ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Tulsi Vrundavan

Registered No litigation declared Residential / Group Housing project

Tulsi Vrundavan

By Tulsi Builders and Developers

RG-MH-05384 · RERA P51700051177 · Last updated on MahaRERA portal: 16 Oct 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • No extension sought by the promoter; the date moved only under MahaRERA's automatic 4-month extension
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedmoved 4 months by MahaRERA order
31 of 55Construction stages doneacross 5 buildings; furthest along: Installation of Lifts, 90%
135 of 287Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

Tulsi Vrundavan is a Residential / Group Housing project by Tulsi Builders and Developers in Thane, Maharashtra, registered with MahaRERA as P51700051177 on 1 Jun 2023. Possession is promised by 30 Jan 2027. The completion date has moved by 4 months under MahaRERA's automatic 4-month extension for the West Asia conflict, which the promoter did not apply for. 152 of the 287 units on this registration are recorded sold or booked, and 31 of 55 construction stages are filed complete.

At a glance

Project

  • NameTulsi Vrundavan
  • TypeResidential / Group Housing
  • Location
    • Vangani Road
    • Near Vangani Railway Station
    • Vangani (CT)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700051177
  • ReraGenie IDRG-MH-05384

Builder

  • NameTulsi Builders and Developers
  • Entity typePartnership
  • GSTIN27AAGFT8091G1ZS
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersTrupesh Bhavan Patel, Mahadev Prabhat Patel, Pravin Ravjibhai Patel, Paresh Patel
  • Other registrations4 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredJun 2023First promiseSep 2026Revised toJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Jun 2023
  • Promised completion30 Jan 2027
  • Revised completionRevised to 30 Jan 2027 (originally 30 Sep 2026)
  • Buildings5 building records
  • Documents filed74 files

Current status

53%152 of 287 units booked
81.2%Work done, per cost certificate

Figures as on 16 Oct 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA8870070
Wing BNA8842042
Wing CNA8856056
Wing DNA8877077
Wing ENA8842042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 16 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

31 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Installation of Lifts, at 90%.

Wing A73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing B72%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Wing C72%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Wing D39%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing E50%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Closed/Covered5
BuildingClosed/CoveredTotal
Wing A11
Wing B11
Wing C11
Wing D11
Wing E11

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,825 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Oct 2026
LandownerVillageDistrict
Ramakant ShelarVangani (CT)Thane

Approvals and building plan

Sanctioning authorityKBMC
Permissible FSI14076.79
Proposed, not sanctioned14,077 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKatrap Road, Badlapur East
Estimated costRs 30.67 cr
Cost incurredRs 24.91 cr
Work done81.24%
BuildingWingEstimatedIncurred
Wing DNARs 7.57 crRs 4.71 cr
Wing ANARs 6.50 crRs 6.50 cr
Wing CNARs 5.77 crRs 5.63 cr
Wing ENARs 4.59 crRs 3.42 cr
Wing BNARs 4.28 crRs 4.28 cr
-NARs 1.96 crRs 36.50 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRaj Associates (Ar. S R Khambayat)
EngineerER. Kamlesh R Patel
EngineerParth Patel
Chartered AccountantCA Ganapath jain
Chartered AccountantCA Rajendra Chaplot Partner of Chaplot & Co
PartnerRole in project
Tulsi Builders and Developers-

Extensions1

A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.

MahaRERA order of 7 Aug 2026Sep 2026 → Jan 2027

Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.

Litigation declared1

CaseCourtStatus
8726/2019High CourtApplication been rejected by the Honble CJID Ulhasnagar

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jan 2027

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5.pdf16 Oct 2026
Form 2A (FY 2024-2025)File: FORM-2A 2024 Tulsi Vrundavan.pdf9 Oct 2026
Form 2A (FY 2025-2026)File: FORM-2A 2026.pdf9 Oct 2026
Withdrawal Update Form 1File: FORM-1_Q1-26-27.pdf23 Jul 2026
Withdrawal Update Form 2File: FORM-2_Q1-26-27.pdf23 Jul 2026
Withdrawal Update Form 3File: FORM 3_Q1-26-27_compressed.pdf23 Jul 2026
Withdrawal Update Form 1File: FORM-1 Q4_2026 Vrudavan.pdf8 May 2026
Withdrawal Update Form 2File: FORM-2 Q4_2026 Vrundavan.pdf8 May 2026
Withdrawal Update Form 3File: FORM-3 Q4_2026 Vrundavan.pdf8 May 2026
Form 5 (FY 2024-2025)File: Form 5-24-25.pdf29 Jan 2026
Withdrawal Update Form 1File: FORM- 1 Vrundavan Q3.pdf23 Jan 2026
Withdrawal Update Form 2File: FORM-2 Q3 VRUNDAVAN.pdf23 Jan 2026
Withdrawal Update Form 3File: FORM-3 Vrundvan Q3_compressed.pdf23 Jan 2026
Withdrawal Update Form 1File: Form 1 - 31st March2024_compressed.pdf16 Dec 2025
Withdrawal Update Form 1File: Form 1 - 31st March2024_compressed.pdf16 Dec 2025
Withdrawal Update Form 2File: FORM-2 MARCH-2024 Vrundavan.pdf16 Dec 2025
Withdrawal Update Form 2File: FORM-2 MARCH-2024 Vrundavan.pdf16 Dec 2025
Withdrawal Update Form 3File: Form 3 31 03 2024_compressed.pdf16 Dec 2025
Withdrawal Update Form 3File: Form 3 31 03 2024_compressed.pdf16 Dec 2025
Form 1File: FORM-1 Q1 Vrundavan.pdf2 Aug 2025
Form 2File: FORM-2 Q1 Vrundavan.pdf2 Aug 2025
Form 3File: FORM-3 Q1 Vrundavan_compressed.pdf2 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Tulsi Builders & Developers..pdf2 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 March 2025.pdf1 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 March 2025_compressed.pdf1 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Q3 Vrundvan.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 Q3 Vrundvan_compressed.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Q1.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Q2.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 Q2.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Q2.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Q2.pdf16 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: TBD Form-05.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 DEC-2023 Vrundavan.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 31st March2024_compressed.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 DEC-2023.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 MARCH-2024 Vrundavan.pdf7 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31 12 2023_compressed.pdf7 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31 03 2024_compressed.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 -TBD.pdf1 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-TBD_compressed.pdf1 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 June 2023_compressed.pdf11 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf11 Oct 2023
Copy of the legal title reportFile: Title_compressed.pdf23 May 2023
Other - LegalFile: Covering letter.pdf19 May 2023
Other - LegalFile: Title_compressed.pdf19 May 2023
Other - LegalFile: 7-12.pdf19 May 2023
Other - LegalFile: Death certificate.pdf19 May 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Order Collectors _compressed (1).pdf28 Apr 2023
Declaration about Commencement CertificateFile: Form D.pdf28 Apr 2023
CERSAI detailsFile: No Interest Created Certificate.pdf12 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Int Declaration-Pravin.pdf8 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Scan 8 Apr 2023.pdf8 Apr 2023
Layout approvalFile: Layout Approval_compressed.pdf7 Apr 2023
Building plan approvalFile: Building Plan 1_compressed.pdf7 Apr 2023
Building plan approvalFile: Building Plan 2_compressed.pdf7 Apr 2023
PAN CardFile: Pan Card.pdf7 Apr 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf7 Apr 2023
Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf7 Apr 2023
Copy of Layout Approval (in case of layout)File: Layout Approval_compressed.pdf7 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1_compressed.pdf7 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2_compressed.pdf7 Apr 2023
Declaration in FORM BFile: Form B_compressed.pdf7 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200265646257_For_Asset_Based_Search_07_04_2023_19_11_02_042.pdf7 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf7 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Tulsi Builders and Developers Disclosure of Interest Paresh Patel.pdf7 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Tulsi Builders and Developers Disclosure of Interest Trupesh Patel.pdf7 Apr 2023
Proforma of Agreement for saleFile: Proforma Sale.pdf7 Apr 2023
Proforma of Allotment letterFile: Proforma ALlotment.pdf7 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration.pdf7 Apr 2023
Deviation Report with respect to Allotment letterFile: No Deviation-Allotment.pdf7 Apr 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation-Agreement.pdf7 Apr 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Tulsi VandanPM1330002600741Vangani, Thane148Jun 2026OngoingDec 2030Not due yet
Tulsi VirajPM1330002501256Vangani, Thane394Oct 2025OngoingDec 2029Not due yet

How this compares with Thane

53%of this project is bookeddistrict median 24%
25%of Thane projects moved their completion datethis one moved by 4 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,700+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Tulsi Vrundavan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Vangani Railway Station7,700+ in Thane

2 kmTulsi VrundavanCompleted 2Lapsed / revoked 8Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: Tulsi Builders and Developers

Tulsi Builders and Developers has 5 registrations on MahaRERA, including Tulsi Vrundavan and Tulsi Viraj. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Tulsi Vrundavan is delayed beyond 30 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tulsi Vrundavan?

The registered promoter entity is Tulsi Builders and Developers, a partnership as per the filing. Its GSTIN 27AAGFT8091G1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tulsi Vrundavan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Tulsi Vrundavan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tulsi Vrundavan?

The professionals named in the filing: Architect: Raj Associates (Ar. S R Khambayat); Engineer: ER. Kamlesh R Patel; Engineer: Parth Patel; Chartered Accountant: CA Ganapath jain; Chartered Accountant: CA Rajendra Chaplot Partner of Chaplot & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tulsi Vrundavan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tulsi Vrundavan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tulsi Vrundavan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.