UMA GREENS

By MURUDESHWAR DEVELOPERS

RG-MH-37997 · RERA P52000019282 · Last updated on MahaRERA portal: 9 May 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 27 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
4 of 11Construction stages donefurthest along: Staircases, 95%
24 of 54Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 120 documents Report an error

UMA GREENS is a Others project by MURUDESHWAR DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000019282 on 15 Jan 2019. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 27 months from the original filing. 30 of the 54 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameUMA GREENS
  • TypeOthers
  • Location
    • NA
    • DRONAGIRI
    • Uran
    • Raigarh
    • 400702
  • Pincode400702
  • RERA no.P52000019282
  • ReraGenie IDRG-MH-37997

Builder

  • NameMURUDESHWAR DEVELOPERS
  • Entity typePartnership
  • PartnersNIRMALA KANTILAL SENGHANI, HIREN KANTILAL SENGHANI, BHAVESH RAVILAL PATEL
  • Other registrations1 more →
  • Completed1 of 2
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

1 months past promisethis monthRegisteredJan 2019First promiseJun 2024Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jan 2019
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed120 files

Current status

56%30 of 54 units booked

Figures as on 9 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UMA GREENSNA171746854

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

UMA GREENS: 84% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)90%
Plinth100%
Stilt Floor85%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed27

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots27
Closed/Covered27

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
VEGA'S ASSOCIATESNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI1795.96
Proposed, not sanctioned1,796 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR-17, VASHI, NAVI MUMBAI - 400 703

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL PATEL
EngineerRAJAN CHANDRAKANT TIPNIS
Chartered AccountantChaplot & Co
Chartered AccountantGanapath Tansukhlal Jain
PartnerRole in project
MURUDESHWAR DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000019057Jun 2024 → Jun 2025

Reason as filed by the promoterthe construction work was delayed due to unfavorable market conditions & low bookings (Sale of under construction units).

EA07052620868Jun 2024 → Sep 2026

Reason as filed by the promoterDelay in Getting Occupancy certificate from Department. Project is completed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jan 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jan 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jan 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jan 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed120

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 Final.pdf9 May 2026
Form 1File: Form-1.pdf20 Aug 2025
Form 2File: Form -2 Uma Greens.pdf20 Aug 2025
Form 3File: Forn -3 murudeshwar_compressed.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold & unsold.pdf20 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 35A-47-DRONAGIRI RERA (2025 MARCH).pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Mar 24.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2024.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 24.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 24.pdf25 Apr 2025
Certificates of CA (Form 3)File: March -2024.pdf25 Apr 2025
Certificates of CA (Form 3)File: Form 3 June - 2024.pdf25 Apr 2025
Certificates of CA (Form 3)File: Form 3 Sep -2024.pdf25 Apr 2025
Certificates of CA (Form 3)File: Form 3 Dec- 2024.pdf25 Apr 2025
Certificates of CA (Form 3)File: Form 3 March -2025.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 2024 engi cert.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2024 engi cert compressed.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep - 2024 engi cert.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec- 2024 engi cert.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 25.pdf25 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM -5.pdf16 Dec 2024
Declaration about Commencement CertificateFile: form D.pdf16 Mar 2024
Declaration in FORM BFile: Form B_compressed.pdf16 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: March-2020.pdf16 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: March-2021.pdf16 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: March-2022.pdf16 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: March-2023.pdf16 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf16 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2018-19_compressed.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2019-20_compressed.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2020-21_compressed.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2021-22_compressed.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2022-23_compressed.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2023-24_compressed.pdf9 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Mar 2019_compressed.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Jun 2019_compressed.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Sep 2019.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Dec 2019_compressed.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Mar 2020_compressed.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 June 2020_compressed.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Sept 2020.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Dec 2020_compressed.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Mar 2021.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Jun 2021_compressed.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Sept 2021_compressed.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 Dec 2021_compressed.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 Mar 2022.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14 Jun 2022_compressed.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 15 Sept 2022_compressed.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 16 Dec 2022.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 17 Mar 2023_compressed.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 18 Jun 2023_compressed.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 19 Sept 2023_compressed.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20 Dec 2023_compressed.pdf5 Feb 2024
Certificates of CA (Form 3)File: 1 Form 3 - Mar19.pdf5 Feb 2024
Certificates of CA (Form 3)File: 2 Form 3 - Jun19.pdf5 Feb 2024
Certificates of CA (Form 3)File: 3 Form 3 - Sept19.pdf5 Feb 2024
Certificates of CA (Form 3)File: 4 Form 3 - Dec19.pdf5 Feb 2024
Certificates of CA (Form 3)File: 5 Form 3 - Mar20.pdf5 Feb 2024
Certificates of CA (Form 3)File: 6 Form 3 - Jun20.pdf5 Feb 2024
Certificates of CA (Form 3)File: 7 Form 3 - Sept20.pdf5 Feb 2024
Certificates of CA (Form 3)File: 8 Form 3 - Dec20.pdf5 Feb 2024
Certificates of CA (Form 3)File: 9 Form 3 - Mar21.pdf5 Feb 2024
Certificates of CA (Form 3)File: 10 Form 3 - Jun21.pdf5 Feb 2024
Certificates of CA (Form 3)File: 11 Form 3 - Sept21.pdf5 Feb 2024
Certificates of CA (Form 3)File: 12 Form 3 - Dec21.pdf5 Feb 2024
Certificates of CA (Form 3)File: 14 Form 3 - Jun22.pdf5 Feb 2024
Certificates of CA (Form 3)File: 15 Form 3 - Sept22.pdf5 Feb 2024
Certificates of CA (Form 3)File: 16 Form 3 - Dec22.pdf5 Feb 2024
Certificates of CA (Form 3)File: 17 Form 3 - Mar23.pdf5 Feb 2024
Certificates of CA (Form 3)File: 18 Form 3 - Jun23.pdf5 Feb 2024
Certificates of CA (Form 3)File: 19 Form 3 - Sept23.pdf5 Feb 2024
Certificates of CA (Form 3)File: 20 Form 3 - Dec23.pdf5 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Murud.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 35A-47-DRONAGIRI RERA Mar 2019.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 35A-47-DRONAGIRI RERA Jun 2019.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 35A-47-DRONAGIRI RERA Jun 2019.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 35A-47-DRONAGIRI RERA Sept 2019.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 35A-47-DRONAGIRI RERA Dec 2019.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 35A-47-DRONAGIRI RERA Mar 2020.pdf2 Feb 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationRegisteredStatusPromisedDelivered
UMA IMPERIALP52000002083NA, RaigarhJul 2017CompletedJun 2022Registered original: Jun 2021Late, May 2023

How this compares with Raigarh

56%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 27 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UMA GREENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DRONAGIRI5,900+ in Raigarh

Builder: MURUDESHWAR DEVELOPERS

MURUDESHWAR DEVELOPERS has 2 registrations on MahaRERA, including UMA IMPERIAL and UMA GREENS. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if UMA GREENS is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UMA GREENS?

The registered promoter entity is MURUDESHWAR DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UMA GREENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for UMA GREENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UMA GREENS?

The professionals named in the filing: Architect: ATUL PATEL; Engineer: RAJAN CHANDRAKANT TIPNIS; Chartered Accountant: Chaplot & Co; Chartered Accountant: Ganapath Tansukhlal Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UMA GREENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UMA GREENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UMA GREENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.