Work done, per cost certificate

Figures as on 19 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA111072072
WIN BNA111072072

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Plinth, at 75%.

WING A31%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth75%
Stilt Floor50%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WIN B82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes55%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes55%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed104

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots104
Closed/Covered2
Open Space102
BuildingClosed/CoveredOpen SpaceTotal
WING A15152
WIN B15152

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,841 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNagpur Improvement Trust
Permissible FSI8449.26
Proposed, not sanctioned5,788 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGandhibagh Nagpur
Estimated costRs 57.44 cr
Cost incurredRs 44.96 cr
Work done78.27%
BuildingWingEstimatedIncurred
WING ANARs 28.72 crRs 22.48 cr
WIN BNARs 28.72 crRs 22.48 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectrajenddra R Sulke
Architectalok lunia
EngineerR & G ASSOCIATES
EngineerAshfaque Husain
Chartered AccountantJayendra Chilate
Chartered AccountantParvez Ali
PartnerRole in project
SKY DEVELOPERS AND PROMOTERS INDIA PVT. LTD.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500018420Dec 2023 → Dec 2026

Reason as filed by the promoterWe almost complited 90% wing B now we want to complete wing A,So we want more time to complete my project. Kasturi Height. Kindly grant extension for my project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1 Kasturi Height July-Sep25.pdf19 Jan 2026
Withdrawal Update Form 2File: Form2 Kasturi Height July-Sep25.pdf19 Jan 2026
Withdrawal Update Form 3File: Form3 Kasturi Height July-Sep25.pdf19 Jan 2026
Form 1File: FORM-1 KASTURI HEIGHT JAN25 (1).pdf3 Oct 2025
Form 2File: Form2 KASTUR HEIGHTS Jan-march25 (1).pdf3 Oct 2025
Form 3File: Form3 KASTURI HEIGHTS Jan-March25.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold inventory Kasturi Height jan25.pdf3 Oct 2025
Withdrawal Update Form 1File: Form1 April to June 25.pdf3 Oct 2025
Withdrawal Update Form 2File: Form2 April to June25.pdf3 Oct 2025
Withdrawal Update Form 3File: Form3 April to June25.pdf3 Oct 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 jan24 to June24 kasturi heights.pdf7 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 July to sep24 kasturi heights.pdf7 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 oct to dec24 kasturi heights.pdf7 Feb 2025
Certificates of CA (Form 3)File: Form3 July to sep24 kasturi heights_compressed.pdf7 Feb 2025
Certificates of CA (Form 3)File: Form3 oct to dec24 kasturi heights_compressed.pdf7 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2 July ti sep24 kasturi heights.pdf7 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form2 oct to dec24 kasturi heights.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A 23-24 kasturi height.pdf7 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5 23-24 Kasturi heights.pdf7 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Kasturi Heights Form2.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: ilovepdf_merged.pdf8 Aug 2024
Certificates of CA (Form 3)File: Kasturi Heights Form3_compressed.pdf8 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form2 kasturi height.pdf23 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY KASTURI HEIGHTS.pdf23 Apr 2024
Certificates of CA (Form 3)File: Form3 kasturi height_compressed.pdf23 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 kasturi heights.pdf22 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 kasturi heights.pdf22 Feb 2024
Disclosure of sold/ booked inventoryFile: kasturi height sold (1).pdf22 Feb 2024
Certificates of CA (Form 3)File: kasturi height form 3 (1)_compressed.pdf22 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form1 kasturi heights.pdf25 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A 20.pdf25 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A 21.pdf25 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 22.pdf25 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 19-20.pdf25 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 20-21.pdf25 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form-5 22-23.pdf4 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 21-22.pdf4 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 KASTURI HEIGHTS.pdf30 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A KASTURI HEIGHTS.pdf30 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY_compressed.pdf30 Oct 2023
Certificates of CA (Form 3)File: FORM-3 KASTURI HEIGHTS_compressed.pdf30 Oct 2023
Certificates of CA (Form 5)File: FORM-5.pdf30 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 heights.pdf14 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 heights.pdf14 Jul 2023
Disclosure of sold/ booked inventoryFile: ilovepdf_merged_compressed.pdf14 Jul 2023
Certificates of CA (Form 3)File: Form-3 heights_compressed.pdf14 Jul 2023
Certificates of CA (Form 5)File: Form-5 heights.pdf14 Jul 2023
Certificates of CA (Form 5)File: KH.pdf6 Oct 2018
Declaration in FORM BFile: form b.pdf3 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER.pdf3 Aug 2017
Certificates of CA (Form 3)File: C A.pdf3 Aug 2017
Proforma of Allotment letterFile: AGREEMENT TO SALE.pdf3 Aug 2017
Layout approvalFile: layout PERMIT.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: layout PERMIT.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT-ilovepdf-compressed (1).pdf26 Jul 2017
Building plan approvalFile: building permit.pdf19 Jul 2017
Copy of the legal title reportFile: legal title report-ilovepdf-compressed.pdf19 Jul 2017
Details of encumbrancesFile: legal title report-ilovepdf-compressed.pdf19 Jul 2017
Building Plan Approval (IOD)File: building permit.pdf19 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: building permit.pdf19 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf19 Jul 2017
PAN CardFile: SKY PAN.pdf10 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Kasturi GardenP50500021136WELA HARI ROAD, Nagpur220Jun 2019OngoingDec 2030Not due yet
J. K. HEIGHTSP50600023850SARAFA BAZAAR, Bhandara79Jan 2020OngoingDec 2025Not delivered

How this compares with Nagpur

76%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 36 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep kASTURI HEIGHT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nagpur2,800+ in Nagpur

2 kmkASTURI HEIGHTCompleted 3Lapsed / revoked 4Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: SKY DEVELOPERS AND PROMOTERS INDIA PVT. LTD.

SKY DEVELOPERS AND PROMOTERS INDIA PVT. LTD. has 6 registrations on MahaRERA, including kASTURI HEIGHT and KASTURI APPARTMENTS. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if kASTURI HEIGHT is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of kASTURI HEIGHT?

The registered promoter entity is SKY DEVELOPERS AND PROMOTERS INDIA PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in kASTURI HEIGHT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for kASTURI HEIGHT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at kASTURI HEIGHT?

The professionals named in the filing: Architect: rajenddra R Sulke; Architect: alok lunia; Engineer: R & G ASSOCIATES; Engineer: Ashfaque Husain; Chartered Accountant: Jayendra Chilate; Chartered Accountant: Parvez Ali. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in kASTURI HEIGHT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About kASTURI HEIGHT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save kASTURI HEIGHT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.