Home / Browse projects / Mumbai City, Maharashtra / Tridhaatu Aaroha
Tridhaatu Aaroha
By Tridhaatu Vishnu Kunj Developers LLP
RG-MH-92362 · RERA P51900010312 · Last updated on MahaRERA portal: 5 Nov 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
- Litigation declared, 1 case
- 1 complaint at MahaRERA
- Completion date moved by 63 months
- 4 extensions taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Tridhaatu Aaroha is a Residential / Group Housing project by Tridhaatu Vishnu Kunj Developers LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900010312 on 24 Aug 2017. Possession was promised by 31 Dec 2023 and is now 34 months past that date. The completion date has moved by 63 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameTridhaatu Aaroha
- TypeResidential / Group Housing
- Location
- KA Subramaniyam Road
- Matunga
- Mumbai City
- 400019
- Pincode400019
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900010312
- ReraGenie IDRG-MH-92362
Builder
- NameTridhaatu Vishnu Kunj Developers LLP
- Entity typeOthers
- GSTIN27AAGFT7483C1ZY
- Named personRrajesh Survey
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on24 Aug 2017
- Promised completion31 Dec 2023
- Revised completionRevised to 31 Dec 2023 (originally 30 Sep 2018)
- Buildings1 building record
- Documents filed62 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TRIDHAATU AAROHA | NA | 18 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
TRIDHAATU AAROHA: 80% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
Progress on shared amenities15
As on 5 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 85% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed18
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aakar Architect & Consultants |
| Architect | Madhuri Khandekar |
| Engineer | Milind Kulkarni Consulting Engineers |
| Chartered Accountant | S R Shelke & Associates |
| Chartered Accountant | DMJ & Company |
| Partner | Role in project |
|---|---|
| Tridhaatu Vishnu Kunj Developers LLP | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSeeking Extension under 7(3) of the RERA Act and basis majority consent received from Allottees as attached with this Application
Reason as filed by the promoterThe Project Building Tridhaatu Aaroha comprises of Ground plus 18 (Eighteen) slabs i.e., 17 (seventeen) floors. The RCC Structure of the Project Building is 100% complete, the Building Finishes are in progress. In March 2020, due to the unprecedented COVID-19 pandemic the GoI declared a nation-wide lockdown, resulting into reverse migration of construction workers to their hometowns and also impacted the supply chain of raw materials. Thereby, due to the unavailability of in-situ labour, delayed approvals and required raw materials, all construction activities on the Project Building were stal
Reason as filed by the promoterThe Project Building Tridhaatu Aaroha comprises of Ground plus 18 (Eighteen) slabs i.e., 17 (seventeen) floors. The initial changes brought about by the advent of the Goods and Service tax (GST) followed by the changing market situation has led to certain delays in procurement of material as well as retention/ engaging contractors for Building Construction and Finishes which has resulted in an overall delay in finishing of the project Tridhaatu Aaroha. Nonetheless, the RCC Structure of the Project Building is 100% complete and the Building Finishes are in progress. Post completion of the same,
Reason as filed by the promoterThe Project Building Tridhaatu Aaroha comprises of 16 (Sixteen) Flats inclusive of 1 (One) Duplex Flat spread across 17 (Seventeen) floors on the Project Building. The Goods and Services Tax Act, 2017 (“GST”) was implemented to replace the Service Tax and Value Added Tax, resulting in manifold changes to the processes and policies required to be followed for selling a real estate product and for engaging contractors for Building Construction and Finishes. However, the RCC Structure of the Tridhaatu Aaroha Project is 100% complete and finishing work is in progress. Due to the GST having impacte
Litigation declared1
| Case | Court | Status |
|---|---|---|
| CC006000000395818/2024 | Maharashtra Real Estate Regulatory Authority | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000395818 | Arun Sitaram Maheshwari | Tridhaatu Vishnu Kunj Developers | 17/05/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CERSAI detailsFile: CERSAI Declaration.pdf | 5 Nov 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A-Aaroha.pdf | 5 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Aaroha - RS.pdf | 5 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Tridhaatu Aaroha 2023.pdf | 5 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold- Booked Inventory -Aaroha-2024.pdf | 9 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Cert 2024.pdf | 7 Oct 2024 |
| Declaration in FORM BFile: Form B.pdf | 17 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vishnu Kunj Mar 24.pdf | 9 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Invetory 2024.pdf | 9 Aug 2024 |
| Certificates of CA (Form 3)File: Form 3 31032024.pdf | 9 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 310324.pdf | 9 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Tridhaatu Aaroha 2023-24.pdf | 30 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Vishnu Kunj Mar - 21.pdf | 19 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Vishnu Kunj Mar - 22.pdf | 19 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Vishnu Kunj Mar - 23.pdf | 19 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3- VishnuKunj Aaroha- Mar 23.pdf | 2 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3- Vishnukunj Aroha- Mar 19_.pdf | 25 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3- Vishnukunj Aroha- Mar 21.pdf | 25 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3- Vishnukunj Aroha- Mar 22.pdf | 25 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Vishnu kunj form 5 signed 31032023.pdf | 5 Oct 2023 |
| Certificates of CA (Form 3)File: Tridhaatu Aaroha Form 3 31032021.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Tridhaatu Aaroha Form 3 31032022.pdf | 11 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA FORM 5 Aaroha 31032021.pdf | 11 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Form 5 Aaroha 31032022.pdf | 11 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aaroha - Form 1.pdf | 17 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - October 2022.pdf | 8 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold- Booked Inventory -Aaroha-2022.pdf | 8 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Aaroha 2022.pdf | 19 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A-Aaroha 2020.pdf | 4 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A-Aaroha 2021.pdf | 4 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold- Booked Inventory -Aaroha.pdf | 29 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Vishnu kunj.pdf | 29 Jun 2021 |
| Declaration about Commencement CertificateFile: Fortmat D- Vishnu Kunj- Aaroha.pdf | 22 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Fortmat D- Vishnu Kunj- Aaroha.pdf | 15 Jun 2021 |
| Details of Restarting of Construction work post lockdownFile: Construction Status Post Lockdown-Tridhaatu Aaroha.pdf | 2 Dec 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form-5 Vishnukunj.pdf | 12 Dec 2019 |
| Certificates of CA (Form 5)File: Form-5 Vishnukunj.pdf | 27 Sep 2019 |
| Certificates of CA (Form 5)File: Form 5 - AAROHA 17-18.pdf | 1 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tridhaatu Aaroha Architect Certificate 31 Mar 18.PDF | 11 Jul 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I Architect Certificate Vishnu Kunj 31 Dec 17.pdf | 28 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VISHNUKUNJ FORM 1 Architect 16 10 17.pdf | 4 Dec 2017 |
| Building plan approvalFile: Approved Plan 4.pdf | 31 Jul 2017 |
| Building plan approvalFile: Approved Plan 3.pdf | 31 Jul 2017 |
| Building plan approvalFile: IOD-Vishnukunj.pdf | 31 Jul 2017 |
| Building plan approvalFile: Approved Plan 1.pdf | 31 Jul 2017 |
| Building plan approvalFile: Approved Plan 2.pdf | 31 Jul 2017 |
| Layout approvalFile: Approved Plan 1.pdf | 31 Jul 2017 |
| PAN CardFile: PAN-Tridhaatu Vishnukunj Developers LLP.PDF | 31 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate-Vishnu Kunj.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: TRIDHAATU AAROHA-ENCUMBRANCE CERTIFICATE.PDF | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Approved Plan 1.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: IOD-Vishnukunj.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Approved Plan 1.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Approved Plan 2.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Approved Plan 3.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Approved Plan 4.pdf | 31 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-Vishnukunj.pdf | 31 Jul 2017 |
| Declaration in FORM BFile: Declaration Form B.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect cerificate - Vishnu Kunj.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Aaroha - Engineer Certificate.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: Merged-AFS and Allotment Letter.pdf | 31 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 62 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Tridhaatu Aaroha on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Matunga780+ in Mumbai City
Filed coordinates, straight-line distance. 205 registered projects within 2 km.
CODENAME MATUNGA ORIGINS
J. P. INFRA (MUMBAI) PRIVATE LIMITED
SHANTI HEIGHTS
Vipul Shantilal Nagda HUF
Balkrishna Hills
Oriental Contractors Private Limited
VERVE MANSION
SHANTI SIDDHI INFRA LLP
PRINCECARE AMARAA
PRINCECARE AMARAA LLP
Godrej Five Gardens
Godrej Projects Development Ltd.
See every Mumbai City project, with the district possession charts
Builder: Tridhaatu Vishnu Kunj Developers LLP
Tridhaatu Vishnu Kunj Developers LLP has 1 registration on MahaRERA, including Tridhaatu Aaroha. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What does it mean that Tridhaatu Aaroha shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Tridhaatu Aaroha is delayed beyond 31 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Tridhaatu Aaroha?
The registered promoter entity is Tridhaatu Vishnu Kunj Developers LLP, an others as per the filing. Its GSTIN 27AAGFT7483C1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Tridhaatu Aaroha?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Tridhaatu Aaroha?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Tridhaatu Aaroha?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Tridhaatu Aaroha?
The professionals named in the filing: Architect: Aakar Architect & Consultants; Architect: Madhuri Khandekar; Engineer: Milind Kulkarni Consulting Engineers; Chartered Accountant: S R Shelke & Associates; Chartered Accountant: DMJ & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Tridhaatu Aaroha?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback