Home / Browse projects / Pune, Maharashtra / TRANQUILITY ANNEXE PHASE 2

De-registered No litigation declared Residential / Group Housing project

TRANQUILITY ANNEXE PHASE 2

By J ASSOCIATES

RG-MH-15923 · RERA P52100024534 · Last updated on MahaRERA portal: 27 Dec 2024

Source: official MahaRERA filing

Red flags

  • De-registered
  • Completion date moved by 191 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2041Possession promisedmoved 191 months from the original
1 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 50%
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

TRANQUILITY ANNEXE PHASE 2 is a Residential / Group Housing project by J ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100024534 on 18 Feb 2020. Possession is promised by 31 Dec 2041. The completion date has moved by 191 months from the original filing.

At a glance

Project

  • NameTRANQUILITY ANNEXE PHASE 2
  • TypeResidential / Group Housing
  • Location
    • Off Pune Solapur Road
    • Manjri Stud Farm
    • Shewalewadi
    • Haveli
    • Pune
    • 412307
  • Pincode412307
  • RERA no.P52100024534
  • ReraGenie IDRG-MH-15923

Builder

  • NameJ ASSOCIATES
  • Entity typePartnership
  • PartnerRAHUL MADAN MENGALE

Key dates

this monthRegisteredFeb 2020First promiseJan 2026Revised toDec 2041

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on18 Feb 2020
  • Promised completion31 Dec 2041
  • Revised completionRevised to 31 Dec 2041 (originally 30 Jan 2026)
  • Buildings3 building records
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
G WINGNA90000
H WINGNA90000
I WINGNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 27 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 50%.

G WING22%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor30%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
H WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
I WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed69

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots69
Closed/Covered69
BuildingClosed/CoveredTotal
G WING2323
H WING2323
I WING2323

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,117 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6672.33
Proposed, not sanctioned6,531 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLAUKIK APARTMENT, PLOT NO 3 ,CTS NO 870, BHANDARKAR ROAD PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnkur Associates thorgh its Partner Prakash Kulkarni
EngineerG A Bhilare Consultants Pvt Ltd
Chartered AccountantAnkur Mehta
PartnerRole in project
J ASSOCIATES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100011104Jan 2026 → Dec 2041

Reason as filed by the promoterThat due to changes in Rules, Regulations of building plans and also due to some company related matters at present it is not possible to develop the said project. It will take time to sort out the above mentioned issues and therefore we have decided to postpone the development of the said project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2041

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE JULY 2023.PDF27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE OCTOBER 2023.PDF27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE JANUARY 2024.PDF27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE APRIL 2024.PDF27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE JULY 2024.PDF27 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ANNUAL REPORT 2022-2023 J ASSOCIATES.PDF15 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ANNUAL REPORT 2023-2024 J ASSOCIATES.PDF15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: J ASSO ARCH JANUARY 2022.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH J ASSO APRIL 2022.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH J ASSO JULY 2022.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH J ASSO OCTOBER 2022.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH J ASSO JANUARY 2023.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH J ASSO JANUARY 2023.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE J ASSOCIATES APRIL 2023.pdf17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers JANUARY 2022.PDF17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS J ASSOCIATES APRIL 2022.PDF17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS J ASSO JULY 22.PDF17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS J ASSO OCTOBER 2022.PDF17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers J ASSO JANUARY 2023.PDF17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE J ASSOCIATES APRIL 2023.PDF17 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A J ASSO JANUARY 2022.pdf17 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A J ASSO APRIL 2022.pdf17 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A J ASSO JULY 2022.pdf17 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A J ASSO OCTOBER 2022.pdf17 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA J ASSO JANUARY 2023.pdf17 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A J ASSO APRIL 2023.PDF17 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A J ASSOCIATES APRIL 2023.PDF7 Apr 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING - J ASSOCIATES APRIL 2023.PDF7 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A J ASSO 06-01-2023.PDF6 Jan 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING J ASSO 06-01-2023.PDF6 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A J ASSO 06-10-22.PDF8 Oct 2022
Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING J ASSO 06-10-22.PDF8 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: J Associates Certificate.pdf29 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEERS 2 A J ASSO JULY 22.PDF6 Jul 2022
Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING J ASSO JULY 22.PDF6 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: J ASSOCIATES APRIL 22.PDF6 Apr 2022
Disclosure of sold/ booked inventoryFile: DISCLOSER J ASSOCIATES 4-4-22.PDF6 Apr 2022
Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKINGS 04-01-2022.PDF7 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A J ASSO OCT 21.PDF7 Oct 2021
Disclosure of sold/ booked inventoryFile: DISCLOSER J ASSO OCT 21.PDF7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: J ASSOCIATES ANNUAL REPORT 20-21.pdf1 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A APRIL 21 TO JUNE 21.PDF8 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A APRIL 21 TO JUNE 21.PDF8 Jul 2021
Declaration about Commencement CertificateFile: DECLARATION OF COMMENCEMENT CERTIFICATE.PDF7 Jul 2021
Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING 30 7 2021.PDF7 Jul 2021
Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING 30 7 2021.PDF7 Jul 2021
Disclosure of sold/ booked inventoryFile: Tranquility annexe phase 2.PDF7 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A JANUARY TO MARCH 2021.PDF6 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A - OCTOBER TO DECEMBER 2020.PDF7 Jan 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: J Associates_ RERA Certificate_FY2019-20.pdf29 Sep 2020
Proforma of Allotment letterFile: Allotment lette and AGREEMENT_Tranquility Annexe PHASE II.pdf29 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_J Asso_July 20.PDF8 Jul 2020
Declaration in FORM BFile: FORM B.PDF8 Feb 2020
Proforma of Allotment letterFile: AGREEMENT AND ALLOTMENT LETTER.pdf8 Feb 2020
Layout approvalFile: LAYOUT PLAN.pdf7 Feb 2020
Building plan approvalFile: G WING.pdf7 Feb 2020
Building plan approvalFile: G WING SECTION ELEVATION.pdf7 Feb 2020
Building plan approvalFile: H WING DRAWINGS.pdf7 Feb 2020
Building plan approvalFile: H WING SECTION ELEVATION.pdf7 Feb 2020
Building plan approvalFile: I WING WORKING.pdf7 Feb 2020
Building plan approvalFile: I WING SECTION ELEVATION.pdf7 Feb 2020
Copy of the legal title reportFile: LEGAL AND TITLE REPORT.PDF7 Feb 2020
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf7 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: G WING.pdf7 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: G WING SECTION ELEVATION.pdf7 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: H WING DRAWINGS.pdf7 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: H WING SECTION ELEVATION.pdf7 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: I WING WORKING.pdf7 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: I WING SECTION ELEVATION.pdf7 Feb 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archetect Certificate.pdf7 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.PDF7 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Form 2A.PDF7 Feb 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE.PDF7 Feb 2020
PAN CardFile: JASSOCIATES PAN CARD.PDF1 Feb 2020
Details of encumbrancesFile: MORTGAGE INDEX 2.PDF1 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER.PDF1 Feb 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 191 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TRANQUILITY ANNEXE PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Manjri Stud Farm13,700+ in Pune

Builder: J ASSOCIATES

J ASSOCIATES has 1 registration on MahaRERA, including TRANQUILITY ANNEXE PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that TRANQUILITY ANNEXE PHASE 2 shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if TRANQUILITY ANNEXE PHASE 2 is delayed beyond 31 Dec 2041?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TRANQUILITY ANNEXE PHASE 2?

The registered promoter entity is J ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TRANQUILITY ANNEXE PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TRANQUILITY ANNEXE PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TRANQUILITY ANNEXE PHASE 2?

The professionals named in the filing: Architect: Ankur Associates thorgh its Partner Prakash Kulkarni; Engineer: G A Bhilare Consultants Pvt Ltd; Chartered Accountant: Ankur Mehta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TRANQUILITY ANNEXE PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRANQUILITY ANNEXE PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRANQUILITY ANNEXE PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.