Home / Browse projects / Thane, Maharashtra / Tycoons Square Avenue I Tower D
Tycoons Square Avenue I Tower D
By Tycoons Avanti Projects LLP
RG-MH-21710 · RERA P51700023614 · Last updated on MahaRERA portal: 23 Aug 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 12 months past the filed date
- 19 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 3 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Tycoons Square Avenue I Tower D is a Others project by Tycoons Avanti Projects LLP in Thane, Maharashtra, registered with MahaRERA as P51700023614 on 20 Dec 2019. Possession was promised by 30 Oct 2025 and is now 12 months past that date. 19 complaints are on record with the regulator.
At a glance
Project
- NameTycoons Square Avenue I Tower D
- TypeOthers
- Location
- Birla College Road
- Chikanghar
- Kalyan
- Thane
- 421301
- Pincode421301
- RERA no.P51700023614
- ReraGenie IDRG-MH-21710
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on20 Dec 2019
- Promised completion30 Oct 2025
- Revised completionNone
- Buildings1 building record
- Documents filed76 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tycoons Goldmine Avenue I D | NA | 34 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 23%.
Tycoons Goldmine Avenue I D: 48% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 23% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 23 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| Club House only for residential units | Yes | 0% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership6
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Chikanghar Tiranga Co-operative Housing Societies | Kalyan | Thane |
| Chikanghar Trilok Co-operative Housing Societies | Kalyan | Thane |
| Gajanan Co-operative Housing Society | Kalyan | Thane |
| Chikanghar Tiranga CHSL | Chikanghar | Thane |
| Chikanghar Trilok CHSL | Chikanghar | Thane |
| Gajanan CHSL | Chikanghar | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Design Consortium |
| Architect | Lokhandwalla F T |
| Engineer | Vastech Consultants & Engineers LLP |
| Chartered Accountant | Amrrita Jagnaani |
| Chartered Accountant | Tausif Shaikh |
| Chartered Accountant | Venkat Raghunath chari |
| Chartered Accountant | MOK & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Tycoons Avanti Projects Pvt. Ltd. | - |
Complaints filed with MahaRERA19
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000220697 | ASHISH CHANDRAKANT BARHATE | SHRIKANT SHITOLE OF TYCOONS AVANTI PROJECTS LLP | 15/04/2022 |
| CC006000000439621 | AMRUTA PRAMOD PASHTE | TYCOONS AVANTI PROJECT LLP | 07/04/2024 |
| CC12504272 | Jaywant Kulkarni | Tycoons Avanti Projects LLP | 03/12/2025 |
| CC12504273 | Hemalata Marathe | Tycoons Avanti Projects LLP | 03/12/2025 |
| CC12504301 | Ankush Banubakode | Tycoons Avanti Projects LLP | 05/12/2025 |
| CC12504355 | Nitin Bhangare | Tycoons Avanti Projects LLP | 08/12/2025 |
| CC12504356 | Swapnil Jawale | Tycoons Avanti Projects LLP | 08/12/2025 |
| CC12504459 | Kundan Nannavare | Tycoons Avanti Projects LLP | 14/12/2025 |
| CC12504464 | Rohit Shakya | Tycoons Avanti Projects LLP | 14/12/2025 |
| CC12504465 | Prashant Wani | Tycoons Avanti Projects LLP | 14/12/2025 |
| CC12504466 | Prashant Thombe | Tycoons Avanti Projects LLP | 14/12/2025 |
| CC12600456 | Sumeetee Sinha | Tycoons Avanti Projects LLP | 25/01/2026 |
| CC12602898 | Mandar Joshi | Tycoons Avanti Projects Pvt. Ltd. | 17/05/2026 |
| CC12602899 | Sameer Joshi | Tycoons Avanti Projects Pvt. Ltd. | 17/05/2026 |
| CC12602900 | Vivek Chaudhari | Tycoons Avanti Projects Pvt. Ltd. | 17/05/2026 |
| CC12602901 | Prakash Pansare | Tycoons Avanti Projects Pvt. Ltd. | 17/05/2026 |
| CC12602902 | Indrajit Borikar | Tycoons Avanti Projects Pvt. Ltd. | 17/05/2026 |
| CC12602904 | Mrityunjay Singh | Tycoons Avanti Projects Pvt. Ltd. | 17/05/2026 |
| CC12602905 | Shridhar Kadam | Tycoons Avanti Projects Pvt. Ltd. | 17/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Dec 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Apr 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Dec 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed76
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: ARCH CERT ZONE 1 D 18-10-2019.pdf | 23 Aug 2025 |
| Form 2File: Tower D Engg Certificate sale _compressed 05-11-2019.pdf | 23 Aug 2025 |
| Form 3File: Form 3 30-09-2019.pdf | 23 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of SOld-Booked Inventory dtd 16-06-2021.pdf | 23 Aug 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration for QPR I D.pdf | 23 Aug 2025 |
| Form 1File: ARCH CERT ZONE 1 D 18-10-2019.pdf | 23 Aug 2025 |
| Form 2File: Tower D Engg Certificate sale _compressed 05-11-2019.pdf | 23 Aug 2025 |
| Form 3File: Form 3 30-09-2019.pdf | 23 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of SOld-Booked Inventory dtd 16-06-2021.pdf | 23 Aug 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration for QPR I D.pdf | 23 Aug 2025 |
| Form 1File: ARCH CERT ZONE 1 D 18-10-2019.pdf | 23 Aug 2025 |
| Form 2File: Tower D Engg Certificate sale _compressed 05-11-2019.pdf | 23 Aug 2025 |
| Form 3File: Form 3 30-09-2019.pdf | 23 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of SOld-Booked Inventory dtd 16-06-2021.pdf | 23 Aug 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration for QPR I D.pdf | 23 Aug 2025 |
| Form 1File: ARCH CERT ZONE 1 D 18-10-2019.pdf | 23 Aug 2025 |
| Form 2File: Tower D Engg Certificate sale _compressed 05-11-2019.pdf | 23 Aug 2025 |
| Form 3File: Form 3 30-09-2019.pdf | 23 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of SOld-Booked Inventory dtd 16-06-2021.pdf | 23 Aug 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration for QPR I D.pdf | 23 Aug 2025 |
| Form 1File: ARCH CERT ZONE 1 D 18-10-2019.pdf | 23 Aug 2025 |
| Form 2File: Tower D Engg Certificate sale _compressed 05-11-2019.pdf | 23 Aug 2025 |
| Form 3File: Form 3 30-09-2019.pdf | 23 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of SOld-Booked Inventory dtd 16-06-2021.pdf | 23 Aug 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration for QPR I D.pdf | 23 Aug 2025 |
| Form 1File: ARCH CERT ZONE 1 D 18-10-2019.pdf | 23 Aug 2025 |
| Form 2File: Tower D Engg Certificate sale _compressed 05-11-2019.pdf | 23 Aug 2025 |
| Form 3File: Form 3 30-09-2019.pdf | 23 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of SOld-Booked Inventory dtd 16-06-2021.pdf | 23 Aug 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration for QPR I D.pdf | 23 Aug 2025 |
| Form 5 (FY 2019-2020)File: Form 5 (1).pdf | 4 Aug 2025 |
| Form 5 (FY 2020-2021)File: Form 5 (2).pdf | 4 Aug 2025 |
| Form 5 (FY 2021-2022)File: Form 5 (3).pdf | 4 Aug 2025 |
| Form 5 (FY 2022-2023)File: Form 5 (4).pdf | 4 Aug 2025 |
| Form 5 (FY 2023-2024)File: Form 5 (5).pdf | 4 Aug 2025 |
| Form 5 (FY 2024-2025)File: Form 5 (6).pdf | 4 Aug 2025 |
| Form 2A (FY 2019-2020)File: Form 2A.pdf | 1 Aug 2025 |
| Form 2A (FY 2020-2021)File: Form 2A (1).pdf | 1 Aug 2025 |
| Form 2A (FY 2021-2022)File: Form 2A (2).pdf | 1 Aug 2025 |
| Form 2A (FY 2022-2023)File: Form 2A (3).pdf | 1 Aug 2025 |
| Form 2A (FY 2023-2024)File: Form 2A (4).pdf | 1 Aug 2025 |
| Form 2A (FY 2024-2025) | 1 Aug 2025 |
| Form 2A (FY 2024-2025)File: Form 2A (5).pdf | 1 Aug 2025 |
| Form 2A (FY 2025-2026)File: Form 2A (6).pdf | 1 Aug 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Avenue I Tower D 21-22.PDF | 23 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Aveune I Tower D 21-22 New.PDF | 4 Nov 2022 |
| Layout approvalFile: 4 Mhada Layout 1988.pdf | 19 Apr 2022 |
| Layout approvalFile: MHADA Layout 2014.pdf | 19 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: 4 Mhada Layout 1988.pdf | 19 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: MHADA Layout 2014.pdf | 19 Apr 2022 |
| Building plan approvalFile: Layout dtd 24-9-21.pdf | 29 Dec 2021 |
| Layout approvalFile: 21-02-2019.pdf | 29 Dec 2021 |
| Layout approvalFile: Layout dtd 24-9-21.pdf | 29 Dec 2021 |
| Copy of Layout Approval (in case of layout)File: 21-02-2019.pdf | 29 Dec 2021 |
| Copy of Layout Approval (in case of layout)File: Layout dtd 24-9-21.pdf | 29 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout dtd 24-9-21.pdf | 29 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 ID 20-21.pdf | 3 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Avenue-I Tower D 2019-2020_compressed.pdf | 16 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Avenue-I Tower D 2020-2021_compressed.pdf | 16 Nov 2021 |
| Declaration about Commencement CertificateFile: Declaration abt CC - ID.PDF | 15 Nov 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencemnet Certificate.pdf | 28 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: TAPL Form 5 Avenue I D 19-20.pdf | 25 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold-booked inventory-AvenueI Tower D_compressed.pdf | 16 Jun 2021 |
| Declaration in FORM BFile: Form B.pdf | 7 Dec 2019 |
| Building plan approvalFile: Layout 06-08-2019.pdf | 6 Dec 2019 |
| Copy of the legal title reportFile: Title Report 1.pdf | 6 Dec 2019 |
| Copy of the legal title reportFile: Title Report 2.pdf | 6 Dec 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout 06-08-2019.pdf | 6 Dec 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised CC 06-08-2019.pdf | 6 Dec 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 6 Dec 2019 |
| Proforma of Allotment letterFile: Declaration for FSA.pdf | 6 Dec 2019 |
| OtherFile: ANWAR.pdf | 6 Dec 2019 |
| Layout approvalFile: Layout 06-08-2019.pdf | 30 Nov 2019 |
| PAN CardFile: TAPL Pan card.pdf | 30 Nov 2019 |
| Details of encumbrancesFile: Encumbrance Certificate Avenue I D.pdf | 30 Nov 2019 |
| Copy of Layout Approval (in case of layout)File: Layout 06-08-2019.pdf | 30 Nov 2019 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Tycoons Solitaire Phase-I | Kalyan-West | 103 | Completed | Jul 2017 | Jul 2017 |
| Spring avenue | kalyan-west | 14 | Completed | Sep 2011 | Sep 2011 |
| Tycoons Residency | kalyan -west | 48 | Completed | Jul 2011 | Jul 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations, which the RERA portal never shows together
- All 76 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Tycoons Square Avenue I Tower D on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chikanghar7,600+ in Thane
PODDAR RIVIERA PHASE - I
Poddar Housing and Development Limited
Sinhagad by Bhagwati Haware - Wing - B
Bhagwati Haware Properties Supertech
Pratapgad by Bhagwati Haware - Wing - C
Bhagwati Haware Properties Supertech
Rajgad by Bhagwati Haware - Wing - D
Bhagwati Haware Properties Supertech
PODDAR RIVIERA PHASE - III
Poddar Housing and Development Limited
THARWANI PARKGLEN PHASE I
THARWANI REALTORS
See every Thane project, with the district possession charts
Builder: Tycoons Avanti Projects LLP
Tycoons Avanti Projects LLP has 7 registrations on MahaRERA, including Tycoons Square Avenue I Tower B and Tycoons Square Avenue I Tower C. Its filings disclose 7 earlier MahaRERA projects: declares 7 of 7 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that Tycoons Square Avenue I Tower D shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Tycoons Square Avenue I Tower D is delayed beyond 30 Oct 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Tycoons Square Avenue I Tower D?
The registered promoter entity is Tycoons Avanti Projects LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Tycoons Square Avenue I Tower D?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Tycoons Square Avenue I Tower D?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Tycoons Square Avenue I Tower D?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Tycoons Square Avenue I Tower D?
The professionals named in the filing: Architect: Design Consortium; Architect: Lokhandwalla F T; Engineer: Vastech Consultants & Engineers LLP; Chartered Accountant: Amrrita Jagnaani; Chartered Accountant: Tausif Shaikh; Chartered Accountant: Venkat Raghunath chari. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Tycoons Square Avenue I Tower D?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback