ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Triveni Trikaya Phase-1

Registration lapsed No litigation declared Residential / Group Housing project

Triveni Trikaya Phase-1

By Sai Balaji Group

RG-MH-52298 · RERA P52100016958 · Last updated on MahaRERA portal: 21 Mar 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 13 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2025Possession promised13 months past this date
27 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 143 documents Report an error

Triveni Trikaya Phase-1 is a Residential / Group Housing project by Sai Balaji Group in Pune, Maharashtra, registered with MahaRERA as P52100016958 on 25 Jun 2018. Possession was promised by 30 Sep 2025 and is now 13 months past that date. The completion date has moved by 9 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameTriveni Trikaya Phase-1
  • TypeResidential / Group Housing
  • Location
    • Tulapur
    • Haveli
    • Pune
    • 412216
  • Pincode412216
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100016958
  • ReraGenie IDRG-MH-52298

Builder

  • NameSai Balaji Group
  • Entity typePartnership
  • PartnersAnup Manik Agarwal, Rakesh Manik Agarwal, Ram Vasudev Agarwal, Sham Vasudev Agarwal

Key dates

13 months past promisethis monthRegisteredJun 2018First promiseDec 2024Revised toSep 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on25 Jun 2018
  • Promised completion30 Sep 2025
  • Revised completionRevised to 30 Sep 2025 (originally 30 Dec 2024)
  • Buildings3 building records
  • Documents filed143 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A2NA100000
Wing B3NA90000
Wing B4NA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

Wing A282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing B382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing B482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed128

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots128
Closed/Covered58
Open Space70
BuildingClosed/CoveredOpen SpaceTotal
Wing A2263258
Wing B3161935
Wing B4161935

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,854 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Shivale Family Through POA Sai Balaji GroupPune (CB)Pune

Approvals and building plan

Permissible FSI11499.09
Proposed, not sanctioned11,499 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShirole Bhavan , PMT Building , Jangli Maharaj Road, Pune 411004

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Sai Balaji Group-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027101Dec 2024 → Sep 2025

Reason as filed by the promoterTHE PROJECT IS NEARLY COMPLETED ABOUT 95% . TO COMPLETE REMAINING CONSTRUCTION OF THE SAID PROJECT WE NEED EXTENSION TILL DATE 30/09/2025.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000279884Priya Rajkumar SantoshiAnup Manik Agarwal24/12/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jun 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 May 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jun 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed143

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement Certificates / NA Order for plotted developmentFile: Verification of CC Triveni Trikaya.pdf21 Mar 2025
CERSAI detailsFile: declration instead of CERSAI report.pdf18 Mar 2025
Other - TechnicalFile: Pert Chart Trivene Trikaya.pdf12 Mar 2025
Details of encumbrances concerned to FinanceFile: fincial encumberence certificate.pdf11 Mar 2025
Certificates of CA (Form 5)File: form 5 (4).pdf11 Mar 2025
Details of encumbrances concerned to LegalFile: fincial encumberence certificate.pdf11 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Triveni Trikaya 31-12-2018 (form 2) 07-Mar-2025 19-15-50.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Triveni Trikaya 31-12-2024 (form 1) 07-Mar-2025 19-08-32.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: triveni Trikaya 30-09-2024 (form1) 07-Mar-2025 19-05-42.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Triveni Trikaya 30-06-2024 (form 1) 07-Mar-2025 19-02-31.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: triveni Trikaya 31-03-2024 (Form1) 07-Mar-2025 18-58-33.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Triveni Trikaya 31-12-2023 (Form1) 07-Mar-2025 18-54-40.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Triveni Trikaya 30-09-23 07-Mar-2025 18-51-08.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Triveni Trikaya 30-06-2023 (Form1) 07-Mar-2025 18-48-08.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Triveni Trikaya 31-03-2023 (Form1) 07-Mar-2025 18-44-07.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Triveni Trikaya 31-12-2022 (form 1) 07-Mar-2025 18-40-33.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Triveni Trikaya 30-06-2022 (Form 1) 07-Mar-2025 18-33-29.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Triveni Trikaya 31-03-2022 (Form 1) 07-Mar-2025 18-30-15.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Triveni Trikaya 31-12-2021 (Form 1) 07-Mar-2025 18-24-53.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Triveni Trikaya 30-06-2021 (Form 1) 07-Mar-2025 18-16-06.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Triveni Trikaya 31-03-21(form 1) 07-Mar-2025 18-10-30.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: triveni trikaya 31-03-2020 (form 1) 07-Mar-2025 18-02-56.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: triveni trikaya 31-03-2019 (form 1) 07-Mar-2025 17-55-24.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: triveni trikaya 31-12-2019 (Form 1) 07-Mar-2025 17-59-09.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: triveni trikaya 31-12-2018 (form 1) 07-Mar-2025 17-50-00.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Triveni Trikaya 30-09-2022 (Form1) 07-Mar-2025 18-37-19.pdf10 Mar 2025
Certificates of CA (Form 3)File: 12 Triveni Trikaya 30-09-2022 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: 13 Triveni Trikaya 31-12-2022 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: 14 Triveni Trikaya 31-03-2023 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: 15 Triveni Trikaya 30-06-2023 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: 15 Triveni Trikaya 30-09-2023 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: 16 Triveni Trikaya 31-12-2023 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: 17 Triveni Trikaya 31-03-2024 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: Triveni Trikaya 30-06-2024 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: Triveni Trikaya 30-09-2024 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: Triveni Trikaya 31-12-2024 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: triveni Trikaya 31-03-2019 (form 3) 10-Mar-2025 11-18-21_11zon.pdf10 Mar 2025
Certificates of CA (Form 3)File: 11 Triveni Trikaya 30-06-2022 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: 10 triveni Trikaya 31-03-2022 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: 9 Triveni Trikaya 31-12-2021 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: 8 Triveni Trikaya 30-09-2021 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: 7 Triveni Trikaya 30-06-2021 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: 6 Triveni Trikaya 31-03-2021 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: 5 Triveni Trikaya 31-12-2020 (form 3).pdf10 Mar 2025
Certificates of CA (Form 3)File: 1 triveni Trikaya 31-12-2018 form 3.pdf10 Mar 2025
Certificates of CA (Form 3)File: Triveni Trikaya 31-03-2020 (form 3) 10-Mar-2025 11-38-27_11zon.pdf10 Mar 2025
Certificates of CA (Form 3)File: triveni Trikaya 31-03-2019 (form 3) 10-Mar-2025 11-18-21_11zon.pdf10 Mar 2025
Certificates of CA (Form 3)File: triveni Trikaya 31-12-2019(form 3) 10-Mar-2025 11-29-05_11zon.pdf10 Mar 2025
Certificates of CA (Form 5)File: Form5 01-04-2023 Trivene Trikaya 23-24.pdf10 Mar 2025
Certificates of CA (Form 5)File: Form5 01-04-2022 Trivene Trikaya (22-23).pdf10 Mar 2025
Certificates of CA (Form 5)File: Form5 01-04-2020 Trivene Trikaya (20-21).pdf10 Mar 2025
Certificates of CA (Form 5)File: Form5 01-04-2021 Trivene Trikaya (21-22).pdf10 Mar 2025
Certificates of CA (Form 5)File: Form5 01-04-2019 Trivene Trikaya 19-20.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Triveni Trikaya 31-12-2018 (form 2) 07-Mar-2025 19-15-50.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: triveni Trikaya 31-12-2024 (form 2) 07-Mar-2025 20-14-25.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Triveni Trikaya 30-09-2024 (form 2) 07-Mar-2025 20-12-05.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: triveni Trikaya 30-06-2024 (form 2) 07-Mar-2025 20-09-48.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: triveni Trikaya 31-03-2024 (form 2) 07-Mar-2025 20-06-44.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: triveni Trikaya 31-12-2023 (Form 2) 07-Mar-2025 20-04-16.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: triveni Trikaya 30-09-2023 (form 2) 07-Mar-2025 20-01-32.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: triveni Trikaya 30-06-2023 (form 2) 07-Mar-2025 19-58-40.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: triveni Trikaya 31-03-2023 (form 2) 07-Mar-2025 19-55-51.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: triveni Trikaya 31-12-2022 (Form 2) 07-Mar-2025 19-53-03.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: triveni Trikaya 30-09-2022 (Form 2) 07-Mar-2025 19-50-42.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Triveni Trikaya 30-06-2022 (form 2) 07-Mar-2025 19-48-05.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: triveni Trikaya 31-03-2022 (Form 2) 07-Mar-2025 19-45-14.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Triveni Trikaya 31-12-2021(form 2) 07-Mar-2025 19-42-42.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: triveni Trikaya 30-09-2021 (form 2) 07-Mar-2025 19-39-20.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Triveni Trikaya 30-06-2021 (form2) 07-Mar-2025 19-34-41.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: triveni Trikaya 31-03-2021 (form2) 07-Mar-2025 19-31-59.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: triveni Trikaya 31-03-2020 (form 2) 07-Mar-2025 19-26-06.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Triveni Trikaya 31-03-2019 (Form 2) 07-Mar-2025 19-20-08.pdf10 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 18-19 Trivene Trikaya.pdf10 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21 Trivene Trikaya.pdf10 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 19-20 Trivene Trikaya.pdf10 Mar 2025
Disclosure of sold/ booked inventoryFile: 1 Triveni Trikaya Sold unsold _Date 31-12-2018.pdf10 Mar 2025
Disclosure of sold/ booked inventoryFile: Triveni Trikaya Sold - Unsold _Date 31-12-2024.pdf10 Mar 2025
Disclosure of sold/ booked inventoryFile: 17 Triveni Trikaya Sold-unsold _Date 30-09-2024.pdf10 Mar 2025
Disclosure of sold/ booked inventoryFile: 17 Triveni Trikaya Sold unsold _Date 30-06-2024.pdf10 Mar 2025
Disclosure of sold/ booked inventoryFile: 16Triveni Trikaya Sold unsold _Date 31-03-2024.pdf10 Mar 2025

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 9 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Triveni Trikaya Phase-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tulapur13,700+ in Pune

Builder: Sai Balaji Group

Sai Balaji Group has 1 registration on MahaRERA, including Triveni Trikaya Phase-1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Triveni Trikaya Phase-1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Triveni Trikaya Phase-1 is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Triveni Trikaya Phase-1?

The registered promoter entity is Sai Balaji Group, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Triveni Trikaya Phase-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Triveni Trikaya Phase-1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Triveni Trikaya Phase-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Triveni Trikaya Phase-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Triveni Trikaya Phase-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Triveni Trikaya Phase-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.