TruSpace Prima Angulus
RG-MH-17512 · RERA P52100029972 · Last updated on MahaRERA portal: 18 Oct 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 6 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TruSpace Prima Angulus is a Others project by Atharva Enterprises in Pune, Maharashtra, registered with MahaRERA as P52100029972 on 18 Jul 2021. The registration is recorded completed; possession was promised by 31 Dec 2024.
At a glance
Project
- NameTruSpace Prima Angulus
- TypeOthers
- Location
- Off MITCON
- Balewadi
- Haveli
- Pune
- 411045
- Pincode411045
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100029972
- ReraGenie IDRG-MH-17512
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on18 Jul 2021
- Promised completion31 Dec 2024
- Revised completionNone
- Buildings1 building record
- Documents filed144 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TruSpace Prima Angulus | NA | 21 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 80%.
TruSpace Prima Angulus: 98% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 18 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed87
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ana Consortium Pvt. Ltd. |
| Architect | Avinash Nawathe |
| Engineer | Abhijit Redekar |
| Engineer | Abhijeet Redekar |
| Chartered Accountant | Siddhant Abhay Bora |
| Chartered Accountant | SPCM And Associates |
| Chartered Accountant | Nikita A Bajaj |
| Partner | Role in project |
|---|---|
| Atharva Enterprises | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Jul 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 May 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 4 Dec 2024
Documents filed144
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 144 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Form 5_TS Angulus_28-09-2025.pdf | 18 Oct 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_13-01-2025.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_TSP Angulus_29-11-2024.pdf | 13 Jan 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4_10-12-2024.pdf | 10 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Full_29-11-2024.pdf | 4 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_TSP Angulus_31-03-2024.pdf | 15 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_TSP Angulus_30-09-2024.pdf | 14 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_TSP Angulus_30-09-2024.pdf | 14 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_TSP Angulus_30-09-2024.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_TSP Angulus _30-09-2024.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Arch_Cert_30-06-2024.pdf | 12 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30-06-2024.pdf | 12 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_30-06-2024.pdf | 12 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30-06-2024.pdf | 12 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Arch_Cert_31-03-2024.pdf | 17 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_29-02-2024.pdf | 15 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_29-02-2024.pdf | 15 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31-03-2024.pdf | 15 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_29-02-2024.pdf | 15 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_31-03-2024.pdf | 15 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form- 3_29-02-2024.pdf | 15 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_31-03-2024.pdf | 15 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Arch_Cert_31-01-2024.pdf | 6 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31-01-2024.pdf | 6 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_31-01-2024.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form- 3_31-01-2024_compressed (1).pdf | 6 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Architect Certificate_31-12-2023.pdf | 10 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31-12-2023.pdf | 10 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_31-12-2023.pdf | 10 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_31-12-2023.pdf | 10 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Architect Certificate_30-11-2023.pdf | 13 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30-11-2023.pdf | 13 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_30-11-2023.pdf | 13 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30-11-2023.pdf | 13 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_30-09-2023.pdf | 17 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_07-10-2023.pdf | 17 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_07-10-2023.pdf | 17 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form- 3_17-10-2023.pdf | 17 Oct 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Deed Of Declaration-1-110 (1).pdf | 13 Sep 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Deed Of Declaration-111-220 (2).pdf | 13 Sep 2023 |
| Status of ConveyanceFile: Deed Of Declaration-1-110 (1).pdf | 13 Sep 2023 |
| Status of ConveyanceFile: Deed Of Declaration-111-220 (2).pdf | 13 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_08-09-2023.pdf | 12 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_07-09-2023.pdf | 12 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_07-09-2023.pdf | 12 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form- 3_05-09-2023.pdf | 12 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5.pdf | 2 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_10-07-2023.pdf | 17 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_07-07-2023.pdf | 17 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_07-07-2023.pdf | 17 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form- 3_15-07-2023.pdf | 17 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_31-05-2023.pdf | 15 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_07-06-2023.pdf | 15 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Certificate_10-01-2023.pdf | 15 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Certificate_11-04-2023.pdf | 15 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Certificate_07-06-2023.pdf | 15 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form- 3_14-06-2023.pdf | 15 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_31-03-2023.pdf | 17 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_06-04-2023.pdf | 17 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form- 3_31-03-2023.pdf | 17 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5_07-11-2022.pdf | 27 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_31-12-2022.pdf | 13 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_TSPAngulus_10-01-2023.pdf | 13 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_12-01-2023.pdf | 13 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch_cert_24-11-2022.pdf | 1 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_24-11-2022.pdf | 1 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_01-12-2022_compressed (1).pdf | 1 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_10-10-2022.pdf | 11 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_10-10-2022.pdf | 11 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30-09-2022_compressed (1).pdf | 11 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_30-06-2022.pdf | 12 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_06-07-2022.pdf | 12 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_30-06-2022_compressed.pdf | 12 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_26-04-2022.pdf | 24 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_21-04-2022.pdf | 24 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate_31-03-2022_compressed.pdf | 24 May 2022 |
| Building plan approvalFile: 1.pdf | 31 Mar 2022 |
| Building plan approvalFile: 2.pdf | 31 Mar 2022 |
| Building plan approvalFile: 3.pdf | 31 Mar 2022 |
| Building plan approvalFile: 4.pdf | 31 Mar 2022 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Truspace Prima Domus | Balewadi Pune - 411045 | 214 | Completed | Feb 2021 | Feb 2021 |
| Truspace Paloma | Mouje Lohagaon Pune | 30 | Completed | Dec 2018 | Dec 2018 |
| Concord Pushpak | Lohegaon Pune | 116 | Completed | Apr 2016 | Dec 2015 |
| Concord Pakhar | Erandwana | 18 | Completed | May 2013 | May 2013 |
| Concord Portia | Balewadi | 88 | Completed | Sep 2011 | Aug 2011 |
| Concord Proxima | Baner Pune | 100 | Completed | Apr 2009 | Apr 2009 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 144 filed documents as one ZIP, foldered, with a manifest
Keep TruSpace Prima Angulus on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Balewadi13,700+ in Pune
Filed coordinates, straight-line distance. 275 registered projects within 2 km.
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: Atharva Enterprises
Atharva Enterprises has 6 registrations on MahaRERA, including TruSpace Prima Domus Phase 1 and TruSpace Prima Domus Phase 2. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if TruSpace Prima Angulus is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TruSpace Prima Angulus?
The registered promoter entity is Atharva Enterprises, an others as per the filing. Its GSTIN 27ABQPT2867F1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TruSpace Prima Angulus?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for TruSpace Prima Angulus?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TruSpace Prima Angulus?
The professionals named in the filing: Architect: Ana Consortium Pvt. Ltd.; Architect: Avinash Nawathe; Engineer: Abhijit Redekar; Engineer: Abhijeet Redekar; Chartered Accountant: Siddhant Abhay Bora; Chartered Accountant: SPCM And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TruSpace Prima Angulus?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback