Home / Browse projects / Pune, Maharashtra / GURUVISTA PHASE 3

Registered No litigation declared Others project

GURUVISTA PHASE 3

By Arham Realty

RG-MH-74367 · RERA P52100055898 · Last updated on MahaRERA portal: 14 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 90%
227 of 259Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

GURUVISTA PHASE 3 is a Others project by Arham Realty in Pune, Maharashtra, registered with MahaRERA as P52100055898 on 29 Apr 2024. Possession is promised by 31 Dec 2031. 32 of the 259 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete.

At a glance

Project

  • NameGURUVISTA PHASE 3
  • TypeOthers
  • Location
    • Lonikand
    • Loni-kand
    • Haveli
    • Pune
    • 412216
  • Pincode412216
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055898
  • ReraGenie IDRG-MH-74367

Builder

  • NameArham Realty
  • Entity typePartnership
  • PartnersMr Kousar Afsar sayyed, Mrs Janhavi Ram Charthankar, Mrs Usha Pandurang Kulkarni, Mrs Sharda Madhkur Sawant, Mr Firoj Bashir Khan, Mr Ganesh Vasantrao Jahagirdar, Mr Abhikesh Vitthal Khan, Mr Vinod Suresrao Gosavi, Mr Vivek Suresh Gosavi, Mrs Shital Santosh Walake, Mr Numan Kalandar Shaikh, Mrs Anuja Jeevan Pathak
  • Other registrations3 more →

Key dates

this monthRegisteredApr 2024PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Apr 2024
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings3 building records
  • Documents filed96 files

Current status

12%32 of 259 units booked
5.0%Work done, per cost certificate

Figures as on 14 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING -BNA13121070107
WING - CNA13121040104
Wing - ANA7648048

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 90%.

WING -B13%
ActivityProgress
Excavation90%
Basement (if any)25%
Podiums (if any)25%
Plinth0%
Stilt Floor0%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING - C13%
ActivityProgress
Excavation90%
Basement (if any)25%
Podiums (if any)25%
Plinth0%
Stilt Floor0%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing - A14%
ActivityProgress
Excavation90%
Basement (if any)25%
Podiums (if any)25%
Plinth2%
Stilt Floor0%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed261

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots261
Closed/Covered261
BuildingClosed/CoveredTotal
WING -B108108
WING - C105105
Wing - A4848

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,591 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritypune metropolitian region developement authority
Permissible FSI49660.23
Proposed, not sanctioned21,029 sq m
Buildings approved5
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 4, 5, 6 Ground Floor, Sr No B, 1C, Kharadi By pass Road, Kharadi, pune 411014
Estimated costRs 37.26 cr
Cost incurredRs 1.87 cr
Work done5.02%
BuildingWingEstimatedIncurred
WING -BNARs 16.49 crRs 90,537
Wing - ANARs 16.49 crRs 1.65 cr
-NARs 4.29 crRs 21.43 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architects Associates
EngineerMohammed Abdul Raheem
EngineerAlok Kumar Singh
Chartered AccountantPATEL AND SHARMA
Chartered AccountantAgarwal Sarawgi And Associates
PartnerRole in project
Arham Realty-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf14 May 2026
Withdrawal Update Form 2File: FORM 2.pdf14 May 2026
Withdrawal Update Form 3File: FORM 3.pdf14 May 2026
Withdrawal Update Form 1File: Form 1 Dec 25.pdf28 Feb 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf28 Feb 2026
Withdrawal Update Form 3File: Form 3 Dec 25.pdf28 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf6 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf6 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf6 Nov 2025
Form 1File: Form 1.pdf3 Oct 2025
Form 2File: Form 2.pdf3 Oct 2025
Form 3File: Form 3.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf3 Oct 2025
Form 5 (FY 2024-2025)File: Form 05- Final.pdf1 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_compressed.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer certificate.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 04 form 3 final.pdf24 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 - Arham.pdf7 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold - Arham_organized.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf28 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sept 24 signed.pdf5 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold unsold Declaration 2.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_Signed 2.pdf15 Jul 2024
Other - TechnicalFile: CC Verification Arham.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Updated.pdf12 Apr 2024
Other - FinanceFile: Declaration stating non Alocation of Unit.pdf30 Mar 2024
Other - TechnicalFile: CC Verification- pdf.pdf30 Mar 2024
Other - TechnicalFile: Declaration stating non Alocation of Unit.pdf30 Mar 2024
Other - TechnicalFile: Declaration Stating Sanction built-up Area.pdf30 Mar 2024
Copy of the legal title reportFile: Legal Title Report-Arham Realty.pdf23 Mar 2024
Other - LegalFile: Authority letter_0001.pdf23 Mar 2024
Other - LegalFile: Sale deed-1_11zon (1).pdf23 Mar 2024
Other - LegalFile: Sale deed-2_11zon.pdf23 Mar 2024
Other - LegalFile: Order 50 V.pdf23 Mar 2024
Other - TechnicalFile: Sale deed-2_11zon.pdf23 Mar 2024
Other - LegalFile: English Deed_Com.pdf22 Mar 2024
Other - TechnicalFile: Sale deed-1_11zon (1).pdf22 Mar 2024
Layout approvalFile: Layout GURU VISTA PHASE.pdf18 Mar 2024
Copy of Layout Approval (in case of layout)File: Layout GURU VISTA PHASE.pdf18 Mar 2024
Proforma of Agreement for saleFile: Model_AFS_in_English_Arham_1032024.pdf18 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration For Designated Bank Account (1) - Copy.pdf18 Mar 2024
Building plan approvalFile: Layout GURU VISTA PHASE 01.pdf16 Mar 2024
Building plan approvalFile: Layout GURU VISTA PHASE 02.pdf16 Mar 2024
Building plan approvalFile: Layout GURU VISTA PHASE-03.pdf16 Mar 2024
Building plan approvalFile: Layout GURU VISTA PHASE-Compress-04.pdf16 Mar 2024
Building plan approvalFile: Layout GURU VISTA PHASE-05.pdf16 Mar 2024
Building plan approvalFile: Layout GURU VISTA PHASE- 06.pdf16 Mar 2024
Building plan approvalFile: Layout GURU VISTA PHASE-07.pdf16 Mar 2024
Building plan approvalFile: Layout GURU VISTA PHASE-Compress-08.pdf16 Mar 2024
Building plan approvalFile: Layout GURU VISTA PHASE-09.pdf16 Mar 2024
Building plan approvalFile: Layout GURU VISTA PHASE-10.pdf16 Mar 2024
Building plan approvalFile: Layout GURU VISTA PHASE-Compress-11.pdf16 Mar 2024
Building plan approvalFile: Layout GURU VISTA PHASE-12.pdf16 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout GURU VISTA PHASE 01.pdf16 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout GURU VISTA PHASE 02.pdf16 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout GURU VISTA PHASE-03.pdf16 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout GURU VISTA PHASE-Compress-04.pdf16 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout GURU VISTA PHASE-05.pdf16 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout GURU VISTA PHASE- 06.pdf16 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout GURU VISTA PHASE-07.pdf16 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout GURU VISTA PHASE-Compress-08.pdf16 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout GURU VISTA PHASE-09.pdf16 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout GURU VISTA PHASE-10.pdf16 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout GURU VISTA PHASE-Compress-11.pdf16 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout GURU VISTA PHASE-12.pdf16 Mar 2024
Declaration in FORM BFile: Scanned Form B_0001.pdf16 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Dis of int- 01.pdf16 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Dis of int- 02.pdf16 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: dis of Int- 03.pdf16 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: dis of Int-04.pdf16 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Dis of Int- 05.pdf16 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: dis of int- 06.pdf16 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Dis of int -07.pdf16 Mar 2024

How this compares with Pune

12%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GURUVISTA PHASE 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lonikand13,700+ in Pune

2 kmGURUVISTA PHASE 3Completed 3Lapsed / revoked 3Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: Arham Realty

Arham Realty has 4 registrations on MahaRERA, including GURUVISTA PHASE 3 and MEERA KUNJ. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GURUVISTA PHASE 3 is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GURUVISTA PHASE 3?

The registered promoter entity is Arham Realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GURUVISTA PHASE 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GURUVISTA PHASE 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GURUVISTA PHASE 3?

The professionals named in the filing: Architect: Cubix Architects Associates; Engineer: Mohammed Abdul Raheem; Engineer: Alok Kumar Singh; Chartered Accountant: PATEL AND SHARMA; Chartered Accountant: Agarwal Sarawgi And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GURUVISTA PHASE 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GURUVISTA PHASE 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GURUVISTA PHASE 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.