Home / Browse projects / Mumbai City, Maharashtra / Tridhaatu Arista - Redevelopment of Shanti Niwas
Tridhaatu Arista - Redevelopment of Shanti Niwas
RG-MH-09830 · RERA P51900001764 · Last updated on MahaRERA portal: 12 Mar 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 48 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Tridhaatu Arista - Redevelopment of Shanti Niwas is a Residential / Group Housing project by Tridhaatu Builders LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900001764 on 29 Jul 2017. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 48 months from the original filing. 11 of the 21 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameTridhaatu Arista - Redevelopment of Shanti Niwas
- TypeResidential / Group Housing
- Location
- Devdhar Road
- Matunga
- Mumbai City
- 400019
- Pincode400019
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900001764
- ReraGenie IDRG-MH-09830
Builder
- NameTridhaatu Builders LLP
- Entity typeOthers
- Named personKrishnan Muthukumar
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on29 Jul 2017
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 30 Jun 2021)
- Buildings1 building record
- Documents filed87 files
Current status
Figures as on 12 Mar 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tridhaatu Arista | NA | 22 | 12 | 21 | 0 | 21 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.
Tridhaatu Arista: 70% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 65% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 12 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed32
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Amita Padwal |
| Architect | JG Kawa & Associates |
| Engineer | Prasad Gaikwad |
| Engineer | JW Consultants LLP |
| Chartered Accountant | SRShelkeandAssociates |
| Partner | Role in project |
|---|---|
| Tridhaatu Builders LLP | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe Project Building Tridhaatu Arista comprises of Ground plus 19 (Nineteen) slabs i.e., 18 (Eighteen) floors. Work to date has been completed in accordance with the current approvals in place. In March 2020, due to the unprecedented COVID-19 pandemic the Government of India declared a nation-wide lockdown, thus resulting into reverse migration of construction workers to their hometowns and also impacted the supply chain of raw materials. Thereby, due to the unavailability of in-situ labour, delayed approvals and required raw materials, all construction activities on the Project Building were
Reason as filed by the promoterThe Project Building ‘Tridhaatu Arista - Redevelopment of Shanti Niwas’ (“Project/ Building”) comprises of Ground plus 19 (Nineteen) slabs i.e., 18 eighteen) floors. Work to date has been completed in accordance with the current approvals in place. As all may be aware, the Covid-19 Pandemic followed by the ensuing lockdowns {“pandemic”) caused a hinderance in the operation of the Real Estate Industry which drastically affected the progress of work in the said Project. Despite making our best effort, we (“the Developer”) were unable to recommence work on the project even after the lockdown was
Reason as filed by the promoterWe would like to state that with respect to our Project Building “Tridhaatu Arista” (“Project Building”), the RCC works are completed and finishing works are in progress. Parallely we will be initiating the process for obtaining required approvals for completion of Occupation Certificate (OC). The OC compliances (for work completion on site) will take about 90 days. Thereafter, the estimated time for procuring the said OC for the Project Building will take about 120-180 days. Keeping a sufficient buffer, we therefore request you to kindly grant us an extension for the said project upto 31st Ma
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000194602 | J K Shah & Rajeshwari J Shah | TRIDHAATU BUILDERS LLP | 22/10/2020 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| OtherFile: Reply - Arista Shanti Niwas.pdf | 12 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 2024.pdf | 10 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest 2024.pdf | 10 Jul 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200312649859_For_Asset_Based_Search.pdf | 5 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real estate organisations.pdf | 5 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Arista- Mar 24.pdf | 26 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Tridhaatu Builders LLP- Format A.pdf | 13 Jun 2024 |
| Declaration in FORM BFile: Declaration Form B.pdf | 4 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 1 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Arista- Mar 24.pdf | 1 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: SN-Disclosure of Sold Inventory.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Form 3-Arista-Shanti Niwas-Builders-Mar 24.pdf | 1 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Form 3-Arista-Shanti Niwas-Builders-Mar 24.pdf | 1 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Arista 2023 - 2024.pdf | 1 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Arista 2023 - 2024.pdf | 31 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Arista-Builders-FY 23-24.pdf | 27 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Arista 2022 - 2023 .pdf | 27 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Arista- Mar 19.pdf | 19 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Arista- Mar 22.pdf | 19 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Arista- Mar 23.pdf | 19 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3-Arista-Shanti Niwas-Builders-Mar 23.pdf | 2 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-Arista-Builders-FY 22-23.pdf | 1 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3-Tridhaatu Builders LLP-Shanti Niwas-Mar 19.pdf | 6 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Builders Form - 5 M21.pdf | 29 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Builders Form 5 M22.pdf | 29 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arista Dec 2022.pdf | 24 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Arista Engineer Certificate.pdf | 24 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Tridhaatu Arista MAR 2022.pdf | 24 Mar 2023 |
| CERSAI detailsFile: Disclosure of Sold Booked Inventory Arista.pdf | 24 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Arista.pdf | 24 Mar 2023 |
| Certificates of CA (Form 3)File: Form 3 Tridhaatu Builders LLP MAR 2022.pdf | 24 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold- Booked Inventory -Arista.pdf | 20 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Arista - Engineer Certificate.pdf | 21 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Tridhaatu Arista-2022.pdf | 21 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - 2020.pdf | 7 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - 2021.pdf | 7 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold- Booked Inventory -Arista.pdf | 23 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Arista 2019-20.pdf | 23 Jun 2021 |
| Declaration about Commencement CertificateFile: Format D- Shanti Niwas- Arista.pdf | 22 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Format D- Shanti Niwas- Arista.pdf | 15 Jun 2021 |
| Details of Restarting of Construction work post lockdownFile: Construction Status Post Lockdown-Tridhaatu Arista.pdf | 2 Dec 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form-5 Arista.pdf | 16 Dec 2019 |
| Certificates of CA (Form 5)File: Form-5 Arista.pdf | 1 Oct 2019 |
| Certificates of CA (Form 5)File: Form 5- ARISTA- 2017-18.pdf | 1 Oct 2018 |
| Building plan approvalFile: Drawing July 2018 Page 1.pdf | 27 Jul 2018 |
| Building plan approvalFile: Drawing July 2018 Page 2.pdf | 27 Jul 2018 |
| Building plan approvalFile: Drawing July 2018 Page 3.pdf | 27 Jul 2018 |
| Building plan approvalFile: Drawing July 2018 Page 4.pdf | 27 Jul 2018 |
| Building plan approvalFile: Drawing July 2018 Page 6.pdf | 27 Jul 2018 |
| Building plan approvalFile: Drawing July 2018 Page 5.pdf | 27 Jul 2018 |
| Building plan approvalFile: Drawing July 2018 Page 7.pdf | 27 Jul 2018 |
| Building Plan Approval (IOD)File: Drawing July 2018 Page 1.pdf | 27 Jul 2018 |
| Building Plan Approval (IOD)File: Drawing July 2018 Page 2.pdf | 27 Jul 2018 |
| Building Plan Approval (IOD)File: Drawing July 2018 Page 3.pdf | 27 Jul 2018 |
| Building Plan Approval (IOD)File: Drawing July 2018 Page 4.pdf | 27 Jul 2018 |
| Building Plan Approval (IOD)File: Drawing July 2018 Page 5.pdf | 27 Jul 2018 |
| Building Plan Approval (IOD)File: Drawing July 2018 Page 6.pdf | 27 Jul 2018 |
| Building Plan Approval (IOD)File: Drawing July 2018 Page 7.pdf | 27 Jul 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tridhaatu Arista Form I 31 Mar 18.pdf | 11 Jul 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Cert Upto Plinth.pdf | 28 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I Architect Certificate Arista.pdf | 28 Mar 2018 |
| OtherFile: Tridhaatu Arista Disclosure Letter.pdf | 23 Feb 2018 |
| OtherFile: Tridhaatu Arista Disclosure Letter.pdf | 22 Feb 2018 |
| Details of encumbrancesFile: Declaration on No Encumbrances 25 10 2017.PDF | 4 Dec 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Shanti Niwas.pdf | 4 Dec 2017 |
| Declaration in FORM BFile: Form B - Declaration-Cum-Affidavit.PDF | 26 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3 CA certificate Shanti Niwas.pdf | 26 Jul 2017 |
| Building plan approvalFile: Shanti Niwas IOD Final.pdf | 22 Jul 2017 |
| Building Plan Approval (IOD)File: Shanti Niwas IOD Final.pdf | 22 Jul 2017 |
| Building plan approvalFile: IOD 01.pdf | 17 Jul 2017 |
| Building plan approvalFile: IOD 02.pdf | 17 Jul 2017 |
| Building plan approvalFile: IOD 03.pdf | 17 Jul 2017 |
| Layout approvalFile: Layout plan.pdf | 17 Jul 2017 |
| Building plan approvalFile: IOD 06.pdf | 17 Jul 2017 |
| Building plan approvalFile: IOD 05.pdf | 17 Jul 2017 |
| Building plan approvalFile: IOD 04.pdf | 17 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout plan.pdf | 17 Jul 2017 |
| Building Plan Approval (IOD)File: IOD 01.pdf | 17 Jul 2017 |
| Building Plan Approval (IOD)File: IOD 02.pdf | 17 Jul 2017 |
| Building Plan Approval (IOD)File: IOD 03.pdf | 17 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Tridhaatu Arista - Redevelopment of Shanti N on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Matunga780+ in Mumbai City
Filed coordinates, straight-line distance. 251 registered projects within 2 km.
CODENAME MATUNGA ORIGINS
J. P. INFRA (MUMBAI) PRIVATE LIMITED
SHANTI HEIGHTS
Vipul Shantilal Nagda HUF
Balkrishna Hills
Oriental Contractors Private Limited
VERVE MANSION
SHANTI SIDDHI INFRA LLP
PRINCECARE AMARAA
PRINCECARE AMARAA LLP
Godrej Five Gardens
Godrej Projects Development Ltd.
See every Mumbai City project, with the district possession charts
Builder: Tridhaatu Builders LLP
Tridhaatu Builders LLP has 1 registration on MahaRERA, including Tridhaatu Arista - Redevelopment of Shanti Niwas. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What does it mean that Tridhaatu Arista - Redevelopment of Shanti Niwas shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Tridhaatu Arista - Redevelopment of Shanti Niwas is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Tridhaatu Arista - Redevelopment of Shanti Niwas?
The registered promoter entity is Tridhaatu Builders LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Tridhaatu Arista - Redevelopment of Shanti Niwas?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Tridhaatu Arista - Redevelopment of Shanti Niwas?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Tridhaatu Arista - Redevelopment of Shanti Niwas?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Tridhaatu Arista - Redevelopment of Shanti Niwas?
The professionals named in the filing: Architect: Amita Padwal; Architect: JG Kawa & Associates; Engineer: Prasad Gaikwad; Engineer: JW Consultants LLP; Chartered Accountant: SRShelkeandAssociates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Tridhaatu Arista - Redevelopment of Shanti Niwas?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback