Home / Browse projects / Thane, Maharashtra / Tulsi Aagman

Completed No litigation declared Others project

Tulsi Aagman

By RAJ GROUP

RG-MH-96682 · RERA P51700030491 · Last updated on MahaRERA portal: 6 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2025Possession promisedregistration recorded completed
15 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 90%
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

Tulsi Aagman is a Others project by RAJ GROUP in Thane, Maharashtra, registered with MahaRERA as P51700030491 on 25 Aug 2021. The registration is recorded completed; possession was promised by 30 Apr 2025.

At a glance

Project

  • NameTulsi Aagman
  • TypeOthers
  • Location
    • Kharvai
    • Badlapur
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700030491
  • ReraGenie IDRG-MH-96682

Builder

  • NameRAJ GROUP
  • Entity typePartnership
  • PartnersPRAVIN RAVJIBHAI PATEL, SANJAY ATMARAM PATEL, PANKAJ MANIBHAI PATEL, DINESH RAVJIBHAI PATEL, KIRITBHAI RAVJI PATEL, BHAVAN RAVJI PATEL, SANKET SHANTILAL PATEL, BHARAT GANGARAM PATEL, RAMAN JIVRAJ PATEL, PANKAJ SURESHBHAI PATEL, VALLABH KARSAN PATEL, KHIMJI NARSHI BERA
  • Other registrations6 more →
  • Completed5 of 7
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2021PromisedApr 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Aug 2021
  • Promised completion30 Apr 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed61 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No-1NA30000
Building No-2NA170000
Building No-3NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 6 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 90%.

Building No-138%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No-230%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure35%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No-381%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 6 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,270 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI17916.63
Proposed, not sanctioned17,917 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKulgaon Badlapur East 421503

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS R Khambayat Partner of RAJ ASSOCIATES
EngineerKamleshkumar Ratilal Patel Prop of KR PATEL & ASSOCIATES
Chartered AccountantCA Ganapath jain
Chartered AccountantCA Rajendra Cjhaplot
PartnerRole in project
RAJ GROUP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Jun 2024

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Disclosure of sold-unsold inventory 31_03_2025 Aagman _11zon.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 31_03_2025 Aagman_11zon.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31_03_2025 Tulsi Aagman.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31_03_2025_Aagman.pdf2 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 31_03_2025 _Aagman.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 Aagman.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 Aagman.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aagman Q3.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 Aagman_11zon.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: Diclousure of sold and unsold Q3 Aagman.pdf31 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A Aagman.pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: Dislosure of sold and unsold Inventory.pdf24 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Aagman.pdf24 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Tulsi Aagman Form A.pdf12 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Raj Group - Tulsi Aagman.pdf9 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf22 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: HDFC Bank Ltd Raj Group Tulsi Aagman.pdf22 Nov 2024
Proforma of Agreement for saleFile: Ph 5 Flat Agreement-Final.pdf21 Oct 2024
Details of encumbrancesFile: AAGMAN ENCUMBRANCE Phase 5.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 30062024 Aagman.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 300624 (Aagman) compressed.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 30062024 Aagman.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-unsold inventory (Aagman) Compressed.pdf14 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM-4 Build no-3.pdf17 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Building N0-03 OC.pdf8 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Aagman.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Aagman.pdf23 May 2024
Disclosure of sold/ booked inventoryFile: Signed Disclosure of Sold_Unsold Inventory Tulsi Aagaman PH 5_compressed.pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Q4 Tulsi Aagman_compressed.pdf18 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 31122023 Aagman.pdf29 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Tulsi Aagman-Q3_compressed.pdf29 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Raj Group Tulsi Aagman.pdf29 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM- 1 DEC-2023 Aagman.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form- Tulsi Aagman PH 5_Apr23 To Jun23-Cpmpressed.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form-Tulsi Aagman PH 5_Jul23 To Sep23_Compressed.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 30092023 Aagman.pdf1 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 JUN-2023 (Aagman)_compressed.pdf16 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_2023_Tulsi Aagman.pdf7 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 DATED 31-03-2023.pdf3 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 DATED 31-03-2023.pdf3 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A 31-03-2023.pdf3 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-I.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Aagman.pdf27 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-I up to 31122022 Aagman.pdf15 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-Tulsi Aagman.pdf15 Feb 2023
Copy of the legal title reportFile: Legal and Search Report Com.pdf18 Aug 2021
PAN CardFile: Pan Card.pdf16 Aug 2021
Declaration in FORM BFile: Form B-Clear_compressed.pdf16 Aug 2021
Layout approvalFile: layout plan-01of 05_compressed.pdf10 Aug 2021
Building plan approvalFile: layout plan-01of 05_compressed.pdf10 Aug 2021
Details of encumbrancesFile: Encumbrance Certificate.pdf10 Aug 2021
Copy of Layout Approval (in case of layout)File: layout plan-01of 05_compressed.pdf10 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: layout plan-01of 05_compressed.pdf10 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: CC Phase-05.pdf10 Aug 2021
Declaration about Commencement CertificateFile: Form-D.pdf10 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf10 Aug 2021
Proforma of Allotment letterFile: Flat Sale Agreement.pdf10 Aug 2021
Proforma of Allotment letterFile: Shop Sale agreement.pdf10 Aug 2021
Proforma of Allotment letterFile: FLAT ALLOTTMENT LETTER.pdf10 Aug 2021

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Tulsi AadvikKharvai Badlapur east 421503377CompletedSep 2021Sep 2021
Tulsi AahanGuru Ashray Katrap Badlapur 421503449CompletedDec 2019Jun 2019
Tulsi Aarambh - P to USurvey No 48 Hissa No. A B2 B1 AND Survey No 45 Hissa No 1A 2 3 1B 5 KHARWAI BADLAPUR.144CompletedMar 2017Late, Apr 2017
Tulsi Aarambh - L to OSurvey No 48 Hissa No. A B2 B1 AND Survey No 45 Hissa No 1A 2 3 1B 5 KHARWAI BADLAPUR.112CompletedMar 2017Oct 2016
Tulsi Aarambh - A to KSurvey No 48 Hissa No. A B2 B1 AND Survey No 45 Hissa No 1A 2 3 1B 5 KHARWAI BADLAPUR.271CompletedDec 2015Late, Feb 2016

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Tulsi Aagman on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Badlapur7,600+ in Thane

Builder: RAJ GROUP

RAJ GROUP has 7 registrations on MahaRERA, including TULSI AAHAN and Tulsi Aadvik. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 5 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Tulsi Aagman is delayed beyond 30 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tulsi Aagman?

The registered promoter entity is RAJ GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tulsi Aagman?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Tulsi Aagman?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tulsi Aagman?

The professionals named in the filing: Architect: S R Khambayat Partner of RAJ ASSOCIATES; Engineer: Kamleshkumar Ratilal Patel Prop of KR PATEL & ASSOCIATES; Chartered Accountant: CA Ganapath jain; Chartered Accountant: CA Rajendra Cjhaplot. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tulsi Aagman?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tulsi Aagman. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tulsi Aagman to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.