Home / Browse projects / Pune, Maharashtra / UJWAL SHOURYA B WING C WING

Registered No litigation declared Residential / Group Housing project

UJWAL SHOURYA B WING C WING

By UJWAL CONSTRUCTION

RG-MH-19342 · RERA P52100078471 · Last updated on MahaRERA portal: 12 Sep 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2030Possession promisedmoved 4 months from the original
3 of 22Construction stages doneacross 2 buildings; furthest along: Plinth, 80%
39 of 53Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

UJWAL SHOURYA B WING C WING is a Residential / Group Housing project by UJWAL CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100078471 on 17 Dec 2024. Possession is promised by 30 Apr 2030. The completion date has moved by 4 months from the original filing. 14 of the 53 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameUJWAL SHOURYA B WING C WING
  • TypeResidential / Group Housing
  • Location
    • DHAYARI
    • PUNE
    • Dhayari (Part)
    • Haveli
    • 411041
  • Pincode411041
  • RERA no.P52100078471
  • ReraGenie IDRG-MH-19342

Builder

  • NameUJWAL CONSTRUCTION
  • Entity typePartnership
  • PartnersBHUSHAN BHAGWANT ADHAV, SACHIN RANOJI POKLE
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredDec 2024First promiseDec 2029Revised toApr 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Dec 2024
  • Promised completion30 Apr 2030
  • Revised completionRevised to 30 Apr 2030 (originally 31 Dec 2029)
  • Buildings2 building records
  • Documents filed97 files

Current status

26%14 of 53 units booked
70.3%Work done, per cost certificate

Figures as on 12 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UJWAL SHOURYA C WINGNA8828028
WJWAL SHOURYA B WINGNA8825025

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Plinth, at 80%.

UJWAL SHOURYA C WING40%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WJWAL SHOURYA B WING16%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes55%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
UJWAL SHOURYA C WING11
WJWAL SHOURYA B WING11

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jan 2026
LandownerVillageDistrict
KUNDA RAMCHANDRA CHINCHNIKARWadgaon BkPune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI2900.33
Proposed, not sanctioned2,900 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 4 5 6 S NO 30/2A 30/2B FUNTIME VADGOAN BK SINHAGAD ROAD PUNE 411051
Estimated costRs 8.38 cr
Cost incurredRs 5.89 cr
Work done70.31%
BuildingWingEstimatedIncurred
UJWAL SHOURYA C WINGNARs 4.39 crRs 3.93 cr
WJWAL SHOURYA B WINGNARs 3.31 crRs 1.96 cr
-NARs 67.57 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJEEV MURKUTE
ArchitectSANJEEV BHAGWAN MURKUTE
EngineerVAIBHAV TANAJO OHOL
EngineerVAIBHAV TABAJI OHAL
Chartered AccountantA M SADAVARTE & CO
Chartered AccountantASHISH MANGAL SADAVARTE
Chartered AccountantANANT VASUDEVAN IYAR
PartnerRole in project
UJWAL CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52100078471/WarDec 2029 → Apr 2030

Reason as filed by the promoterNA

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600640Ram GawaliUJWAL CONSTRUCTION28/09/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2030

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: FORM 2A 2024_compressed.pdf12 Sep 2026
Form 2A (FY 2025-2026)File: FORM 2A 2025.pdf12 Sep 2026
Form 2A (FY 2026-2027)File: FORM 2A.pdf12 Sep 2026
Withdrawal Update Form 1File: FORM NO 1.pdf20 Jul 2026
Withdrawal Update Form 2File: FORM NO 2.pdf20 Jul 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Jul 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf24 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf24 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf24 Apr 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE form 2.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Jan 2026
Form 1File: Architect Certificate.pdf10 Nov 2025
Form 2File: Engineer Certificate.pdf10 Nov 2025
Form 3File: Form 3 Shourya.pdf10 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD.pdf10 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5.pdf5 Nov 2025
Form 1File: FORM 1.pdf28 Jul 2025
Form 2File: FORM 2.pdf28 Jul 2025
Form 3File: FORM 3.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD INVENTORY.pdf28 Jul 2025
Form 1File: FORM 1.pdf26 May 2025
Form 2File: FORM 2.pdf26 May 2025
Form 3File: FORM 3.pdf26 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD INVENTORY.pdf26 May 2025
Form 1File: FORM 1.pdf14 May 2025
Form 2File: FORM 1.pdf14 May 2025
Disclosure of Sold and Booked InventoryFile: FORM 1.pdf14 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: DECLARATION BANK DETAILS FORMAT B NEW.pdf13 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: DECLARATION BANK DETAILS FORMAT B NEW.pdf13 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: DECLARATION CUM UNDERTAKING (LANDOWNER).pdf9 Dec 2024
Other - FinanceFile: DECLARATION CUM UNDERTAKING (LANDOWNER).pdf9 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: DECLARATION CUM UNDERTAKING (LANDOWNER).pdf9 Dec 2024
Other - FinanceFile: DECLARATION CUM UNDERTAKING (LANDOWNER).pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA DECLARTION.pdf29 Nov 2024
Other - FinanceFile: CA DECLARTION.pdf29 Nov 2024
Other - TechnicalFile: PLINTH CERTIFICATE.pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA DECLARTION.pdf29 Nov 2024
Other - FinanceFile: CA DECLARTION.pdf29 Nov 2024
Other - TechnicalFile: PLINTH CERTIFICATE.pdf29 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about Separate Bank Account NEW.pdf22 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about Separate Bank Account NEW.pdf22 Nov 2024
Other - TechnicalFile: ANNEXURE A (DECLARATION CUM UNDERTAKING).pdf15 Nov 2024
Foreclosure of the ProjectFile: ANNEXURE A (DECLARATION CUM UNDERTAKING).pdf15 Nov 2024
Other - TechnicalFile: ANNEXURE A (DECLARATION CUM UNDERTAKING).pdf15 Nov 2024
Foreclosure of the ProjectFile: ANNEXURE A (DECLARATION CUM UNDERTAKING).pdf15 Nov 2024
Proforma of Agreement for saleFile: AGREEMENT.pdf6 Nov 2024
Proforma of Agreement for saleFile: AGREEMENT.pdf6 Nov 2024
Other - LegalFile: DECLARATION CUM UNDERTAKING (LANDOWNER).pdf28 Oct 2024
Other - TechnicalFile: DECLARATION CUM UNDERTAKING (LANDOWNER).pdf28 Oct 2024
Other - LegalFile: DECLARATION CUM UNDERTAKING (LANDOWNER).pdf28 Oct 2024
Other - TechnicalFile: DECLARATION CUM UNDERTAKING (LANDOWNER).pdf28 Oct 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf23 Oct 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf14 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: DECLARATION SECURED UNSECURED FINANCE.pdf23 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: DECLARATION SECURED UNSECURED FINANCE.pdf23 Jul 2024
PAN CardFile: Pan Card-UJWAL CONSTRUCTION.pdf9 Jul 2024
PAN CardFile: Pan Card-UJWAL CONSTRUCTION.pdf9 Jul 2024
Building plan approvalFile: PLAN - 1.pdf26 Jun 2024
Layout approvalFile: PLAN - 1.pdf26 Jun 2024
Building plan approvalFile: PLAN - 1.pdf26 Jun 2024
Layout approvalFile: PLAN - 1.pdf26 Jun 2024
Copy of the legal title reportFile: SEARCH REPORT.pdf26 Jun 2024
Details of encumbrances concerned to FinanceFile: Declaration Regarding Financial Encumbrances (2 files merged).pdf26 Jun 2024
Copy of Layout Approval (in case of layout)File: PLAN - 1.pdf26 Jun 2024
Declaration in FORM BFile: FORM B.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE form 1.pdf26 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE form 2.pdf26 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf26 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN - 1.pdf26 Jun 2024
Declaration about Commencement CertificateFile: Declaration about Commencement.pdf26 Jun 2024
CERSAI detailsFile: CERSAI_Search_Report_200311518917_For_Asset_Based_Search_26_06_2024_15_19_55_203.pdf26 Jun 2024
Deviation Report with respect to Allotment letterFile: Declaration Regarding Daviation.pdf26 Jun 2024
Details of encumbrances concerned to LegalFile: Declaration Regarding Financial Encumbrances (2 files merged).pdf26 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Declaration Regarding Daviation.pdf26 Jun 2024

How this compares with Pune

26%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UJWAL SHOURYA B WING C WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

Builder: UJWAL CONSTRUCTION

UJWAL CONSTRUCTION has 3 registrations on MahaRERA, including UJWAL VIAAN A WING and UJWAL VIAAN B WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if UJWAL SHOURYA B WING C WING is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UJWAL SHOURYA B WING C WING?

The registered promoter entity is UJWAL CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UJWAL SHOURYA B WING C WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against UJWAL SHOURYA B WING C WING?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for UJWAL SHOURYA B WING C WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UJWAL SHOURYA B WING C WING?

The professionals named in the filing: Architect: SANJEEV MURKUTE; Architect: SANJEEV BHAGWAN MURKUTE; Engineer: VAIBHAV TANAJO OHOL; Engineer: VAIBHAV TABAJI OHAL; Chartered Accountant: A M SADAVARTE & CO; Chartered Accountant: ASHISH MANGAL SADAVARTE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UJWAL SHOURYA B WING C WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UJWAL SHOURYA B WING C WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UJWAL SHOURYA B WING C WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.