Tridhaatu Shobha Aayu
By Tridhaatu Maruti Developers LLP
RG-MH-09856 · RERA P51800002807 · Last updated on MahaRERA portal: 12 Mar 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 57 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Tridhaatu Shobha Aayu is a Residential / Group Housing project by Tridhaatu Maruti Developers LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002807 on 4 Aug 2017. Possession was promised by 31 Dec 2023 and is now 34 months past that date. The completion date has moved by 57 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameTridhaatu Shobha Aayu
- TypeResidential / Group Housing
- Location
- Pestom Sagar
- Road No. 1
- Chembur
- Kurla
- Mumbai Suburban
- 400089
- Pincode400089
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800002807
- ReraGenie IDRG-MH-09856
Builder
- NameTridhaatu Maruti Developers LLP
- Entity typeOthers
- Named personPritam Chivukula
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on4 Aug 2017
- Promised completion31 Dec 2023
- Revised completionRevised to 31 Dec 2023 (originally 31 Mar 2019)
- Buildings1 building record
- Documents filed68 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tridhaatu Shobha Aayu | NA | 11 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.
Tridhaatu Shobha Aayu: 57% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 12 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 25% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed37
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Deole Bros |
| Engineer | Shanghvi & Associates Consultants Pvt. Ltd. |
| Partner | Role in project |
|---|---|
| Tridhaatu Maruti Developers LLP | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe Project Building “Tridhaatu Shobha Aayu” comprises of Stilt + 13 floors and 37 flats across the said floors of the Project Building. The Project Building was earlier approved under the Development Control Regulations 1991 (“DCR 1991”). The said approval was obtained upto 6 slabs (i.e., 5 floors) when we had registered the project Tridhaatu Shobha Aayu on the MAHARERA Website. Construction work on site has been completed in accordance with the approvals as obtained under DCR 1991. The new Development Control and Promotion Regulations 2034 (“DCPR 2034”) is in force now and will govern the sa
Reason as filed by the promoterThe new Development Control and Promotion Regulations 2034 (“DCPR 2034”) is in force now and will govern the said Project Building for all further approvals and sanctions. Further, all projects which have commenced under the DCR 1991 and shall be approved under the new DCPR 2034, are governed by a Transition policy namely T1, T2, T3. The aforesaid T3 Policy which was released on 26th February, 2019. Consequentially, further approvals for our Project Building have been delayed and work on site can commence only post obtaining the further approvals under the new DCPR 2034. In March 2020, due to
Reason as filed by the promoterThe Project Building “Tridhaatu Shobha Aayu” comprises of Stilt + 13 floors and 37 flats across the said floors of the Project Building. In March 2020, due to the unprecedented COVID-19 pandemic the Government of India declared a nation-wide lockdown, thus resulting into reverse migration of construction workers to their hometowns and also impacted the supply chain of raw materials. We also were awaiting further approvals as per the new Development and Control Promotion Regulations 2034 (DCPR 2034) which were delayed as a fallout of the pandemic and lockdown. Thereby, due to the unavailability
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502080 | Jaydeep Rege | Tridhaatu Maruti Developers LLP | 25/06/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Other - LegalFile: Reply - Shobha Aayu-Maruthi.pdf | 12 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 31324.pdf | 9 Aug 2024 |
| Certificates of CA (Form 3)File: Form 3 310324.pdf | 9 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 310324.pdf | 9 Aug 2024 |
| Details of encumbrances concerned to FinanceFile: Details of Encumbrances.pdf | 9 May 2024 |
| Details of encumbrances concerned to LegalFile: Details of Encumbrances.pdf | 9 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A March 2022-2024.pdf | 8 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Shobha Aayu-Mar 19.pdf | 19 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Shobha Aayu-Mar 21.pdf | 19 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Shobha Aayu-Mar 22.pdf | 19 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Shobha Aayu-Mar 23.pdf | 19 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 Shobha Aayu- Mar 23.pdf | 2 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Maruthi- FY 22-23.pdf | 7 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30th March 2023.pdf | 2 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30th June 2023.pdf | 2 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30th Sept 2023.pdf | 2 Nov 2023 |
| Certificates of CA (Form 3)File: Form-3 Shobha Aayu- Mar 19_.pdf | 23 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3- Shobha Aayu- Mar 21.pdf | 23 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3- Shobha Aayu- Mar-22.pdf | 23 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Maruthi Developers form 5 signed 31032023.pdf | 11 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Maruthi CHS 10Dec2022.pdf | 21 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Tridhaatu Shobha Aayu 2020.pdf | 20 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Tridhaatu Shobha Aayu 2021.pdf | 20 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Tridhaatu Shobhaaayu 2022.pdf | 20 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Maruthi.pdf | 20 Jan 2023 |
| Certificates of CA (Form 3)File: Shobha aayu Rera Form 3 as on 31 Mar 2021.pdf | 20 Jan 2023 |
| Certificates of CA (Form 3)File: Shobha aayu Rera Form 3 as on 31 Mar 2022.pdf | 20 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Shobha Aayu form 5 31032021.pdf | 20 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 31032022.pdf | 20 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019 2020.pdf | 3 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold- Booked Inventory -Shobha Aayu.pdf | 29 Jun 2021 |
| Certificates of CA (Form 5)File: Form 5 - Tridhaatu Shobha Aayu.pdf | 29 Jun 2021 |
| Declaration about Commencement CertificateFile: Fortmat D- Shobhaaayu- Maruthi.pdf | 22 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Fortmat D- Shobhaaayu- Maruthi.pdf | 15 Jun 2021 |
| Details of Restarting of Construction work post lockdownFile: Construction Status Post Lockdown-Tridhaatu Shobha Aayu.pdf | 2 Dec 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form-5 Maruti.pdf | 16 Dec 2019 |
| Certificates of CA (Form 5)File: Form-5 Maruti.pdf | 27 Sep 2019 |
| Certificates of CA (Form 5)File: Form 5 - Maruthi 17-18.pdf | 1 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC DTD210818 UPTO 8TH FLOOR PER AMENDED APPROVALS 210718.pdf | 24 Aug 2018 |
| Building plan approvalFile: Approval letter.pdf | 27 Jul 2018 |
| Building plan approvalFile: Drawing 2018 Page 1.pdf | 27 Jul 2018 |
| Building plan approvalFile: Drawing 2018 Page 2.pdf | 27 Jul 2018 |
| Building plan approvalFile: Drawing 2018 Page 3.pdf | 27 Jul 2018 |
| Building Plan Approval (IOD)File: Approval letter.pdf | 27 Jul 2018 |
| Building Plan Approval (IOD)File: Drawing 2018 Page 1.pdf | 27 Jul 2018 |
| Building Plan Approval (IOD)File: Drawing 2018 Page 2.pdf | 27 Jul 2018 |
| Building Plan Approval (IOD)File: Drawing 2018 Page 3.pdf | 27 Jul 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate Maruthi.pdf | 31 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tridhaatu Shobha Aayu.pdf | 21 Feb 2018 |
| Declaration in FORM BFile: Declaration Form B New.pdf | 1 Aug 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Maruthi CC.pdf | 26 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3 - RERA - Maruthi.pdf | 26 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Maruthi.pdf | 24 Jul 2017 |
| Layout approvalFile: LAYOUT.pdf | 22 Jul 2017 |
| Building plan approvalFile: Maruthi IOD.pdf | 22 Jul 2017 |
| Building plan approvalFile: MYSCAN_20160222_0001.pdf | 22 Jul 2017 |
| Building plan approvalFile: MYSCAN_20160222_0002.pdf | 22 Jul 2017 |
| Building plan approvalFile: MYSCAN_20160222_0003.pdf | 22 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 22 Jul 2017 |
| Building Plan Approval (IOD)File: Maruthi IOD.pdf | 22 Jul 2017 |
| Building Plan Approval (IOD)File: MYSCAN_20160222_0001.pdf | 22 Jul 2017 |
| Building Plan Approval (IOD)File: MYSCAN_20160222_0002.pdf | 22 Jul 2017 |
| Building Plan Approval (IOD)File: MYSCAN_20160222_0003.pdf | 22 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Maruthi.pdf | 22 Jul 2017 |
| Details of encumbrancesFile: Details of Encumbrances.PDF | 14 Jul 2017 |
| PAN CardFile: Tridhaatu Maruthi Developers LLP-PAN Card.PDF | 8 Jul 2017 |
| Copy of the legal title reportFile: Maruthi-Title Report.pdf | 8 Jul 2017 |
| Proforma of Allotment letterFile: Merged-AFS and Allotment Letter.pdf | 8 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Tridhaatu Shobha Aayu on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chembur6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 512 registered projects within 2 km.
Atmosphere O2 Tower-G
Atmosphere Realty Pvt Ltd
VARDHAN HEIGHTS
VARDHAN HOUSING
Promesa Midtown
Darshan Properties
ELYSIUM
KRIPA ELITE HOMES
JADE
PRIYA CONSTRUCTIONS
Gami and Jaydeep Elanza
M/S REAL INFRASTRUCTURE CO
See every Mumbai Suburban project, with the district possession charts
Builder: Tridhaatu Maruti Developers LLP
Tridhaatu Maruti Developers LLP has 1 registration on MahaRERA, including Tridhaatu Shobha Aayu. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Tridhaatu Shobha Aayu shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Tridhaatu Shobha Aayu is delayed beyond 31 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Tridhaatu Shobha Aayu?
The registered promoter entity is Tridhaatu Maruti Developers LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Tridhaatu Shobha Aayu?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Tridhaatu Shobha Aayu?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Tridhaatu Shobha Aayu?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Tridhaatu Shobha Aayu?
The professionals named in the filing: Architect: Deole Bros; Engineer: Shanghvi & Associates Consultants Pvt. Ltd.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Tridhaatu Shobha Aayu?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback