Home / Browse projects / Raigarh, Maharashtra / TULSI POOJA

Completed No litigation declared Residential / Group Housing project

TULSI POOJA

By SHREE SAMARTH BUILDCOM

RG-MH-25392 · RERA P52000005441 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 60 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0 of 19Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

TULSI POOJA is a Residential / Group Housing project by SHREE SAMARTH BUILDCOM in Raigarh, Maharashtra, registered with MahaRERA as P52000005441 on 11 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 60 months from the original filing. 19 of the 19 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameTULSI POOJA
  • TypeResidential / Group Housing
  • Location
    • TULSI POOJA
    • PLOT 7 SECTOR 52 DRONAGIRI
    • Panje
    • Uran
    • Raigarh
    • 400702
  • Pincode400702
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000005441
  • ReraGenie IDRG-MH-25392

Builder

  • NameSHREE SAMARTH BUILDCOM
  • Entity typePartnership
  • PartnersMAHESH DAHYABHAI PATEL, SATISHKUMAR RATILAL PATEL, PIYUSH PUNJABHAI PATEL, HARSHADKUMAR NARSINHBHAI PATEL, MEHUL RAMANBHAI PATEL, DINESH NARANBHAI PATEL, DEVJIBHAI NARANBHAI PATEL, SURESH NATVARLAL PATEL, JAGDISH RATILAL PATEL

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Aug 2017
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed77 files

Current status

100%19 of 19 units booked
100.0%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TULSI POOJANA5516319

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

TULSI POOJA: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area300 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Apr 2026

Approvals and building plan

Sanctioning authorityCIDCO LTD
Permissible FSI933.67
Proposed, not sanctioned934 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT-15, SEC-19, SHOP-S1,2 AND3, KHARGHAR NAVI MUMBAI-410210
Estimated costRs 2.25 cr
Cost incurredRs 2.25 cr
Work done100.0%
BuildingWingEstimatedIncurred
TULSI POOJANARs 2.19 crRs 2.19 cr
-NARs 5.42 lakhRs 5.42 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANAND GAIKWAD
EngineerKB CONSULTANTS
Chartered AccountantJAYESH VASANTLAL SATRA
PartnerRole in project
SHREE SAMARTH BUILDCOM-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000010282Jun 2021 → Jun 2022

Reason as filed by the promoterTHE PROJECT NAMED ‘’TULSI POOJA’’ constructed by M/s.SHREE SAMARTH BUILDCOM has been 100% completed as on 09/10/2019 [ copy of ARCHITECT’S certificate ] has been attached. New law for seeking Environmental clearance was introduced retrospectively which was unanticipated at the commencement of the construction of the aforesaid project. Further, no proper and clear authority has been designated for granting such clearance resulting in delay of the project. Inorder to obtain the said clearance application was made to THE ADDITIONAL CHIEF SECRETARY,ENVIRONMENT DEPT.,MANTRALAY,MUMBAI [ dated 09/12/

EXT52000017074Jun 2021 → Jun 2026

Reason as filed by the promoterWe want Extension for upto 30/06/2026. we want extension for the following reason. Firm had applied for Occupation certificate to CIDCO authority on 21/10/2019 but CIDCO authority had refused the proposed application on dt :24/10/2019 by saying reason as : Firm’s plot have been affected by CRZ via notification of 2011and hence clarification / clearance is required from MCZMA. Since firm’s plot is in CRZ as per new notification , proposal for Occupation certificate was refused by CIDCO Planning Authority. We will submit as soon as we will received Occupation Certificate from CIDCO ltd. Sir, Ple

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Dec 2020

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_07 01 2026.pdf27 Apr 2026
Withdrawal Update Form 1File: FORM 1_07 01 2026.pdf27 Apr 2026
Withdrawal Update Form 1File: FORM 1_07 01 2026.pdf27 Apr 2026
Withdrawal Update Form 1File: FORM 1_07 01 2026.pdf27 Apr 2026
Withdrawal Update Form 1File: FORM 1_07 01 2026.pdf27 Apr 2026
Withdrawal Update Form 1File: FORM 1_07 01 2026.pdf27 Apr 2026
Withdrawal Update Form 2File: CERTIFICATE OF COST INCURRED (1).pdf27 Apr 2026
Withdrawal Update Form 2File: CERTIFICATE OF COST INCURRED (1).pdf27 Apr 2026
Withdrawal Update Form 2File: CERTIFICATE OF COST INCURRED (1).pdf27 Apr 2026
Withdrawal Update Form 2File: CERTIFICATE OF COST INCURRED (1).pdf27 Apr 2026
Withdrawal Update Form 2File: CERTIFICATE OF COST INCURRED (1).pdf27 Apr 2026
Withdrawal Update Form 2File: CERTIFICATE OF COST INCURRED (1).pdf27 Apr 2026
Withdrawal Update Form 3File: form no 3 shree samarth buildcon.pdf27 Apr 2026
Withdrawal Update Form 3File: form no 3 shree samarth buildcon.pdf27 Apr 2026
Withdrawal Update Form 3File: form no 3 shree samarth buildcon.pdf27 Apr 2026
Withdrawal Update Form 3File: form no 3 shree samarth buildcon.pdf27 Apr 2026
Withdrawal Update Form 3File: form no 3 shree samarth buildcon.pdf27 Apr 2026
Withdrawal Update Form 3File: form no 3 shree samarth buildcon.pdf27 Apr 2026
Certificates of CA (Form 3)File: Samarth Buildcom Form no - 03_11zon.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT FORM 1.pdf19 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RCC FORM 2.pdf19 Feb 2025
Declaration in FORM BFile: form B_13072023.pdf19 Jul 2023
Declaration in FORM BFile: form B_13072023.pdf13 Jul 2023
Disclosure of sold/ booked inventoryFile: sold inventory_13072023.pdf13 Jul 2023
OtherFile: sold inventory_13072023.pdf13 Jul 2023
OtherFile: form B_13072023.pdf13 Jul 2023
Other - TechnicalFile: Application for Extension.pdf30 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form no 5 march 2022.pdf26 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 march 2023.pdf26 Jun 2023
Details of encumbrances concerned to FinanceFile: no litigation.pdf21 Jun 2023
Details of encumbrances concerned to LegalFile: no litigation.pdf21 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A March 2022.pdf21 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A March 2023.pdf21 Jun 2023
CERSAI detailsFile: no security interest.pdf21 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: no security interest.pdf21 Jun 2023
Proforma of Agreement for saleFile: DRAFT FOR AGRREMENT FOR SALE.pdf21 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: sperate bank account.pdf21 Jun 2023
Deviation Report with respect to Allotment letterFile: no deviation v.pdf21 Jun 2023
Deviation Report with respect to model copy of AgreementFile: no deviation v.pdf21 Jun 2023
Other - FinanceFile: no security interest.pdf21 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 RERA AUDIT-compressed.pdf15 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 RERA AUDIT-compressed.pdf15 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: from 5 s account.pdf13 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: UDIN No.pdf13 Sep 2021
Declaration about Commencement CertificateFile: declaration certificate.pdf3 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: RCC Engineer certificate.pdf3 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RCC Engineer certificate.pdf3 Sep 2021
Disclosure of sold/ booked inventoryFile: sold -unsold inventory.pdf3 Sep 2021
Details of Restarting of Construction work post lockdownFile: construction work lockdown.pdf3 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SHREE SAMARTH BUILDCOM.pdf29 Dec 2020
OtherFile: ARCHITECT COMPLETION CERTIFICATE - SHREE SAMARTH BUILDCOM.pdf29 Dec 2020
Certificates of CA (Form 5)File: FORM 5.pdf28 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CERTIFICATE OF PER OF COMPETION (1).pdf7 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CERTIFICATE OF COST INCURRED (1).pdf7 Jun 2018
Certificates of CA (Form 3)File: FORM-03.pdf7 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT.pdf16 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KB CONS.pdf16 Feb 2018
Certificates of CA (Form 3)File: JVS.pdf16 Feb 2018
Building plan approvalFile: allotment letter 752.pdf28 Jul 2017
Building plan approvalFile: CC.pdf28 Jul 2017
Layout approvalFile: approved plan1.pdf28 Jul 2017
PAN CardFile: firm pancard.pdf28 Jul 2017
Copy of the legal title reportFile: Tital Search.pdf28 Jul 2017
Details of encumbrancesFile: CERTIFICATE_7-52_RERA.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: approved plan1.pdf28 Jul 2017
Building Plan Approval (IOD)File: CC.pdf28 Jul 2017
Building Plan Approval (IOD)File: allotment letter 752.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: plinth cc.pdf28 Jul 2017
Declaration in FORM BFile: AFFIDAVIT_CUM_DECLARATION_7-52_RERA.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect_RERA_certificate1.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect_RERA_certificate.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_Consultant_RERA_Certificate1.pdf28 Jul 2017
Certificates of CA (Form 3)File: FORM 3.pdf28 Jul 2017
Proforma of Allotment letterFile: agreement for sale.pdf28 Jul 2017
OtherFile: aggrement to lease 752.pdf28 Jul 2017
OtherFile: tripartee agreement.pdf28 Jul 2017
OtherFile: old tripartati 752 (1).pdf28 Jul 2017

How this compares with Raigarh

100%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 60 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TULSI POOJA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PLOT 7 SECTOR 52 DRONAGIRI5,900+ in Raigarh

2 kmTULSI POOJACompleted 5Lapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: SHREE SAMARTH BUILDCOM

SHREE SAMARTH BUILDCOM has 1 registration on MahaRERA, including TULSI POOJA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if TULSI POOJA is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TULSI POOJA?

The registered promoter entity is SHREE SAMARTH BUILDCOM, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TULSI POOJA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TULSI POOJA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TULSI POOJA?

The professionals named in the filing: Architect: ANAND GAIKWAD; Engineer: KB CONSULTANTS; Chartered Accountant: JAYESH VASANTLAL SATRA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TULSI POOJA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TULSI POOJA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TULSI POOJA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.