Home / Browse projects / Pune, Maharashtra / UDAY
UDAY
RG-MH-22235 · RERA P52100045837 · Last updated on MahaRERA portal: 24 Jun 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
UDAY is a Commercial project by PRIME PRIORITIES UNIT 1 in Pune, Maharashtra, registered with MahaRERA as P52100045837 on 15 Jun 2022. Possession is promised by 31 Mar 2027. The completion date has moved by 36 months from the original filing.
At a glance
Project
- NameUDAY
- TypeCommercial
- Location
- SADASHIV PETH NAGNATH PAR PUNE
- CTS 894 SADASHIV PETH
- Pune (M Corp.)
- Pune City
- Pune
- 411030
- Pincode411030
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100045837
- ReraGenie IDRG-MH-22235
Builder
- NamePRIME PRIORITIES UNIT 1
- Entity typePartnership
- GSTIN27AAZFP2373G1ZO
- PartnersROHAN VIJAYKUMAR DUDHEDIA, SAGAR PRAMOD PUNGALIYA, PRAMOD AMARCHAND PUNGALIYA, BHARAT VASTIMAL SOLANKI, HARSHWARDHAN MAGANLAL PUNGALIYA, SHUBHAM JAYESH PHULPAGAR, VARDHAMAN RAVINDRA PUNGALIYA, DHANPAL SURENDRA SHAH, VASTUPAL SURENDRA SHAH, VILAS SURESH TARWADI
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Jun 2022
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2024)
- Buildings1 building record
- Documents filed81 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| UDAY | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.
UDAY: 42% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 0% |
| Plinth | 90% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 5% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 5% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 5% |
| Energy managemcnt | Yes | 5% |
| Fire protection and fire safety requirements | Yes | 5% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed28
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership10
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| ROHAN DUDHEDIA | Pune (M Corp.) | Pune |
| SAGAR PRAMOD PUNGALIYA | Pune (M Corp.) | Pune |
| HARSHWARDHAN MAGANLAL PUNGALIYA | Pune (M Corp.) | Pune |
| BHARAT VASTIMAL SOLANKI | Pune (M Corp.) | Pune |
| VILAS SURESH TARWADI | Pune (M Corp.) | Pune |
| SHUBHAM JAYESH PHULPAGAR | Pune (M Corp.) | Pune |
| VARDHAMAN RAVINDRA PUNGALIYA | Pune (M Corp.) | Pune |
| DHANPAL SURENDRA SHAH | Pune (M Corp.) | Pune |
| VASTUPAL SURENDRA SHAH | Pune (M Corp.) | Pune |
| PRAMOD AMARCHAND PUNGALIYA | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MR VILAS TARWADI |
| Engineer | MR SIDDHARTH BHANDARI |
| Engineer | Ram Randhave |
| Chartered Accountant | KSHAMA S GUNDI |
| Partner | Role in project |
|---|---|
| PRIME PRIORITIES UNIT 1 | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterdelay in further sanction
Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Jun 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Mar 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 signed.pdf | 24 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A PU-1.pdf | 22 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 12 24 Final Dec 24.pdf | 25 Mar 2025 |
| Layout approvalFile: Layout Approval_11zon.pdf | 19 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: Layout Approval_11zon.pdf | 19 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificates Till 31 12 2024.pdf | 19 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 till 30 06 2024.pdf | 19 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 till 30 09 2024.pdf | 19 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 30 06 24.pdf | 19 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 30 09 24.pdf | 19 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 31 03 24.pdf | 19 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 31 03 24.pdf | 19 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 31 12 24.pdf | 19 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Discolsure of sold unsold inventory.pdf | 19 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (23 _24).pdf | 19 Mar 2025 |
| Declaration in FORM BFile: Dhanpal Surendra Shah .pdf | 17 Mar 2025 |
| Declaration in FORM BFile: Vilas Suresh Tarwadi.pdf | 17 Mar 2025 |
| Declaration in FORM BFile: Vastupal Surendra Shah.pdf | 17 Mar 2025 |
| Declaration in FORM BFile: Vardhaman Ravindra Pungaliya.pdf | 17 Mar 2025 |
| Declaration in FORM BFile: Shubham Jayesh Phulpagar.pdf | 17 Mar 2025 |
| Declaration in FORM BFile: Sagar pungaliya.pdf | 17 Mar 2025 |
| Declaration in FORM BFile: Rohan dudhedia.pdf | 17 Mar 2025 |
| Declaration in FORM BFile: Pramod amarchand Pungaliya.pdf | 17 Mar 2025 |
| Declaration in FORM BFile: Bharat vastimal Solanki.pdf | 17 Mar 2025 |
| Declaration in FORM BFile: Harshawardhan Pungaliya.pdf | 17 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certifiacte.pdf | 16 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf | 16 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A.pdf | 16 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold- booked inventory.pdf | 16 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf | 16 Apr 2024 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 13 Apr 2024 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 13 Apr 2024 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 13 Apr 2024 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 13 Apr 2024 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 13 Apr 2024 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 13 Apr 2024 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 13 Apr 2024 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 13 Apr 2024 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 13 Apr 2024 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 13 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A.pdf | 30 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 21 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 21 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold- booked inventory.pdf | 21 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 21 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Dhanpal Shah - Annexure a.pdf | 21 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Harshavardhan Pungaliya Annexure A.pdf | 21 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Rohan Dudhedia Annexure A.pdf | 21 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Shubham ANNEXURE A.pdf | 21 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5.pdf | 21 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf | 21 Mar 2024 |
| Building plan approvalFile: BUILDING PLAN APPROVAL -1.pdf | 16 Mar 2024 |
| Building plan approvalFile: BUILDING PLAN APPROVAL -2.pdf | 16 Mar 2024 |
| Building plan approvalFile: BUILDING PLAN APROVAL -3.pdf | 16 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN APPROVAL -1.pdf | 16 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN APPROVAL -2.pdf | 16 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN APROVAL -3.pdf | 16 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: cc 894.pdf | 8 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Uday.pdf | 28 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Cert.pdf | 28 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 25-10-2023.pdf | 28 Oct 2023 |
| Proforma of Agreement for saleFile: Sale Deed 1-40_11zon.pdf | 4 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Annual Audit Report 1 - Form 5.pdf | 8 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 11 Jun 2022 |
| Proforma of Allotment letterFile: Allotment Letter-Uday.pdf | 9 Jun 2022 |
| Copy of the legal title reportFile: Tital report_compressed.pdf | 6 Jun 2022 |
| CERSAI detailsFile: CERSAI-UDAY.pdf | 26 May 2022 |
| Building plan approvalFile: Building Plan compressed.pdf | 25 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan compressed.pdf | 25 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-2021.pdf | 25 May 2022 |
| Layout approvalFile: 1,2,3,4 Floor Plan_compressed.pdf | 23 May 2022 |
| Copy of Layout Approval (in case of layout)File: 1,2,3,4 Floor Plan_compressed.pdf | 23 May 2022 |
| Declaration about Commencement CertificateFile: Declaration about commencement Certificate.pdf | 23 May 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_compressed.pdf | 20 May 2022 |
| Proforma of Allotment letterFile: Sale Deed 1-40_11zon.pdf | 20 May 2022 |
| Proforma of Allotment letterFile: Sale Deed 41- 91_11zon.pdf | 20 May 2022 |
| Declaration in FORM BFile: Form 'B' Unit 1.pdf | 6 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 31 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_11zon.pdf | 31 Aug 2021 |
| Details of encumbrancesFile: Encumbrance Certificate.pdf | 28 Aug 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PRIME TEJASYA | SHIVTIRTHNAGAR NR ROHAN CORNER KOTHRUD | 1 | Completed | Sep 2020 | Aug 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 81 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep UDAY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CTS 894 SADASHIV PETH13,700+ in Pune
Filed coordinates, straight-line distance. 493 registered projects within 2 km.
NYATI EVANIA
NYATI CONSTRUCTION PRIVATE LIMITED
CENTRALVISTA
NAIKNAVARE DEVELOPERS PVT. LTD.
Guardian Cityscapes Phase-3
Guardian Homes Private Limited
SARASNAGAR
CITY ETHERNAL LLP
PROFITBAY
LAXMI SPACECON LLP
SUN GLORY
Jindal Mittal Graha Nirman Pvt. Ltd.
Builder: PRIME PRIORITIES UNIT 1
PRIME PRIORITIES UNIT 1 has 1 registration on MahaRERA, including UDAY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if UDAY is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of UDAY?
The registered promoter entity is PRIME PRIORITIES UNIT 1, a partnership as per the filing. Its GSTIN 27AAZFP2373G1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in UDAY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for UDAY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at UDAY?
The professionals named in the filing: Architect: MR VILAS TARWADI; Engineer: MR SIDDHARTH BHANDARI; Engineer: Ram Randhave; Chartered Accountant: KSHAMA S GUNDI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in UDAY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback