ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / Tridhaatu Athena

Registration lapsed No litigation declared Residential / Group Housing project

Tridhaatu Athena

By Tridhaatu Madhu Villa Developers LLP

RG-MH-08929 · RERA P51900002435 · Last updated on MahaRERA portal: 13 Dec 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 54 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
1 of 11Construction stages donefurthest along: Basement (if any), 20%
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

Tridhaatu Athena is a Residential / Group Housing project by Tridhaatu Madhu Villa Developers LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900002435 on 1 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 54 months from the original filing.

At a glance

Project

  • NameTridhaatu Athena
  • TypeResidential / Group Housing
  • Location
    • Adenwalla Road
    • Matunga
    • Mumbai City
    • 400019
  • Pincode400019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900002435
  • ReraGenie IDRG-MH-08929

Builder

  • NameTridhaatu Madhu Villa Developers LLP
  • Entity typeOthers
  • Named personKrishnan Muthukumar

Key dates

10 months past promisethis monthRegisteredAug 2017First promiseJun 2021Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Aug 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tridhaatu AthenaNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 20%.

Tridhaatu Athena: 13% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)20%
Podiums (if any)0%
Plinth20%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities17

As on 13 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Society OfficeNoNot applicable
GymnasiumNoNot applicable

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered30

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area521 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2109.19
Proposed, not sanctioned1,756 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNear New Vijay Cinema 609 V N Purav Marg Sion Trombay Road Chembur 400071

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpacious Designs Architects Pvt Ltd
ArchitectJ G Kawa & Associates
EngineerJ W Consultants LLP
PartnerRole in project
Tridhaatu Madhu Villa Developers LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900009764Jun 2021 → Jun 2022

Reason as filed by the promoterThe Project Building Tridhaatu Athena comprises of Ground plus 20 (Twenty) slabs i.e., 19 (Nineteen) floors. Work to date has been completed in accordance with the current approvals in place. In March 2020, due to the unprecedented COVID-19 pandemic the Government of India declared a nation-wide lockdown, thus resulting into reverse migration of construction workers to their hometowns and also impacted the supply chain of raw materials. Thereby, due to the unavailability of in-situ labour, delayed approvals and required raw materials, all construction activities on the Project Building were st

EXT51900017268Jun 2021 → Dec 2025

Reason as filed by the promoterThe Project Building comprises of G+19 (Nineteen) habitable floors. Project Work to date has been completed in accordance with the current approvals in place. A series of unprecedented factors have impacted the project progress namely: 1. Introduction of the Development Control and Promotion Regulations, 2034 (“DCPR”) and Delay in Approvals: The transformation from the then existing DCR, 1991 to the new DCPR, 2034 witnessed modifications in many of the policies. The Draft plans were published in 2018 and changed more than 5 times thereafter. The DCPR 2034 was released only in September 2018 an

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 2- Athena- Mar 19.pdf13 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Athena- Mar 19.pdf13 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Athena- Mar 22.pdf13 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Athena- Mar 23.pdf13 Dec 2023
Certificates of CA (Form 3)File: Form 3 Athena Madhu Villa- Mar 23.pdf2 Dec 2023
Certificates of CA (Form 3)File: Form 3- Madhu Villa- Mar 22.pdf6 Nov 2023
Certificates of CA (Form 3)File: Form-3 Athena Madhuvilla_Mar 19.pdf23 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Madhu Villa-form 5-signed 31032023.pdf5 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 21.pdf1 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 22.pdf1 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 23.pdf1 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A March 22.pdf1 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A March 23.pdf1 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Athena 20062023.pdf1 Aug 2023
Certificates of CA (Form 3)File: Form 3 Madhu Villa 2021 22.pdf1 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Athena 20062023.pdf21 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Madhu Villa Form - 5 FY 2020 21.pdf2 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Madhu Villa Form 5 FY 2021 22.pdf2 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A-Athena 2020.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Athena 2021.pdf12 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5-Madhu Villa.pdf6 Jul 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold- Booked Inventory -Athena.pdf29 Jun 2021
Certificates of CA (Form 5)File: Form 5-Madhu Villa.pdf29 Jun 2021
Declaration about Commencement CertificateFile: Fortmat D- Madhuvilla- Athena.pdf22 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: Fortmat D- Madhuvilla- Athena.pdf15 Jun 2021
Details of Restarting of Construction work post lockdownFile: Construction Status Post Lockdown-Tridhaatu Athena.pdf2 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form-5 Madhuvilla.pdf16 Dec 2019
Certificates of CA (Form 5)File: Form-5 Madhuvilla.pdf27 Sep 2019
Certificates of CA (Form 5)File: Form 5-ATHENA-2017-18.pdf1 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tridhaatu Athena Form I 31 Mar 18.pdf11 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate upto plinth.pdf27 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Madhu Villa 10 01 18.pdf27 Feb 2018
OtherFile: Tridhaatu Athena Disclosure Letter.pdf27 Feb 2018
Details of encumbrancesFile: Declaration on No Encumbrances 25 10 2017.PDF1 Dec 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Madhu Villa.pdf1 Dec 2017
Details of encumbrancesFile: Details of Encumbrances.PDF27 Jul 2017
Declaration in FORM BFile: Declaration Form B.PDF27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Madhu Villa.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate.pdf27 Jul 2017
Certificates of CA (Form 3)File: Form 3 - RERA - Madhu Villa-compressed.pdf27 Jul 2017
Proforma of Allotment letterFile: Merged-AFS and Allotment Letter.pdf27 Jul 2017
Building plan approvalFile: Madhu Villa IOD Final.pdf20 Jul 2017
Building Plan Approval (IOD)File: Madhu Villa IOD Final.pdf20 Jul 2017
Layout approvalFile: LAYOUT PLAN.pdf17 Jul 2017
Building plan approvalFile: IOD 01.pdf17 Jul 2017
Building plan approvalFile: IOD 02.pdf17 Jul 2017
Building plan approvalFile: IOD 03.pdf17 Jul 2017
Building plan approvalFile: IOD 04.pdf17 Jul 2017
Building plan approvalFile: IOD 05.pdf17 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf17 Jul 2017
Building Plan Approval (IOD)File: IOD 01.pdf17 Jul 2017
Building Plan Approval (IOD)File: IOD 02.pdf17 Jul 2017
Building Plan Approval (IOD)File: IOD 03.pdf17 Jul 2017
Building Plan Approval (IOD)File: IOD 04.pdf17 Jul 2017
Building Plan Approval (IOD)File: IOD 05.pdf17 Jul 2017
PAN CardFile: Tridhaatu Madhu Villa Developers LLP-PAN Card.PDF8 Jul 2017
Copy of the legal title reportFile: Title Report MADHU VILLA.pdf8 Jul 2017

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one moved by 54 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Tridhaatu Athena on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Matunga780+ in Mumbai City

2 kmTridhaatu AthenaCompleted 88Lapsed / revoked 60Other 83Dot size: filed unitsN

Filed coordinates, straight-line distance. 231 registered projects within 2 km.

Builder: Tridhaatu Madhu Villa Developers LLP

Tridhaatu Madhu Villa Developers LLP has 1 registration on MahaRERA, including Tridhaatu Athena. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that Tridhaatu Athena shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Tridhaatu Athena is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tridhaatu Athena?

The registered promoter entity is Tridhaatu Madhu Villa Developers LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tridhaatu Athena?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Tridhaatu Athena?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tridhaatu Athena?

The professionals named in the filing: Architect: Spacious Designs Architects Pvt Ltd; Architect: J G Kawa & Associates; Engineer: J W Consultants LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tridhaatu Athena?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tridhaatu Athena. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tridhaatu Athena to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.