ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / KUKREJA INFINITY EAST

Registered No litigation declared Others project

KUKREJA INFINITY EAST

By KUKREJA INFRASTRUCTURES

RG-MH-03689 · RERA P50500030914 · Last updated on MahaRERA portal: 21 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedmoved 12 months from the original
11 of 11Construction stages doneevery applicable stage filed complete
25 of 85Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

KUKREJA INFINITY EAST is a Others project by KUKREJA INFRASTRUCTURES in Nagpur, Maharashtra, registered with MahaRERA as P50500030914 on 29 Sep 2021. Possession is promised by 30 Nov 2026. The completion date has moved by 12 months from the original filing. 60 of the 85 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameKUKREJA INFINITY EAST
  • TypeOthers
  • Location
    • Retainable land - A
    • Khasra no. - 43-44/2
    • Shri. Krishna Nagar
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440008
  • Pincode440008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500030914
  • ReraGenie IDRG-MH-03689

Builder

  • NameKUKREJA INFRASTRUCTURES
  • Entity typePartnership
  • PartnerVIRENDRA GHANSHYAM KUKREJA
  • Other registrations7 more →
  • Completed2 of 8
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2021First promiseNov 2025Revised toNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Sep 2021
  • Promised completion30 Nov 2026
  • Revised completionRevised to 30 Nov 2026 (originally 30 Nov 2025)
  • Buildings1 building record
  • Documents filed108 files

Current status

71%60 of 85 units booked
91.8%Work done, per cost certificate

Figures as on 21 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KUKREJA INFINITY EASTNA252080585

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

KUKREJA INFINITY EAST: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed172

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots172
Closed/Covered172

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,340 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jul 2025

Approvals and building plan

Sanctioning authorityNAGPUR MUNICIPAL CORPORATION (NMC)
Permissible FSI13020.0
Proposed, not sanctioned7,595 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDHARAMPETH NAGPUR
Estimated costRs 86.13 cr
Cost incurredRs 79.07 cr
Work done91.8%
BuildingWingEstimatedIncurred
KUKREJA INFINITY EASTNARs 86.13 crRs 79.07 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Lokesh Kadu
ArchitectAr REZA KABUL
EngineerVikrant Chaubey
Chartered AccountantVinod Hassani
Chartered AccountantK.P. Sahasrabudhe & Co.
PartnerRole in project
KUKREJA INFRASTRUCTURES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA26062621571Nov 2025 → Nov 2026

Reason as filed by the promoterRespected Sir/Madam, We, the Promoter of the project "KUKREJA INFINITY EAST" bearing MahaRERA Registration No. P50500030914, respectfully request your kind consideration for granting an extension of the project registration up to 30/11/2026. The original completion date of the project was 30/11/2025, and the Occupancy Certificate was duly received on 31/10/2025, well within the stipulated timeline. While initiating the process of submitting the Occupancy Certificate on the MahaRERA portal, we observed that certain project particulars require correction. However, since the project registration

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2026

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1.pdf21 Jul 2026
Withdrawal Update Form 1File: FORM-1.pdf21 Jul 2026
Withdrawal Update Form 2File: FORM-2.pdf21 Jul 2026
Withdrawal Update Form 2File: FORM-2.pdf21 Jul 2026
Withdrawal Update Form 3File: FORM-3.pdf21 Jul 2026
Withdrawal Update Form 3File: FORM-3.pdf21 Jul 2026
Form 2A (FY 2025-2026)File: FORM-2A KUKREJA INFINITY EAST March 26.pdf20 Jul 2026
Form 5 (FY 2025-2026)File: FORM-5 KUKREJA INFINTY EAST MAR-2025.pdf20 Jul 2026
Withdrawal Update Form 1File: KUKREJA INFINITY EAST_FORM-1_JUNE-25.pdf18 Jul 2026
Withdrawal Update Form 1File: KUKREJA INFINITY EAST_FORM-1_JUNE-25.pdf18 Jul 2026
Withdrawal Update Form 2File: KUKREJA INFINITY EAST_FORM-2_DEC-24.pdf18 Jul 2026
Withdrawal Update Form 2File: KUKREJA INFINITY EAST_FORM-2_DEC-24.pdf18 Jul 2026
Withdrawal Update Form 3File: FORM 3 DEC-24.pdf18 Jul 2026
Withdrawal Update Form 3File: FORM 3 DEC-24.pdf18 Jul 2026
Withdrawal Update Form 1File: KUKREJA INFINITY EAST_FORM-1_JUNE-25.pdf1 Jan 2026
Withdrawal Update Form 2File: KUKREJA INFINITY EAST_FORM-2_DEC-24.pdf1 Jan 2026
Withdrawal Update Form 3File: FORM 3 DEC-24.pdf1 Jan 2026
Form 5 (FY 2024-2025)File: FORM-5 MAR-24.pdf1 Jan 2026
Withdrawal Update Form 1File: KUKREJA INFINITY EAST_FORM-1_JUNE-25.pdf29 Oct 2025
Withdrawal Update Form 2File: KUKREJA INFINITY EAST_FORM-2_DEC-24.pdf29 Oct 2025
Withdrawal Update Form 3File: FORM 3 DEC-24.pdf29 Oct 2025
Withdrawal Update Form 1File: KUKREJA INFINITY EAST_FORM-1_JUNE-25.pdf18 Oct 2025
Withdrawal Update Form 2File: KUKREJA INFINITY EAST_FORM-2_DEC-24.pdf18 Oct 2025
Withdrawal Update Form 3File: FORM 3 DEC-24.pdf18 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf11 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf11 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf11 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf11 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf11 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf11 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf11 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf11 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf11 May 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf11 May 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf11 May 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf11 May 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf11 May 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf11 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A.pdf11 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A.pdf11 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A.pdf11 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: INFINITY EAST_002738.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_SEP-24.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kukreja Infinity East Form 1 June 2024.pdf14 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KUKREJA INFRASTRUCTURE Form 3 Final 2022-23_compressed.pdf19 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kukreja Infinity East Form 1 March 24.pdf16 Apr 2024
Details of encumbrancesFile: Encumbrance.pdf13 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumbrance.pdf13 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrance.pdf13 Mar 2024
Declaration in FORM BFile: form-b.pdf13 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 KUKREJA INFINITY EAST_Mar-23.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 KUKREJA INFINITY EAST_June-23.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 KUKREJA INFINITY EAST_Dec-23.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KUKREJA INFINTY EAST 04-01-2023.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KUKREJA INFINTY EAST 01-10-2023.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: INFINITY EAST_SOLDBOOK_DEC-21.pdf28 Feb 2023
Disclosure of sold/ booked inventoryFile: INFINITY EAST_SOLDBOOK_Mar-22.pdf28 Feb 2023
Disclosure of sold/ booked inventoryFile: INFINITY EAST_SOLDBOOK_Sept-22.pdf28 Feb 2023
Disclosure of sold/ booked inventoryFile: INFINITY EAST_SOLDBOOK_JUNE-22.pdf28 Feb 2023
Disclosure of sold/ booked inventoryFile: INFINITY EAST_SOLDBOOK_Sept-22.pdf28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kukreja Infinity East_Form-1_Jan-22.pdf18 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kukreja Infinity East_Form-1_Arp-22.pdf18 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kukreja Infinity East_Form-1_Oct-22.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: KUKREJA INFINITY EAST-FORM-5_MAR-22_NEW.pdf17 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: kukreja infinity east 19-20 1.pdf29 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: kukreja infinity east 20-21.pdf29 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: East Form 1 Architect's certificate.pdf25 Jul 2022
Copy of the legal title reportFile: Infinity east- Serch Report.pdf13 Jul 2022
Details of encumbrancesFile: Infinity east-Encumbrance.pdf13 Jul 2022
Layout approvalFile: Sheet 1.pdf12 Jul 2022
Building plan approvalFile: Sheet 2.pdf12 Jul 2022
Building plan approvalFile: Sheet 3.pdf12 Jul 2022
Building plan approvalFile: Sheet 4.pdf12 Jul 2022
Building plan approvalFile: Sheet 5.pdf12 Jul 2022
Building plan approvalFile: Sheet 5.pdf12 Jul 2022
Building plan approvalFile: Sheet 9.pdf12 Jul 2022
Building plan approvalFile: Sheet 9.pdf12 Jul 2022
Building plan approvalFile: Sheet 9.pdf12 Jul 2022
Copy of Layout Approval (in case of layout)File: Sheet 1.pdf12 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet 2.pdf12 Jul 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Suncity IPlot No 6-7-8 Dixit Nagar Nagpur94CompletedNov 2017Jul 2017

How this compares with Nagpur

71%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 12 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KUKREJA INFINITY EAST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shri. Krishna Nagar2,800+ in Nagpur

2 kmKUKREJA INFINITY EASTCompleted 7Lapsed / revoked 11Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 32 registered projects within 2 km.

Builder: KUKREJA INFRASTRUCTURES

KUKREJA INFRASTRUCTURES has 8 registrations on MahaRERA, including SUNCITY 2 and KUKREJA INFINITY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if KUKREJA INFINITY EAST is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KUKREJA INFINITY EAST?

The registered promoter entity is KUKREJA INFRASTRUCTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KUKREJA INFINITY EAST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KUKREJA INFINITY EAST?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KUKREJA INFINITY EAST?

The professionals named in the filing: Architect: Ar Lokesh Kadu; Architect: Ar REZA KABUL; Engineer: Vikrant Chaubey; Chartered Accountant: Vinod Hassani; Chartered Accountant: K.P. Sahasrabudhe & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KUKREJA INFINITY EAST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KUKREJA INFINITY EAST. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KUKREJA INFINITY EAST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.