KUKREJA INFINITY EAST
RG-MH-03689 · RERA P50500030914 · Last updated on MahaRERA portal: 21 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KUKREJA INFINITY EAST is a Others project by KUKREJA INFRASTRUCTURES in Nagpur, Maharashtra, registered with MahaRERA as P50500030914 on 29 Sep 2021. Possession is promised by 30 Nov 2026. The completion date has moved by 12 months from the original filing. 60 of the 85 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameKUKREJA INFINITY EAST
- TypeOthers
- Location
- Retainable land - A
- Khasra no. - 43-44/2
- Shri. Krishna Nagar
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440008
- Pincode440008
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500030914
- ReraGenie IDRG-MH-03689
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Sep 2021
- Promised completion30 Nov 2026
- Revised completionRevised to 30 Nov 2026 (originally 30 Nov 2025)
- Buildings1 building record
- Documents filed108 files
Current status
Figures as on 21 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KUKREJA INFINITY EAST | NA | 25 | 20 | 80 | 5 | 85 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 21 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
KUKREJA INFINITY EAST: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 21 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed172
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| KUKREJA INFINITY EAST | NA | Rs 86.13 cr | Rs 79.07 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Lokesh Kadu |
| Architect | Ar REZA KABUL |
| Engineer | Vikrant Chaubey |
| Chartered Accountant | Vinod Hassani |
| Chartered Accountant | K.P. Sahasrabudhe & Co. |
| Partner | Role in project |
|---|---|
| KUKREJA INFRASTRUCTURES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRespected Sir/Madam, We, the Promoter of the project "KUKREJA INFINITY EAST" bearing MahaRERA Registration No. P50500030914, respectfully request your kind consideration for granting an extension of the project registration up to 30/11/2026. The original completion date of the project was 30/11/2025, and the Occupancy Certificate was duly received on 31/10/2025, well within the stipulated timeline. While initiating the process of submitting the Occupancy Certificate on the MahaRERA portal, we observed that certain project particulars require correction. However, since the project registration
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Nov 2026
Documents filed108
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM-1.pdf | 21 Jul 2026 |
| Withdrawal Update Form 1File: FORM-1.pdf | 21 Jul 2026 |
| Withdrawal Update Form 2File: FORM-2.pdf | 21 Jul 2026 |
| Withdrawal Update Form 2File: FORM-2.pdf | 21 Jul 2026 |
| Withdrawal Update Form 3File: FORM-3.pdf | 21 Jul 2026 |
| Withdrawal Update Form 3File: FORM-3.pdf | 21 Jul 2026 |
| Form 2A (FY 2025-2026)File: FORM-2A KUKREJA INFINITY EAST March 26.pdf | 20 Jul 2026 |
| Form 5 (FY 2025-2026)File: FORM-5 KUKREJA INFINTY EAST MAR-2025.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: KUKREJA INFINITY EAST_FORM-1_JUNE-25.pdf | 18 Jul 2026 |
| Withdrawal Update Form 1File: KUKREJA INFINITY EAST_FORM-1_JUNE-25.pdf | 18 Jul 2026 |
| Withdrawal Update Form 2File: KUKREJA INFINITY EAST_FORM-2_DEC-24.pdf | 18 Jul 2026 |
| Withdrawal Update Form 2File: KUKREJA INFINITY EAST_FORM-2_DEC-24.pdf | 18 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 DEC-24.pdf | 18 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 DEC-24.pdf | 18 Jul 2026 |
| Withdrawal Update Form 1File: KUKREJA INFINITY EAST_FORM-1_JUNE-25.pdf | 1 Jan 2026 |
| Withdrawal Update Form 2File: KUKREJA INFINITY EAST_FORM-2_DEC-24.pdf | 1 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 DEC-24.pdf | 1 Jan 2026 |
| Form 5 (FY 2024-2025)File: FORM-5 MAR-24.pdf | 1 Jan 2026 |
| Withdrawal Update Form 1File: KUKREJA INFINITY EAST_FORM-1_JUNE-25.pdf | 29 Oct 2025 |
| Withdrawal Update Form 2File: KUKREJA INFINITY EAST_FORM-2_DEC-24.pdf | 29 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 DEC-24.pdf | 29 Oct 2025 |
| Withdrawal Update Form 1File: KUKREJA INFINITY EAST_FORM-1_JUNE-25.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: KUKREJA INFINITY EAST_FORM-2_DEC-24.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 DEC-24.pdf | 18 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf | 11 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 11 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 11 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 11 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 11 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 11 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 11 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 11 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 11 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf | 11 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf | 11 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf | 11 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf | 11 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf | 11 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A.pdf | 11 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A.pdf | 11 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A.pdf | 11 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: INFINITY EAST_002738.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_SEP-24.pdf | 18 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kukreja Infinity East Form 1 June 2024.pdf | 14 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KUKREJA INFRASTRUCTURE Form 3 Final 2022-23_compressed.pdf | 19 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kukreja Infinity East Form 1 March 24.pdf | 16 Apr 2024 |
| Details of encumbrancesFile: Encumbrance.pdf | 13 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance.pdf | 13 Mar 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance.pdf | 13 Mar 2024 |
| Declaration in FORM BFile: form-b.pdf | 13 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 KUKREJA INFINITY EAST_Mar-23.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 KUKREJA INFINITY EAST_June-23.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 KUKREJA INFINITY EAST_Dec-23.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KUKREJA INFINTY EAST 04-01-2023.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KUKREJA INFINTY EAST 01-10-2023.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: INFINITY EAST_SOLDBOOK_DEC-21.pdf | 28 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: INFINITY EAST_SOLDBOOK_Mar-22.pdf | 28 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: INFINITY EAST_SOLDBOOK_Sept-22.pdf | 28 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: INFINITY EAST_SOLDBOOK_JUNE-22.pdf | 28 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: INFINITY EAST_SOLDBOOK_Sept-22.pdf | 28 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kukreja Infinity East_Form-1_Jan-22.pdf | 18 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kukreja Infinity East_Form-1_Arp-22.pdf | 18 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kukreja Infinity East_Form-1_Oct-22.pdf | 18 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: KUKREJA INFINITY EAST-FORM-5_MAR-22_NEW.pdf | 17 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: kukreja infinity east 19-20 1.pdf | 29 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: kukreja infinity east 20-21.pdf | 29 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: East Form 1 Architect's certificate.pdf | 25 Jul 2022 |
| Copy of the legal title reportFile: Infinity east- Serch Report.pdf | 13 Jul 2022 |
| Details of encumbrancesFile: Infinity east-Encumbrance.pdf | 13 Jul 2022 |
| Layout approvalFile: Sheet 1.pdf | 12 Jul 2022 |
| Building plan approvalFile: Sheet 2.pdf | 12 Jul 2022 |
| Building plan approvalFile: Sheet 3.pdf | 12 Jul 2022 |
| Building plan approvalFile: Sheet 4.pdf | 12 Jul 2022 |
| Building plan approvalFile: Sheet 5.pdf | 12 Jul 2022 |
| Building plan approvalFile: Sheet 5.pdf | 12 Jul 2022 |
| Building plan approvalFile: Sheet 9.pdf | 12 Jul 2022 |
| Building plan approvalFile: Sheet 9.pdf | 12 Jul 2022 |
| Building plan approvalFile: Sheet 9.pdf | 12 Jul 2022 |
| Copy of Layout Approval (in case of layout)File: Sheet 1.pdf | 12 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 2.pdf | 12 Jul 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Suncity I | Plot No 6-7-8 Dixit Nagar Nagpur | 94 | Completed | Nov 2017 | Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 108 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KUKREJA INFINITY EAST on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Shri. Krishna Nagar2,800+ in Nagpur
Filed coordinates, straight-line distance. 32 registered projects within 2 km.
KUKREJA PARIS CITY-WING C & D
KUKREJA INFRASTRUCTURES
kASTURI HEIGHT
SKY DEVELOPERS AND PROMOTERS INDIA PVT. LT
EASTORIA GRACE
EASTORIA BUILDERS AND DEVLOPERS LLP
SDPL Om
SANDEEP DWELLERS PVT. LTD.
UDYOG VIHAR
ALLIANCE REALITIES
Mauli Nagar - 14 Sector - B
Luvkush Corporation Private Limited
See every Nagpur project, with the district possession charts
Builder: KUKREJA INFRASTRUCTURES
KUKREJA INFRASTRUCTURES has 8 registrations on MahaRERA, including SUNCITY 2 and KUKREJA INFINITY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if KUKREJA INFINITY EAST is delayed beyond 30 Nov 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KUKREJA INFINITY EAST?
The registered promoter entity is KUKREJA INFRASTRUCTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KUKREJA INFINITY EAST?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KUKREJA INFINITY EAST?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KUKREJA INFINITY EAST?
The professionals named in the filing: Architect: Ar Lokesh Kadu; Architect: Ar REZA KABUL; Engineer: Vikrant Chaubey; Chartered Accountant: Vinod Hassani; Chartered Accountant: K.P. Sahasrabudhe & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KUKREJA INFINITY EAST?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback