ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / VERVE MANSION

Registered No litigation declared Residential / Group Housing project

VERVE MANSION

By SHANTI SIDDHI INFRA LLP

RG-MH-71181 · RERA P51900046224 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Staircases, 95%
75 of 99Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

VERVE MANSION is a Residential / Group Housing project by SHANTI SIDDHI INFRA LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900046224 on 20 Jun 2022. Possession is promised by 31 Dec 2027. 24 of the 99 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameVERVE MANSION
  • TypeResidential / Group Housing
  • Location
    • Bhaudaji Road
    • Matunga
    • Mumbai City
    • 400019
  • Pincode400019
  • RERA no.P51900046224
  • ReraGenie IDRG-MH-71181

Builder

  • NameSHANTI SIDDHI INFRA LLP
  • Entity typePartnership
  • PartnersVipul Shantilal Nagda, Mitesh Navinchandra Nagda

Key dates

this monthRegisteredJun 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Current status

24%24 of 99 units booked
65.5%Work done, per cost certificate

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VERVE MANSIONNA271490999

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

VERVE MANSION: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes99%
Storm Water DrainsYes99%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes55%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed77

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots77
Closed/Covered77

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,314 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Ajit Pandurang Rangnekar and Others-Hyderabad
Manik Suresh Pandit and OthersMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1747.0
Proposed, not sanctioned1,747 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRaj Niketan, Bhandarkar Road, Matunga, Mumbai-400019
Estimated costRs 42.77 cr
Cost incurredRs 27.99 cr
Work done65.45%
BuildingWingEstimatedIncurred
VERVE MANSIONNARs 42.77 crRs 27.99 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAum Architects
EngineerLad Consultants
EngineerRahul Chetan Dharod
Chartered AccountantSwapnesh and Vinit Chartered Accountants
Chartered AccountantHMS & CO
PartnerRole in project
SHANTI SIDDHI INFRA LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form_1_Q4_25-26.pdf19 Jun 2026
Withdrawal Update Form 2File: Form_2_Q4_25-26.pdf19 Jun 2026
Withdrawal Update Form 3File: Form_3_Q4_25-26.pdf19 Jun 2026
Withdrawal Update Form 1File: 01 31-12-2025- FORM 1 - (Verve Mansion) .pdf6 Apr 2026
Withdrawal Update Form 2File: 02 - Form 2 Q3 FY 25-26.pdf6 Apr 2026
Withdrawal Update Form 3File: 03 Form 3 Q3 FY 25-26 (Verve Mansion) SG .pdf6 Apr 2026
Withdrawal Update Form 1File: 01 FORM 1 - Q2 FY 25-26 (Verve Mansion) .pdf4 Apr 2026
Withdrawal Update Form 2File: 02 Form 2 Q2- FY 25-26 (Verve Mansion) .pdf4 Apr 2026
Withdrawal Update Form 3File: 03 Form 3 Q2 FY 25-26 (Verve Mansion) SG .pdf4 Apr 2026
Form 3File: 00- Form 3 Q4 FY 24-25 (Verve Mansion) SG.PDF26 Oct 2025
Form 1File: 04- F1 31-03-2025- FORM 1 - ARCHITECT CERTIFICATE.pdf26 Oct 2025
Form 2File: 04- F2 Q4- FY 24-25.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: 12_31-03-2025.pdf26 Oct 2025
Withdrawal Update Form 1File: 30-06-2025- FORM 1 - ARCHITECT CERTIFICATE.pdf26 Oct 2025
Withdrawal Update Form 2File: Form 2 Q1- FY 25-26 (Verve Mansion) .pdf26 Oct 2025
Withdrawal Update Form 3File: Form 3 Q1 FY 25-26 (Verve Mansion).pdf26 Oct 2025
Form 2A (FY 2024-2025)File: 31-03-2025 - 2A Quality Assuarance RERA Portal Verve Mansion .pdf25 Oct 2025
Form 5 (FY 2024-2025)File: FORM-5 Verve Mansion 2024-25 SG .pdf7 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Revised as per correction App query.pdf13 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2024 - FORM 1 - ARCHITECT CERTIFICATE.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 FY 24-25 (Verve Mansion) SG.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3- FY 24-25 Form 2.pdf17 Feb 2025
Disclosure of sold/ booked inventoryFile: 11- 31-12-2024.pdf17 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FINALSIGNED _FORM-5 Verve Mansion 2022-23.pdf9 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FINAL signed_FORM-5 Verve Mansion 2023-24.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2022 - FORM 1 - ARCHITECT CERTIFICATE.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-09-2024 - FORM 1- ARCHITECT CERTIFICATE.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2024 - FORM 1 - ARCHITECT CERTIFICATE.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2024 - FORM 1 - ARCHITECT CERTIFICATE.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2023 - FORM 1 - ARCHITECT CERTIFICATE.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-09-2023 - FORM 1 - ARCHITECT CERTIFICATE.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2023 - FORM 1 - ARCHITECT CERTIFICATE.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2023 - FORM 1 - ARCHITECT CERTIFICATE.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2022 - FORM 1 - ARCHITECT CERTIFICATE.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-09-2022 - FORM 1 - ARCHITECT CERTIFICATE.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03- FORM 3 Q3-FY 22-23.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 02- FORM 3 Q2 FY 24-25.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01- FORM 3 Q1 FY 24-25.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 04- FORM 3 Q4 FY 23-24.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03- FORM 3 Q3 FY 23-24.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 02- FORM 3 Q2 FY 23-24.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01- FORM 3 Q1 FY 23-24.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 04- FORM 3 Q4-FY 22-23.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 02- FORM 3 Q2-FY 22-23.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01- FORM 3 Q1-FY 22-23.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2- FY 22-23.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 04- FORM 3 Q4-FY 22-23.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2- FY 24-25.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1- FY 24-25.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4- FY 23-24.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3- FY 23-24.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1- FY 23-24.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4- FY 22-23.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3- FY 22-23.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1- FY 22-23.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2- FY 23-24.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: 4- 31-03-2023.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: 10- 30-09-2024.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: 9- 30-06-2024.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: 8- 31-03-2024.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: 7- 31-12-2023.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: 6- 30-09-2023.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: 5- 30-06-2023.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: 3- 31-12-2022.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: 2- 30-09-2022.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: 1- 30-06-2022.pdf2 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1- 30-06-2022 - 2A Quality Assuarance.pdf2 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 4- 31-03-2024 - 2A Quality Assuarance.pdf2 Dec 2024
Layout approvalFile: IOD Drawing Venkatesh.pdf14 Jun 2022
Layout approvalFile: IOD Drawing Vishnu Sadan.pdf14 Jun 2022
Building plan approvalFile: IOD Drawing Venkatesh.pdf14 Jun 2022
Building plan approvalFile: IOD Drawing Vishnu Sadan.pdf14 Jun 2022
Copy of Layout Approval (in case of layout)File: IOD Drawing Venkatesh.pdf14 Jun 2022
Copy of Layout Approval (in case of layout)File: IOD Drawing Vishnu Sadan.pdf14 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD Drawing Venkatesh.pdf14 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD Drawing Vishnu Sadan.pdf14 Jun 2022
Declaration in FORM BFile: Final Form B.pdf14 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: verva- form 3_11zon.pdf14 Jun 2022
CERSAI detailsFile: CERSAI_Search_Report_200239463384_For_Asset_Based_Search_10_06_2022_16_09_43_015.pdf10 Jun 2022
PAN CardFile: Pan Card Shanti Siddhi Infra LLP.pdf28 May 2022

How this compares with Mumbai City

24%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VERVE MANSION on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Matunga780+ in Mumbai City

Builder: SHANTI SIDDHI INFRA LLP

SHANTI SIDDHI INFRA LLP has 1 registration on MahaRERA, including VERVE MANSION. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if VERVE MANSION is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VERVE MANSION?

The registered promoter entity is SHANTI SIDDHI INFRA LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VERVE MANSION?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VERVE MANSION?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VERVE MANSION?

The professionals named in the filing: Architect: Aum Architects; Engineer: Lad Consultants; Engineer: Rahul Chetan Dharod; Chartered Accountant: Swapnesh and Vinit Chartered Accountants; Chartered Accountant: HMS & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VERVE MANSION?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VERVE MANSION. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VERVE MANSION to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.